Loading...
HomeMy WebLinkAboutADDENDUM #1 - 95-00012 - Madison Memorial Hospital - Expansion Phase 1Item 1 Item 2 - MAD'SON MORIAL HoSpili PHASE ANSION REX':B i ADDENDUM #1 13 APRIL 1995 Rork Removal: After r'�,nt--„-.�..,... � _ _. APR 17 1995 . I litr +, dal ftp fl:rll, --_ �--; .�u114�aC+-u_L �a�s excavated topsoil, earth and loose rick from area of I12W footingst Architect shall be notified to surv� pubic yardage of rock to be removed. Contractor shall be com en.sated an a unit price per cubic yard of rack measured in placepriorblast.zng. All blasting shall be perfor�ned under strict cto & subject t0 Structural Engineer's approval to i�s�.reprotectionv�s "f adjacent facilities. dote: The test probes taken than minimal encountering of Contractor has not included Sequencin Schedule; base Bid. �C�T�i 1 7""3 r�r1.r +. ...�� � _. do not indicate anything rock. It is understood the cost of hi a<zt; r, ; Wither that the did. �+Vi14j[A �/GY� dynes tv accomplish all portions of word to the fullest extent with the understanding that the physical therani cafeteria as well as the other hospital �un�tons can stay operation as long as possible. If construction of tem'porarydust�and sound proof walls are necessary cflntractor sha cast of such in the did, ��- include the Item 3 Tree Removal As described in the drawings shall be accomplzsh�d by not apart cif this bid. pand Item 4 A pp royals Montgomery Elevator is approved to bid. �t.� Builder's Risk Insurance The General Contractor shall be responsible toprovide the Property Insurance as described in the General anditians sect° I�.3. ion Item -6 ProiF ect.ion Screen Shown in Room 112 shall be Provided by Contractor.Architect for exact installation. Provide electric�.los�rvi�e1a� required. Item 7 Item 8 Coat Racks Section Ia 910 Specif icatians. furnished. Entr Mat (SPecification Delete from contract - shall be Owner attached) Item 9 Interior _Signage shall be drawings AD -1 & AD -2. provided by contractor as per attached Item 10 As halt Overla (Specif ication attached Section 02 575 and 02 576.. Item I I Sidewalk �x ansion ,Taints shall be 24 ft. ofc instead, of a.s specified. . Item 12 Steel Ladder Detail FIA7 shall be prefabricated. a� described inSp�ecif icatian Item 13 6 f Water Service shall connect at G" fire Ine located 25Q fee sauth. See sketch. Repair all damage. t Item 14 Drawing A,19 Delete notes #80 Item 15 DrawincrA15 All hardwood trim shall have 1/4" chamfer @ e� �edges.p sed Item 16 Detail GZA15 Do not exceed 1/411 overhang on sill. Hem 17 Drawin 2 SD2 should Reference E/SD2, Item 18 Corridor A030 should be labele1d A031 - finished the same as A018. Item 19 Handrail detail 8/A9 sha11 ba rail han,d.rail with supports @ 81 O/CAP vertical Item 2 0 Draw,'n g A15 Details E. G. T, and V shall have a 2 x fastened flat tO CMU at ri.gid insulation termination4 nailer item 21 Drawina A14 All doors labeled, ."bro s ae store front and shall have 4 1/2" aluminumiframes�4dized aluminum Item 2 2 Draw*n Dl: Note 12 shall ready remove aluminum store doors. ore front W A SECTION 02 575 FENT REPAIR A&R -02575 1.1 SUMMARY A. Includes &Ln Not Limited To 2.. Repair cracks in existing Pavement• Remove anreplace Paving and base in 'sPeclfic areas as de I das ebed r COrftract D B Related Sections scdtled in COritract - .t. 1.2 Section 02 001 General Siteworkit ements REFERENCES A. American Society For Tung And Material 1. ASTM D - (1989) Bail A ppar-atus)� Method for Softening 2. ASTM D 111-86F "Standar Test Method for Laborato Ity of nous Materials:, 4. Modified Effort,@ ry Paton Characteristcs of S ASTM D 3407-78r "Stanctard and Asphalt MethOds e -r 1.3 SUBMITTALS A. See Sectors 0 1 300. dr. Quality ASsurance Submit certification frOm manufacturer confirmw g crack sealant Propertes., PART 2 PRODUCTS 2.1 MATERIALS A. Crack Sealant ous blend of asphalt cement and plasti produce material with f011owing properdes . cuers Combined in Such a manner as to a. "aterial fall Pour readily a mPeratures Cone Penetration at 77 C. F1. - Maxi I fence at 77 deg IF when tested in accordance whh ASTM e. Mini -MUM - 50 Percent Softening Point When tested in accordance with ASTM Ductility at 7-7 deg F 6 - 210 deg F minimum CM , 5 cTn/min when tested in accordance wM ASTM D 113 - 3o - fill - 1 / ink i duct condi ones tO minus 20 deg F shall be capable of being h. without cracmng.g angle over one in Mandrel in A-Vh-alt Compatibility when tested fn accordance with ASTM D 340-7 pa's's sCur'119 Product shall IcOntain Immiediately 2. Approved p Cooling " ' - f� sell car Manufacturers _ nt ung by traffic, 2. Crafcoj, Chandler., AZ Industries, C. Maxwell Products., Salt Lake City, Utah 1 02 575 Pavement Repair At Soil St rflan 1. Approvoducts _ Arsenal w MiXture of Roundup and Surflan C. Base - R aa d Ba -se type gravel or crushed rock S' Wei t Passe Sieve 3/4ff 100 #10 45- 60 #200 30- 50 5 - 10 (non -plastic) D. AsPh-altic Concrete PART EXECUTION graded As sPecified in Section 02 510 or 576. .1 PREPARATION A. One week prior to beginning CTack repair rate recommendedr ons., treat `` s F by Wirer - -i Of After weeds have diedr remove by using wire wheel on crack cje n 1 . PERFORMANCE A. Crack Repair Using carbide tipped router bit ro width tO be �sbn crate measuring bletween to in 1/2 inch Wide i rout crate Codiimum, Do not 2. RoLirt � t Inch dee . clean routed and r L ty applied crack � royal, minimum, not t psi and IGO CU ft'per 3. CraCk sealant to full depth 'of rn when c:racks are wet or Muddy- minute, crack.on handwand leaving sealant ee or device S Inches maximum. lot. n i toflu-sh with p � -P sealant on concreteG Paving and concreter do not allow excess shall beRepair Of ort areas Cut edges Of Pavement in rectangular shy pe and for one f.0 material. Make kcal cuts using Pavement saw inimum beyond damaged 2. flat chisel point, routin machine, or.jack hammer with Remove rubble to 3. Bas . to re-establish sound base. a. 6 inches tib -ni . b. Compact t5% minimum .ire y determinedb 1 feet.Course shall be true to in plus or '4. - Apply Soil sterilant at .� ate r6. ecomme ion to base and tack COatu acturer. Apply asphait as d in Section 02 5 rtical edgesof exisfi'ng asphalt. be used for a errma y CLEANING eas tOO small 1rator Plate COM r Pr equipment. A. Upon tion o repair operations. END OF SECTION 2 02 575 Rant RepAir PAVEMENT RESURFACING PART I GENEp4L Furnish and " rpt l t oveday I ing Paving as l i(;OntraC;t d en 1-REFERIENCES A. Amen"Can Society For Testing And Materials I ASTM C 131 -891 '"Test Agfiregate by Abrasion and i ize Coarse Method for Resistance 2. ASTM D 1 �rnPact in the ethojthe Angeles Mach- Effec_t 3. Bituminous Mixture's er on Cohesion of Com 4. Modified Effortm ctCharacteristics ASTM D 7559-89sing for :ice 5. Using Marshall ApMratusn low of Bituminous Mixtures ASTM D 1-�"SPecification It Cemerrt for Use in A. See SeCtion 01 300. Quality Control Submftlahs I . Mix design of asphalt concrete mi iCopies of test results from ruure r r � conducted to ass 1.4 ance to MT QUALITY ASSURANCE tion A4eefing 1. See Secfion 01 200. after repair Pavement t PART 2 PROD T 2.2 MATERIALS A. MIXES A. Pavement 1. Asphalt Cement Meet r .ecluirements of AST Conditions grade (Original Asphalt) AC 10 in moderate rA- . in hot conditions 2. Aggregates -Fi.Imatic di ons r coarse Aggregates o have wear I� _ neral filler suitable for aiLe v et %b W40% as € by ASTM C 131. 318 Pain Sieve entf-a l Plant hot mix. - 71 -3 - 8 (non -plastic) I 02 576 Pavement Resurfacing OF W h PARS 3 EaCECLlTf 0N lje-velop rnix des"O shown by teeMethod to achie've content. t data curves based On testing samples cOnta''mum <-3,sphalt content as Sarnfiles shall i ud ,n- twO n i n 11 % increments Of asphalt O With '� content toMake tests in accordance i p It nt rnurn.o tmum and with FinalI M 1 n Stabil mect following criteria - b, Flow 'tY 1200 pounds minimum. C. Air voids minimum, Maximum. maximum. 'voids in { e. Ineral aggregate 15% minimum, Asphalt cemenrt by Weil ht of Strengthr j r Dry psi 9. Index Of Retained Stren 3.1 I STA A. Interface With Other Work Do. not apply Oveday UrrUl COMPletion Of Pavement re - Apply tack coatuniformlySeri 02 575. PIY bftuminous overlay haft Istri Utor a -t 1110 gallon Per sqLiare vjrr41L3Arj%%rA4i cOmpaCtion shall be I -with laydown uniPerr o 112 inch mini t Thickness der Compact o between m density } E. Finished surface shall be fr f. I in accordance th ASTM D 1 3-2 F1 dr- . clean, and Site Tests foOt sUaigh-tedoe.. in excess of 114 inch when te-sted wfth I END OF SECTION 2 W 02 .576 Pavement tng 'i � _Y�i� �� — =�" �. �— = _ � _-Y, • " fir, �. - --•� - '� �' MI 7*i�.____ MU N - J" • #12 _ AA T + , -1 r 7 r o _ ' ' -d :"1TG' y --��T o -+±tee+' ` • -f. dG" s r 1 � � - . �T T� � ±` T' °���/ its}S+ � + i':T�• � �� Jr jr TRANS ERI ........... ipr •.+.- � � �, r` � � _, , '� � 'e, `, a - '�s� �.�.+�} d•�;'+rte,•+` � `�Ty��'''ti7' y + _--- �.r j �. '� - •`-,� - - ''� � _� * 4; ���'s_a;sem '��*�R'�Yy d �3: '_ L. c '�- � _•—'_� ��ar �e - i'� _' l � �� �l`�`��F ♦°} � ` • 'a'T�s�Fi hiaT4 k }�. i -•' — r"fir � — T—�`��—, _ a. � d .• '-- �* �+T�" +T - �`�#t ��* ��.��+���.�} �},+}� '+'h'h�'�� sr.;a�?,�,V� 4 ry * _ l' .. ��. - _ T � • � �z � y {�+ ' _t , •.•.�"�.-�.T � 12F' + ���.�� -` + .�L a�.�cs+��Y' • S +,� ,�y f ,fps _ _' i •�� w - ! � . —.... .T-..�— � � '' �' �- - � `'r'�t*{*�+`�*-•.-;*c: ��$�y��d�E-'.-rn�Tr _ . y �; ; �,�� �.:'ti `%+4�y�p.`- ti+.r +�+ '� `;J4�•�*7! f � � � _ — <•�, . - � }' - F . d +� :��1®� +at-i.��:Tl i='�+ 'e.�� *��u•�+S�+i ;e��tls. �r�' - ,�*� sr� P.'�.*a.T,++ ,' a£{� * i`}i *'�l k•*a� _ - - j } Oi � r < s � r _ y� �! a !<�dG-QST{i31• . � � + - r M+Cay�+.:W,—++� r rf ,e.' ,� -� '� f -'°4F����'�'�'�`+ #r :*1�L�.*�r` �h'C�'Ps'+' � •*4.�r� ;�f' -��� r ar y a j� =may e •' +� � ' . -u �T,��T` _ .r,T�, _ - *� ' ]�11•�a�`i+tea.+'�`�a�s+ - _.. t 2 --------------- F IF —Npb rT Y �� Yom_ � � + �,� a '* �:�'�`+'$k.*F+,;i ".TiSM�d�.+� 5•.� , ,�tt« :F.'£*s.�* .+� r�� � � • � +'" fir`' �-� riTY a.'��*..�� #� i � � ' -'� � --' —. � .vim r � • #-. �! rt���p�q��-•��y�A r I - + i - r 3 i - y -JEW /jIL'7 I o t + 9 y a r + I y T y 7I 0 •6� D LPJ WV{ ffr� i-- J of 4 f �f 4 t s / r 19 F A z /Y F• /sl � :f �a i! SPECIFICATIONS: 05 3 11: ALL METAL DECK SHALL COATING. PHASE ONE SHEET S-4: BE GALVANIZED WITH A G-60 1� ADD # 4 NOSE BARS IN CONCRETE STAIR SLABS SUSPENDED OR S ON GRADE . , EITHER Z) THE, "ASONRY WALL BETWEEN GRID 89 AND 90 FROMGIZID A-5 TO D.,5 mu X-A.&E DIA WLTHE GRIDS F AND G FROM 9ITOONAL 2ALAND WWALLESTBETWEEN WALL O THE ELEVATOR SHAT.T BE 10^ THICK, REINFORCED AS PFS THE NATE OH SHEET S-4 FOR 8 " WALLS. VENEER SHALL BE PER THE ARCITECTS DRAWINGS. SHEET S-5: MASONRY WALLS ARE 811 BLOCK WITH BRICK VENEER PER THE ARCHITECTS DRAWINGS EXCEPT THE SAME WALLS AS OUTLINED ON SHEET S-4 OF THIS ADDENDUM 10" TjJjcK, REIRIFORCSHALL BE E WALLS 5-4_PER THE NOTE ON SHEET SHEET S-6: DETAIL 1, THE 2- # 6 TOP A19D BOTTOM BARS SHOWN ARF IN ADDITION TO THE WAIS, REINFORCING SHOWN ON THE PLANS, SHEET S-8: DETAILS B, g, 10, MD 14; REVISE DOWELS TO THE WAlJ,S FROM THAT SHOWN TO BE #5 AT 16" ON CENTER. THE SLAB REINFORCING REMATNS //4 AT 12" ON CENTER,. ALTERNATE ONE: SHEET S3A: 1� MASONRY WALL ON GRID 92 SHALL BE 10" THICK ?,ND SHALL BE REINFORCED WITH 1-j{5 AT 161f ON CENTER VERTICAL AND HORIZONTAL AS PER THE DRAWINGS, 2) AT THE MAIN LEVEL FRAMING PLAN TH BETAIL SHOWN CUT AT GRID 9 4. 5 AND M , AND GRID 9 4. 5 AND H SHALL BE REVISED TO BE AS PER THE ENCLOSED DETAIL . 3) AT THE F40TING PTAN, THE NOTE Fo REINFOFZCING IN THE WALL ON GRID 92 SHALL GOVERN OVERTHA'' SHOWN IN DETAIL 1/S4A AND 4/54A. 4) ADD #3 NOSE BARB TO ALL STAIR SLABS ON GR1�DE SUSPENDED STAIR SLABS. SHEET S4A: aETAIL 1; 2-3'6 TOP Aun AND GENERAL NOTE OR W-x-r,L g�=•�� Ur, '6� ADDITION Tn SHEET SSA: DETAIL 8; BE 14 AT 1 41 OR NOTE REINFORCING. THS REINFORCING IK THE FLOOR SLAB SHALL 2" ON CENTER EACH WAY . sLCTzorr 09 670 RUBBER CARPET TIIEES 1. 1 1.2 1_ 3 1_4 A. Includes but not I -L mxted to 10 Furnish and install carpet drawings. Be Related work 1. Section D 9 Guarantee tiles as located on X81 Floor preparation A. Provide Manufacturer's standard Product A. Flooring 1• 3/8 thick 2. 3. 4's I .0 synthetic r-11htAnb-r- glass cloth backing and cut Calor: By architect. Adhesive: Best grade by Basket -weave pattern. three year guarantee_ wI nylon fibers handed to �0 12" x 12" size. manufacturer,, A- Approvals 1. Futures Inc. Upland California 2,w EZ Dorado Velvet Tile