HomeMy WebLinkAboutJR HIGH BUS LANE PLANS - 96-00035 - Madison School District - Storage AdditionMADISON SCHOOL DISTRICT 321
FIRST NORTH JUNIOR HIGH BUS LANE
NO.
DESCRIPTION
UNIT
ESTIMATED
QUANTITY
I
REMOVE CURB & GUTTER
LF
310
2
NEW CURB & GUTTER
LF
315
3
REMOVE SIDEWALK
SY
165
4
NEW SIDEWALK
SY
260
5
STREET LIGHTS
LS
1
6
REINSTALL EXISING SIGNS
EA
1
7
PLANT MIX
TON
115
8
%4" CRUSHED BASE
CY
145
9
PITRUN MATERIAL
CY
390
10
2" CONDUIT
LF
300
1997
INDEX, TO SHEETS
1 TITLE SHEET, INDEX
2 GENERAL NOTES AND LOCATION MAPS
3 PLAN AND PROFILE SHEET
4 SIDEWALK / MISCELLANEOUS DETAILS
5 TRAFFIC DEVICE FOUNDATIONS
6 ILLUMINATION POLE LOCATIONS
FA NO. 197101
FORSGREN
ASSOCIATES, INC.
TN. e
"Wgn
GENERAL NOTES:
I. THESE ARE GENERAL NOTES THAT APPLY TO THE PROJECT EXCEPT WHERE
MORE SPECIFIC INFORMATION IS INDICATED ON DRAWINGS OR IN
SPECIFICATIONS.
2. CONSTRUCTION SHALL CONFORM WITH LATEST EDITION OF THE UNIFORM
BUILDING CODE EXCEPT WHERE THE FOLLOWING NOTES OR OTHER
APPLICABLE CODES ARE MORE RESTRICTIVE.
3. ALL WORK IS TO BE DONE IN ACCORDANCE WITH CITY OF REXBURG
STANDARD SPECIFICATIONS.
A. ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR
TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE ENGINEER
SHALL BE NOTIFIED IMMEDIATELY SO THAT CLARIFICATION MAY BE MADE
PRIOR TO THE START OF THE WORK.
5. ELEVATIONS SHOWN ARE TO FINISHED SURFACE OR TOP BACK OF CURB
UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR SHALL RETAIN AND PROTECT OR REMOVE AND REPLACE
ALL LANDSCAPING, TREES, UTILITIES, EXISTING ASPHALT PAVING, AND ALL
OTHER MISCELLANEOUS ITEMS. ANY DAMAGE DONE BY THE CONTRACTOR
SHALL BE REPAIRED AT HIS EXPENSE.
7. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE
ARRANGEMENTS FOR WATER REOUIRED FOR COMPACTION AND ANY DUST
PREVENTION MEASURES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING SOURCES, WASTE
SITE(S), AND ADDITIONAL MATERIALS THAT MAY BE NECESSARY FOR
PROPERLY CONSTRUCTING THE PROJECT.
9. LOCATION OF CONTRACTION OR POUR JOINTS IN CONCRETE SHALL BE
PLACED SO AS TO CREATE SOUARE SECTIONS, OR AS CLOSE AS IS
REASONABLY POSSIBLE AND MUST BE APPROVED BY ENGINEER.
10 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY APPROPRIATE
UTILITY COMPANIES WHEN CONSTRUCTION MIGHT INTERFERE WITH NORMAL
OPERATION OF ANY UTILITIES. IT SHALL ALSO BE THE CONTRACTOR'S
RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY COMPANY FIELD -
LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY
CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT AREA. THE /
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF
EXISTING UTILITIES AND FOR RESTORING ANY UTILITES DAMAGED DUE TO
CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
11 ITEMS MARKED N. I. C. ARE NOT TO BE INCLUDED IN THIS CONTRACT.
SECTION CALL -OUT
SECTION NO. (TYP 2
SHEET ON WHICH SECTION IS SHOWN (TYP)-- 8
n SECTION
u
DETAIL CALL -OUT
DETAIL LETTER (TYPY--� A DETAIL NAME
SHEET ON WHICH DETAIL IS SHOWN (TYP3
n DETAIL NAME
." and th,,. l in A 11 e.
b 1M MJ.no I prop" w
kin/ Inc. M .IM not be
ah. at.. nuoriz.mn eJ
In / Inc.
OMWN —'., rn. CNECREO
DESIGNED
APPROVED
MADISON SCHOOL DISTRICT 321
REXBURG, IDAHO
LOCATION MAP
NO SCALE
FORSGREN
ASSOCIATES, INC.
VICINPTY MAP
NO SCALE
FIRST NORTH JUNIOR HIGH BUS LANE
GENERAL NOTES AND LOCATION MAPS
PRO EEC NO.
EP
97101
0 1
SHE
2
15 REXBURG
20
PROJECT
IDAHO FALLS LOCATION
SHELLEY
BLACKFOOT
15
POCATELLO N
AMERICAN I
3o FALLS
15
VICINPTY MAP
NO SCALE
FIRST NORTH JUNIOR HIGH BUS LANE
GENERAL NOTES AND LOCATION MAPS
PRO EEC NO.
EP
97101
0 1
SHE
2
is
TRI STATE TIRE NOTE: WIRING AND CONNECTION OF STREET
WLIGHTS TO BE PERFORMED BY OTHERS
_j
R/W R/W R/W
V)
14+00 SCALE: 1 = 40
1
N 67955.251
E 56818.623
R=25' (TYP.
A/w
\_�51. 847
E 56606. 138
-SAW CUT EXISTING
SIDEWALK
N 87941.468
E 56788.340
N 87930.103
E 56784.732
-RIW-
14+00 SCALE: 1 = 40
1
N 67955.251
E 56818.623
R=25' (TYP.
A/w
\_�51. 847
E 56606. 138
-SAW CUT EXISTING
SIDEWALK
N 87941.468
E 56788.340
N 87930.103
E 56784.732
ATHLETIC
FIELD
JUNIOR HIGH w
BUILDING
J
CONSTRUCT NEW 6'
SIDEWALK ( 150 SY 1 N
tt1
B 6' SIDEWALK
REMOVE E ING -
SIDEWALK (30 —�
JUNIOR HIGH SHOP
2 � f'� /� 31/2
R2" I /� 6"
12
R3"
B"
LDS SEMINARY
BUILDING
t 4
f/4„
6"
PARKING
LOT
No 1. CD
2' (TYP)
T
PARKING
LOT
A SIDEWALK TO JUNIOR HIGH
SCALE' I" = 40'
/
8'CONCRETE SIDEWALK
PROFILE GRADE =
TOP BACK OF CURB
4" - Y4" BASE
4" - CONCRETE
4" TYP
4" CONCRETE
4" - )/4" BASE
F -
z
z
I—
I' TO 2' AS NEEDED FOR
STRAIGHT, NEAT EDGE �
2.5' CURB 17' NEW PAVEMENT
& GUTTER
2.5' CURB AND GUTTER C REMOVE EXISTING
- CURB & GUTTER
ND I D Ca
B 61 SIDEWALK
NOTTO SCALE
26.5'± EXISTING PAVEMENT
CUT ASPHALT TO SMOOTH,
VERTICAL EDGE AND APPLY
TACK COAT PRIOR TO PAVING
31/2" - PLANT MIX EXISTING SURFACING
2'-G"
12" 12" THICKNESS VARIES 1 EROOLP
6" - Y4" CRUSHED BASE F
20" - GRANULAR SUBBASE z
2.51 CURB AND GUTTER
CTYPICAL ROADWAY SECTION 9rF"1 �oP
NOT TO SCALE � � OF PQ`
$ NOT TO SCALE
n2 DMWN 0]/9] BWM CHECKED 0]/9] BWM PROJECT NO.
S No. REVISIONS DATE 8wm MADISON SCHOOL DISTRICT 321 FORSGREN FIRST NORTH JUNIOR HIGH BUS LANE
mb 4ocummt o pm "m 1M1•mof N eetob w DESIGNED 0]/9] BNM
t aaag• concept ,a Inc. "monal shahproperty •I a x mo,K . �,,.a• REXBURG IDAHO
.,,,,• N, Iat.. i Inc. ASSOCIATES, INC. SIDEWALK / MISCELLANEOUS DETAILS 4
.,fee wi As at. LLnc aulM1onxalion oa APPROVED 0]/9] JWM
� — fon9�en Naoc)olea /Inc. pp1E
ONo Conduit Permitted Behind
Center Line Of Cabinet
,
2' Min. 3- Max.
Stub Above Foundation
,
Caulking Compound Required
3'-0--
1 1 1 1 I I 1 1' SI4' Conc.
III III
14 Pod
Pad For Drainage inage
� III IIII �
44-
III 11 I , �`•!�
r 1 III I I I II 1 .
i III 111 1
III IIII
Y Clearance (TYp.)
1 FfI IH 1
Conduit (See Plan For
Type and Quantity)
FRONT VIEW
1 1/2' Chamfer On Comers
10 -CT --OI
TO
M o 1 u, '"'1 27 Clearonee (Typ.)
See Schedule For Anchor Balt
O - Size and Quantity
6• See Schedule For Hoops
LOP And Vertical Bars
*01
Raised Concrete Pad Required
I When Foundation Is Installed
In An Unpaved Area
SECTION
B
CONTROLLER CABINET
l
N' T
-1 r'- . T
'Il I
F 4 1� .1
SECTION e
A
Sizes
Idem. Location
1' Rigid Steel Conch
& Plug For Future -
CONTROLLER FOUNDATION SCHEDULE
FOUNDATION
TYPE A
B
C D
E
HOOPS VERTICAL RODS CU. YDS. CONIC.
ANCHOR BOLT
N0. SIZE LIN. FT. NO. SIZE UN. FT. FOUNDATIO1 PAD
ONTY. SIZE
M 2'-11'
1'-8•
— —
1'-0'
3 #4 25'-6" B /4 24'-0- .6 1 2
2 1/27x12'x3'
P & R 4'-0•
2'-4�
3'-4 3/4-11-6 1/2'
—
3 BT/4 24'-0• 1.1 .2
4 5/6•x18-xb"
Y Slot Required
Anchor Bolts To Be Supplied
4 Ea. (See Anchor Bolt Schedule)
Two Gal, Washers and
Two Hex Nuts
- 2' Rigid Steel Conduit
As Required On Plans
PLAN VIEW
Anchor Boit As Per
MAIN
POLE FOUNDATION SCHEDULE
BOLT CIRCLE
Manufacturers Specs
LENGTH
17 1/2-
STRUCTUREOUNDATIO
TYPE
Crout After Pole Has
X
Y
-
Been Plumbed
CU. YDS.
CONCRETE
NO. SIZE JUN. FF.11,10.1 SIZE JUN. FT.
30' Light Pole
Pedestrian Signal Pole
A
2' -TP
2 1/7 Min. r Max.
4
/4 23'-0'
6
/4
28'-0'
.6
35' Light Pole
8
Rigid Steel1�
11 I II
I II •1'
N4 29'-47
Conduit
/6
40'-C•
1.3
40' & 50' Light Pole
C
3'-0'
8'-0•
5
#4 44'-2*
8
M6
1 •,
2.1
Traffic Signal Pole
See Schedule For Hoops
and Vertical Bars
—Bolt Circle (See Schedule)
157
-Sidewalk or Grade Line
`Plastic Sleeve Required
Through Sidewalk
Min.
3
-Rigid Conduit (See Plans
For Sze. Type, Number,
and Entry)
Y (TYP.) - -..1'.
I : I • Anchor Bolts
1 .
el-----> le
1 I'
a 1 I
1 I
� I 1
- F I _x �
SIDE VIEW
LIGHT POLE
FOUNDATION BASE DETAIL
SIGNAL POLE
MAIN
POLE FOUNDATION SCHEDULE
BOLT CIRCLE
SHAFT
LENGTH
17 1/2-
STRUCTUREOUNDATIO
TYPE
TYPE
X
Y
-
HOOPS VERTICAL RODS
CU. YDS.
CONCRETE
NO. SIZE JUN. FF.11,10.1 SIZE JUN. FT.
30' Light Pole
Pedestrian Signal Pole
A
2' -TP
5'-0•
4
/4 23'-0'
6
/4
28'-0'
.6
35' Light Pole
8
2'-G
7'-0•
4
N4 29'-47
6
/6
40'-C•
1.3
40' & 50' Light Pole
C
3'-0'
8'-0•
5
#4 44'-2*
8
M6
61'-4'
2.1
Traffic Signal Pole
0
3'-0-
9'-0•
5
/4 44'-2'
8
/6
69'-4'
2.4
Pedestrian Pushbutton Pole
E
1'-6'
2' -Er
2
/3 7'-6'
4
S48'-0
.2
See Schedule For Hoops
and Vertical Bars
—Bolt Circle (See Schedule)
157
-Sidewalk or Grade Line
`Plastic Sleeve Required
Through Sidewalk
Min.
3
-Rigid Conduit (See Plans
For Sze. Type, Number,
and Entry)
Y (TYP.) - -..1'.
I : I • Anchor Bolts
1 .
el-----> le
1 I'
a 1 I
1 I
� I 1
- F I _x �
SIDE VIEW
LIGHT POLE
FOUNDATION BASE DETAIL
SIGNAL POLE
MAIN
SIGNAL ARM
BOLT CIRCLE
SHAFT
LENGTH
17 1/2-
3 & 4
20'
22•
Class
25'
30'
35'
Single
Most
Class
40'
2
45'
Class
50'
3
55'
20'
25•
30'
Class
35
Double
4
40'
Most
45'
50'
55'
ANCHOR BOLTS
CLASS
SIZE
BOLT CIRCLE
1 & 2
1 3/4-X6TX6-
17 1/2-
3 & 4
1 3/4'X84CX6'
22•
NOTE:
1. The above design is based on Nass of
material 1 thm 4 per table 29-B in the
1991 edition of the Uniform Building Code.
Contact the City of Idaho Falls Engineering
Dept. if soil class of materials is item 5,
clay, sandy Nay, siky clay. and clayey silt
or if soil is organic clays and peat
STRUCTURAL DESIGN
FREDERICK R. SCHEERER
3717
syo rsarr,
d5~v HE
y F
aea
4 4'sdt�` r/yH
1' Rigid
& Plug
45 Bend
Londscaped Area
1' Rigid Steel Conduct
Y Rigid Steel Cor
As Required By PI
Y Rigid Steel Conduit
i
s
a
4 #4 Hoops
�6 /6 Vert
Abhor Bok S
And Location
Manufacturers
SpeciRcotio
Y Rigid Steel Conduit
PLAN VIEW
POLE BASE DETAIL
LANDSCAPE AREA
Of Sidewalk
II i. II
Instoll P.V.C. Sleve I NIL= 1 _
Through ConcreteeI I I NIL=
Sidewalk (Size Varies) I I ' I1
I II
Y Rigid Sleel
As Required By
POLE BASE DETAIL
SIDEWALK WITH STRUCTURE
45 E
Min.
Min.
'lug
Steel
Min.
PLAN VIEW
Landscaped Area �' I I " „Y Sand or n op of
'SII—li-l! j—II�' PolerFo Between Top Bottom Pok Foundation Top
of Sidewalk
\ Expansion Joint Material
V Rigid Steel CondultJ
'"4d
Steel CorMuft
J II II
As Raquinrrd By PWns
POLE BASE DETAIL
rel Conduit SIDEWALK WITH STRUCTURE
45 Bend
NOTE:
1. Contactor shall verify all utilities prior
to excavation.