HomeMy WebLinkAboutSPECIAL INSPECTION 7 - 21-00119 - Adams Elementary School - AdditionInspection Date:
08/16/2021
File Name:
21020DFR08162021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/17/2021
45987677-D5B3-4C84-8893-55259F6A2796 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
09:45 AM
Client:
Madison School District
Contractor:
Elite Steel
End Time:
04:15 PM
Inspection Type(s):
Epoxy Embeds/ Anchors
Masonry Grout Placement
Location(s):
Epoxy embedded anchors for steel awning over
north east gymnasium door and east side
gymnasium door. Grout placement under main
gymnasium steel columns.
Observations/ Remarks:
Arrived on site around 10:00 AM and met with Frank from Elite Steel. Around 10:30 AM, previously
drilled holes were re-cleaned according to specification and epoxy and anchors were installed according
to specification. Epoxy used was observed to not be expired, (see attached image). Left site for lunch
around 12:00 PM and return by 12:30 PM.
Around 1:00 PM installation of steel awning over east side gymnasium door started. Holes were
observed to be drilled to specified depth and cleaned, removing dust and debris, according to
specification. Epoxy was placed and anchors were installed according to specification.
In addition to epoxy embedded anchors, the placement of masonry grout under both north and south
main gymnasium columns was observed, (see attached images). Observations were reported to Dave
from Headwaters. Left site around 4:30 PM.
Time summary:
Travel time between lab and site: 30 min
Observation of drilling/cleaning holes and installation of epoxy and anchors 2 hrs
Lunch: 12 PM - 12:30 PM
Observation of drilling/cleaning holes and installation of epoxy and anchors 4 hrs
Note: DFR and time adjusted to 4:15 PM to account for time offsite for lunch.
Inspection Date:
08/16/2021
File Name:
21020DFR08162021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/17/2021
45987677-D5B3-4C84-8893-55259F6A2796 2
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
08/16/2021
File Name:
21020DFR08162021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/17/2021
45987677-D5B3-4C84-8893-55259F6A2796 3
Inspection Date:
08/16/2021
File Name:
21020DFR08162021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/17/2021
45987677-D5B3-4C84-8893-55259F6A2796 4
Inspection Date:
08/16/2021
File Name:
21020DFR08162021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/17/2021
45987677-D5B3-4C84-8893-55259F6A2796 5
Inspection Date:
08/16/2021
File Name:
21020DFR08162021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/17/2021
45987677-D5B3-4C84-8893-55259F6A2796 6