HomeMy WebLinkAboutSPECIAL INSPECTION 7 - 21-00119 - Adams Elementary School - AdditionInspection Date: 08/16/2021 File Name: 21020DFR08162021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/17/2021 45987677-D5B3-4C84-8893-55259F6A2796 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 09:45 AM Client: Madison School District Contractor: Elite Steel End Time: 04:15 PM Inspection Type(s): Epoxy Embeds/ Anchors Masonry Grout Placement Location(s): Epoxy embedded anchors for steel awning over north east gymnasium door and east side gymnasium door. Grout placement under main gymnasium steel columns. Observations/ Remarks: Arrived on site around 10:00 AM and met with Frank from Elite Steel. Around 10:30 AM, previously drilled holes were re-cleaned according to specification and epoxy and anchors were installed according to specification. Epoxy used was observed to not be expired, (see attached image). Left site for lunch around 12:00 PM and return by 12:30 PM. Around 1:00 PM installation of steel awning over east side gymnasium door started. Holes were observed to be drilled to specified depth and cleaned, removing dust and debris, according to specification. Epoxy was placed and anchors were installed according to specification. In addition to epoxy embedded anchors, the placement of masonry grout under both north and south main gymnasium columns was observed, (see attached images). Observations were reported to Dave from Headwaters. Left site around 4:30 PM. Time summary: Travel time between lab and site: 30 min Observation of drilling/cleaning holes and installation of epoxy and anchors 2 hrs Lunch: 12 PM - 12:30 PM Observation of drilling/cleaning holes and installation of epoxy and anchors 4 hrs Note: DFR and time adjusted to 4:15 PM to account for time offsite for lunch. Inspection Date: 08/16/2021 File Name: 21020DFR08162021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/17/2021 45987677-D5B3-4C84-8893-55259F6A2796 2 Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 08/16/2021 File Name: 21020DFR08162021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/17/2021 45987677-D5B3-4C84-8893-55259F6A2796 3 Inspection Date: 08/16/2021 File Name: 21020DFR08162021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/17/2021 45987677-D5B3-4C84-8893-55259F6A2796 4 Inspection Date: 08/16/2021 File Name: 21020DFR08162021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/17/2021 45987677-D5B3-4C84-8893-55259F6A2796 5 Inspection Date: 08/16/2021 File Name: 21020DFR08162021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/17/2021 45987677-D5B3-4C84-8893-55259F6A2796 6