HomeMy WebLinkAboutSITE PLAN PROBLEMS OR QUESTIONS - 95-00013 - Dr Mills Medical Office - New Building19 7s�11gTii►Yili� UESTIONS REGARDING THE SITE PLAN FOR THE DR. RONALD MILUI:-'s PROFESSIONAL BUILDING 1. According to the Zoning ordinance the building should have a 25 ft, setback from the l st South St. right of way line. The plans show around a 17 ft. setback. Utilizing Section 4.9 - Exception to Setback. RQuirem and averaging the setbacks for- the existing buildings to the west of the proposed building (Setbacks = 20,17.5 & 8.5 ft. = Avg. of 15.3 ft.) one gets an average setback of 15.3 ft. for the south gide of this block, indicating that the approximately 17 ft, setback shown on the buiuld'Ing plans would be O.K. 2. The ultimate building sire of 4,72.0 sq. ft. (times 5 parking spaces per 1000 sq. ft.. of building) requires 24 parking spaces. The first -phase building sire of 3,730 sq. ft. requires 19 parking spices_ The number of parking spaces actually provided = 21 which is not adequate unless additional future parking spaces can be shown to be available at su-ch time as the building is expanded. 3. The approved Subdivision Improvement 'Drawings for the subdivision show a 6" waterline and an S" sanitary sewerline being extended to the south through the parking dot area east of this building. Have either of these utility lines been installed? Who is responsible for installing these required installation? sewer and water lines? Is fir. Crouch or Dr. Mills responsible for their mate that the depth to solid rock is not very great in this area so the cost of installing these utility lines could be very substantial. The Developer of the Subdivision is normally responsible for install'Thig the fire hydrants and waterlines, sanitary sewer lines and manholes, storm drain lines,. manho�es, inlet boxes, etc_ Note that normal subdivision development items such as street ligbts, street centerline survey monuments, lot corner rnonunlents, and street signs all need to be addressed also. 4. The parking dot layout and landscaping work completed by Dr, Crouch does not correspond with the "Original" subdivision parking lot layout and landscaping plan that were previously approved by the Planning & Zonin gor Commission. Similarly, the proposed parking lit layout and landscaping plans pi-oposed for the Dr.. Mills building do not correspond with the "original" plans approved by the Planning & Zoning Commission. The Planmng & Zoning Comnu-ssion will have to review these existing and pi-oposed perking lot and landscaping plans to to see if they approve of these charged versions of the originally approved plans. 5. A 5 ft. wide sidewalk is required along the south gide of I st South St. with a connection back into the parking lot along the projected extension of Ash St. This could be a curvilinear sidewalk as sketched -in on the site plan. 6. A 5 ft. sidewalk also needs to be erAended to the south at the southeast corner of t ie building's parking lot to provide for foot traffitc to the other future office buildings that will be located farther to the south of the subject building. (See approved play that shows other lots to the south.) 7. Curb and gutter needs to be extended around the corner and connected into the existing curb and gutter on the south side of I st South Street. There will need to be a depressed handicapped ramp installed at this corner, which will affect both the curb and gutter and the sidewalk. 8. Asphalt Pavement and Base Gravel need to meet City Standards for depth and quality of materials for those portions of the 1st Sough Street/ Ash Vit. intersecfion that are within the designated "Public Right of may". It should be noted for the record that the public strut ends at the youth Right-of-way line of 1st South Street, and that south of the south right-of-way lige of }. st South Street the developed street and parking lot will be privately owned, operated and maintained by Dr. Crouch or the group of Doctors that eventually construct budd'ngs on all of the lots in this private subdivision. 9. Depths of asphalt pavement and base gravel for the private street and parking dot have not been shown on the plans. 10. No curb elevatIM ions have been. shown on the south side of the southerly parking lot, Also, haw do the proposed curb and gutter and asphalt pavement grades match with the existing curb on I st South Street and with the existing asphalt paving and landscaped median strip hand curbs) in the exisfing parking lot that is east of this proposed building? 11. French drains for stonn water runoff will not work satisfactorily in this area because solid arae is so near the surface of the ground. Therefore,, a storm drain line from the proposed storm drain inlet boxes will need to be extended farther to the east past Dr, grouch's office to connect into the existing storm drain line that is located along Dr. CroucIf s east property ling, [3r. it could tie extended across Dr. Crouch's parking lot and connect into the e�cist�ng norm drain ling and inlet box(es) in Dr. Crouch's parking lot. This storm drain line should be located both horizontally and vertically so it could be used by the remaining lots to the south. these remaining dots will have to install separate starm drain lines from said lots wMch X11 have to drain easterly and connect into the existing storm drain line along the easterly side of said yet -to be developed lois. 12. site plan. A R.Qrmanent location for the trash dumpster needs to be established aspart of this 13. There needs to be a heavily screened landscaping strip (az- fence) between the westerly side of the parking lot and the adjacent apartment house to the west. (See Zoning Ordinance, Section 4.7 - A. Screening Requirements,, Subsection 1.- Parking Areas.) E� E 0 IL_ . 'enc intend Screening r s . Screening and fences within the City shall be maintained 'n conformance with the following W Screening Requirement constructed and standards: Parking Ames. An offective buffer shall Id between parking areas for more a (5.) vehicles and existing residential uses, schools, hosvitals, nursina homes and other i tt ions for long-term human car shall consist of a mininium of a four stripo be plantedwith shade trees ars suitable fence otherwise i this ordinance of sufficientheighth screen the two parcels, as specified and Zoning Commis ion. (Amended the October, 1993 Ordinance No. 753.). The buffer (4) foot landscaped and low shrubs, compliance with anddensityto by the Planning 20th day of 2. Commercial/Industrial Uses. Where a comers lal or industrial use ad residential residential zones, or undeveloped l and shown as residential on the Comprehensive Plan, there shall be provided alone the abutting property line a yard equal in width to that required in the residential zone, The yard shall be planted with combInation of shade trees, low shrubs, and ground cover, am a suitable fence otherwise In comp -fiance with this ordi'nance of sufficientight and density to screen the two parcels, as specified by the Planning and n CommL * 11 Amended the 20th day of October, 1993; ordinance No. 753.) iii Density Residential Uses. Where a lot in the HDR district adjoins a lot in the LDR, LDRI, MDR district or unincorporated land designated a single family i the Comprehensive Plan, a seven (7) foot wide landscaped r shall be provided on said property line. The buffer shall consist of ground cover and trees. The trees shall be planted at forty foot intervals When a public street is located between the rout lot line of the IIDR zone and the single f axil zone, a landscaped buffer seven ) feet wide shall be constructed and maintained on the font lot line. h u shall include trees and an understory of shrubs., The landscaping shall be planned and maintained so as not to violate section 4-6 of this ordiLnance, 4 2p.en torn areas. Open storage areas in D zoneo 5hall be screened from viLew of the streets by structures or by a landscaped .strips a 32 E