Loading...
HomeMy WebLinkAboutBP - 96-00037 - 0500 Mechanics - Storage AdditionINSPECTION RECORD CITY OF REXBURG I I BUILDING DATE APPROVED ISSUED T0: I I 8th Final NAME: ?40 PERMIT # 9th Occupancy .............. FOR THE CONSTRUCTION OF: �.9&1rr�.t.J� JOB ADDRESS:.3 41SP. ELECTRICAL GENERAL CONTRACTOR: P&4�I4,SAY a '0S ,L0' JU I I 1st Groundwork ............ This permit is issued subject to the regulations contained in Building Code and Zoning Regulations of the 2nd Rough -in ................ City of Rexburg. It is specifically understood that this Permit does not allow any Variance to the regulations 3rd Final ........................ of the City of Rexburg Building or coning Codes unless specifically approved by the City Council and explained on the Building Permit Application as approved by the Building Inspector. I PLUMBING Date Approved Issue y 1 st Trench ..................... /! * V40*L4 a 9�� I - 2nd Service Connection Building Inspector 3rd Rough -in ................. THIS PERMIT DUST BE PROMINENTLY DISPLAYED AT THE BUILDING SITE 4th Heat Cable .............. THE BUILDING MAY NOT BE OCCUPIED OR USEDWITHOUT FIRST OBTAINING A CERTIFICATE OF OCCUPANCY . No work shall be done on any part of 5th Fina! ........................ 1) A complete set of approved drawings along with permit must be kept on the the building beyond the point premises during construction. indicated in each successive For Inspections Call 359.3020 0 C N TI E 2) The permit will become null and void in the event of any deviation from the inspection without approval. No 24 Hour Notice accepted drawings. structural framework of any part of the 3] 'No foundation, structural, electrical, nor plumbing work shall be concealed building or any underground work A CERTIFICATE of OCCUPANCY CAN NOT 8E ISSUED PRIOR without approval, shall be covered or concealed without To FINAL ELECTRICAL & PLUMBING INSPECTIONS, approval. 1 st Layout ..................... 2nd Footing ................... 3rd Foundation .............. 4th Truss ....................... 5th Framing ................... 6th Drywall .................... 7th Sidewalk ................. r ISSUED T0: I I 8th Final NAME: ?40 PERMIT # 9th Occupancy .............. FOR THE CONSTRUCTION OF: �.9&1rr�.t.J� JOB ADDRESS:.3 41SP. ELECTRICAL GENERAL CONTRACTOR: P&4�I4,SAY a '0S ,L0' JU I I 1st Groundwork ............ This permit is issued subject to the regulations contained in Building Code and Zoning Regulations of the 2nd Rough -in ................ City of Rexburg. It is specifically understood that this Permit does not allow any Variance to the regulations 3rd Final ........................ of the City of Rexburg Building or coning Codes unless specifically approved by the City Council and explained on the Building Permit Application as approved by the Building Inspector. I PLUMBING Date Approved Issue y 1 st Trench ..................... /! * V40*L4 a 9�� I - 2nd Service Connection Building Inspector 3rd Rough -in ................. THIS PERMIT DUST BE PROMINENTLY DISPLAYED AT THE BUILDING SITE 4th Heat Cable .............. THE BUILDING MAY NOT BE OCCUPIED OR USEDWITHOUT FIRST OBTAINING A CERTIFICATE OF OCCUPANCY . No work shall be done on any part of 5th Fina! ........................ 1) A complete set of approved drawings along with permit must be kept on the the building beyond the point premises during construction. indicated in each successive For Inspections Call 359.3020 0 C N TI E 2) The permit will become null and void in the event of any deviation from the inspection without approval. No 24 Hour Notice accepted drawings. structural framework of any part of the 3] 'No foundation, structural, electrical, nor plumbing work shall be concealed building or any underground work A CERTIFICATE of OCCUPANCY CAN NOT 8E ISSUED PRIOR without approval, shall be covered or concealed without To FINAL ELECTRICAL & PLUMBING INSPECTIONS, approval.