HomeMy WebLinkAboutAPPLICATIONS & DOCS - 95-00015 - Papa Aldo's/Papa Murphy's - New BuildingDate Of Application
OWNS
Name
APPLICATION FOR BUILDING PERMIT
CITY OF REXBURGF IDAHO
I
CONTRACTOR
Name
St re et Addres
Street Address
Mal".1ing Address
Mailing A S S Z4
, e"O r r
1.
C'tyr State Cit state
IPL......Telephone Z i P j��S�P Telephone
Architect or EngineeringFirms jklol "
LEGAL -DESCRIPTION
Lot Noo Block
Job Address 21,
Prose Tnf -rm � �
Residence
Fence
structure,
Patio
TACH COPY IF NECESSARY
Subdivision
J4- 1.
Uumpierea ny applicant)
mrrt
i Gov
F
Carport Garage
Religious
°
Awning
Wim Repair Renewal
Total Floor Ares. O4 Number
HigdiSq.
-
footage: -ZUnfinished BasementJ
n i tmln-inA v
What will structure be used for
applicable)?
HAPAj _�,
® # -
�°,.d°.,
(incltWe nam 4 7 *> 4?
r a
{ a
JL UBE:
1.0 multiple tamily (apartments)
use Classjf
Group
Type -
Construction
If" *s;p !2
0U.LLQing PermPermlt Fees
Plumbing Permit Fees
Water & Sewer Hookup fees
Signature l
Signature lli Tnspecl
Issued by
Plan Ch
.t -of dip kation
OWNER
Name
Street Address
Mailing Add
Cwt
.gip
APPLICATION FOR BUILDING PERMIT
CITY OF REX, IDAHO
Permit No.
CONTRACTOR
NameoiJ'��
Street Address 6 �,G60ttl S 7-0741�
Mailing Address
City State
Zip
Mobile Telephone
Architect or Engineeringfir
Ida # LIC.
LEGAL DESCRIPTION -(ATTACH COPY IF NESESSARYTIJ
Lot No. Block Subdivision
Job Address
Project Information (To be cOMpleted by applicant)
h
Residence Comm Educational Gov It Religious
Fence Pati ort
wffimmwh�Awns
Structure: New Remodel Gararvim
�� aim Renewal
Total Floor Area
Number fr f
B i
Sq. footage:
Unf inished Basement
Finish
r
What will structure be used
dor include name of busines, Qr
applicabie)7.
1.
If' us -e is Mult*ple faraily (apartments) how many unI-Lts Y
Estimated cost 20
Jr
UBC Use classification }
Tax Code Building
Building Permit Fees 0*
_5 --
Plumbing Permit Fees
Water & Sewer Hookup fees
Signature of Applicant
Signature of Building Inspector
Issued by
Plan Check Fee
Digging Permit Fee
OtheriFees
F -M
LA
I j,
lolk
q
46
Lm
I
p
Uri
'n
z
PM
m
m
C:
n,
ill
2 D
m (j)
C7 2
a-
(Z
m
V
rn.
m
z
I
0
N
0
m
z L
0
M
Im
Li
01
0
m
L31M
zl>
G) 0
'.-k-
0
I
I
-f
m
C
3
52
3
0
&0
en
CDCA
(a
0
0
w
-1A r -1
"-n
m
m
a .
P,
0
2!i
m
ILO
c
2
m
m
-0 -4-
CD =r
5-P
cD CD
UD 3
0 ;z
x via
0 cn
0
0 (D CD
6- CL CL
w 0 (n
cr = c
Q cr
qi
0) CD
=37 &A C)
CD (n
CD 0
CD
zr CD
Cc
to CD W
CA
0
tn
CD W C)
CD
cD CD
'a- 0 a
(D
Z3
CD
o
CD cn =3
MEWW.
(n
T..0
0 �t
::E CD Co
w 0
41�4 o
CD
ch
CD
CL
CD
0 W
0 0
< 0
CD CL 0
W z r
CD
CD
CD rr
CD cn >
CD cr
CD
I<
w
to
CD
0-
0
>
m
0 0
c
cn
ri
11
0
m
cn
m
M
m
z
0
m
0
m
0
LJ
0
M
Z
>
-C
0
m
rffiqo
m
0
cc:
cn
mr
-;47
kF
CD =r
CD CD
0
w 0
70 cr (n
ma (D c
ft� CD
Zi- a a-
■
m 0 CA
CD
CD %MEN&
Cb PMIP.
M"l 4 -ml -
CD =r 0
pomopp 0 .o
0 =r
�CD
CD
CD
-0
.0
:3
ch
0
CD 0
0
Ilk Fn s
CD -a
CD (D
0
CD
CD
3 0
CD
0 c
CD =1
0
cr 3
CD
o
ACD (a r
F 0
"Imt. 0- 0
:;Zp
?5 CD
COL. ffi Ej- CD 6
(D W
0- L
< N rC
0 't
rr
:3
=3 0 (a
(n
#-q
m
CD
w
CD M
(a
C: 0
(D
X
w
cl
Q
�w
(D
cy
QD
AOM
0
-M
d
�A
klw-1
�Sll
a
I
I
d
M"
m
m
E
.31
a
I
I
d
M"
m
m
E
.31
Excavation &
- Earthwork:
Concrete
..
Q
F
SUBCONTRACTOR LIST
Masonry;
PEPE_
Roofing: f74
Insulation,
Drywall:
v
P a int a_n
FloorCoveril-ngs.
e
0 701+1? 'me S
Plumbing
s�L�s i`�I���i � ����1� sw�w�•Y�w�•ww •f�iti�l•nf�•f��� 1�••I�Fw�•F
Heat
� .
a. ng
ra.
1 ect r ic a 1 f we jr'e )-e c,
SPECIAL CONSTRUCi'ION
(MANUFACTURER OR SUPPLIER)
Roof Trusses:
Floor Ceiling Joists:
Cabl"nets: _ (/�,�►�,� �o. ��-�
Siding/Exterior Trim:
t
0
IyP
F
r CITY OF REXBURGy.
Building Inspection Sequence
F
INSPECTIONS
Types of Inspections: For on,Bite constructiont from
the building official, upon not if kation from the permit holder or his
agent, shall make or causemade any necessary
either approve that portion the construction as completed or shall
nota'.fy the permit holder or his agent wherein the same fails to comply
with thiB cod -es.
19 L o Lot corners stakedr B eking in place for building, prior t
excavation.
2. Foot i Commonly made after poles or piers are set r trenches or
basement areas are excavatedb Forms and horizontalreinforcing in place,
vertical reinforcing cut and on job site or tied in place.
3. ona n Te ion � The foundation inspection Sail include
excavations for thickened slabs intended for the support of bearing walls,
partitions, structural supports, or equipment and special requirements
wood foundations. All forms and re2Mforcing steel, etc., shall be in place.
4. Truss Inspection: Designs and installation information must be
submitted to the City before delivery of trusses. InBpection of tresses to
see they meet shop drawing requirements and that they are installed and
bracedadequately 9
.linin ni a andElectrical:Rough in p ion: Commonly
made pri'Lor to covering or concealment, before fixtures are set, and r for
to framing inspect ton i
6. Frame and amy Ins2ection: Commonly made after the roof,
masonry, all framing f ire. stopping,, f stopping bracing are in lace
and after the plumbing, mechanical and electrical rough ins ions are
approved..
t. LiaLn ana/ori
t
Inspection:
fasteners are taped and
Commonly made
after all
lathing
and/or wallboard
Lnt r for
is
in place,
but before any
plaster
is applied,
or before
wallboard
joints
fasteners are taped and
finished.
Final
Plumbing -and
Heatinq
Inspection!. All systems
in n1ace.
fixtures set, r f o r occupancy,
9. Final Electricals- Fixtures and
completed in panei .fox
10. Final ins action: Commonly made
ready for occupancy.,
11. Occupancy Permit: Issued when,
ready to occupy
wall covers
in places. Directory
after the building
n final inspection,
i * C)t.ner Inspections: In addition t
building department may make or r i.r
compliance with this code and other laws
The permit
jobsIte.. in
ffi i l to
the Permit
INSPECTION CARD
he called
any other
enforced
holder or his agent shall post the
n accessible and conspicuous place
rake the required entries. The re
holder until the f incl inspection
4
is completed
building is
and
inspections above, the
inspections to ascertain
by the building department*
n sped i on record on the
to allow the building
cord shall be maintained
s been made and approvedf
I have read tete above and will comply in my requests for inspections
by giving �"I HDuTR 1VU�'ICE privr for insnertinn to ha m.yrie>
Electzicai:
Building & Plumbing:
County Plumbing:
-. (8: U
59,302
65Yp-7210
r�usoo�
1303 6,a(mv 5Z3 -D681
NORTH
1.
.,e
{
NILE L. BOYLE
MAYOR
ROSE BAGLEY
C LER K
lHB HORNER
TREASURER & FINANCIAL WICZA
October
1r 1995
Scott Meyers
Papa Murpheys
64 North 2nd East
Rexburg, Idaho 83440
Dear Mr Meyers,
STATE OF IDAHO
. BOX 280
12 NORTH CENTER STREET
REXBURG, ID H1 83440
PHONE (208) 359-3020
FAX (208) 359-3022
I am writingyou with regard to, the Landscaping Reqahem
Murphey's. It has been determined when you built your
landscaping requirement of 10% of parking amounts
The landscaping you have amounts to logo square f
eet leaving a deficit
of about 339 square feet* Mr Manwaringand Mr Lai
rd have talked you
about this and you agreed to add the required landscaping.
Sail have not complied with the ordinance wi-th the required
IandscaP3-ng. We still have not issued you a business license because
you are not in compliance. Planning & Zoning
temporary Occupancy Permit, but 'f you do not complyr we will have to
revoke this pe irm't and take further action.
Please contact *thee Joe
fi Lain. or Rose Bagley and discuss how quicklycompliance
with the ordinance,
Sincerely,
i
Rose Bagley Cit Clerk
a
SC �
�+z
fii r r -M �o f� �'� 'rG�
avpy
eoe �drG 0
O✓�
:.41
�e9-
00�