HomeMy WebLinkAboutAPPLICATION & DOCS - 96-00028 - Bio Medics - RemodelDate Application
APPLICATION FOR BUILDING PERMIT
CITY OF REXBURGr IDAHO
OWNER
�Jr �
Name •fc�- %�fii,�/��
.tom
Street Address
Mailing d `
City, State "Y
4��-7 Z7
A;
6- Permit
CONTRACTOR
Name
Street Address
Mailing Address
City State
r
ZIP Telephone zi Telephone
Mobile T lhr *tr
Architect r Enging n Firm Ida, LjLol.
Ir .�
LEGAL DESCRIPTION (ATTACH COPY IF NECES4,AYARY
Lot Not. Block Subdivision
Job Addresq
�S-
r Information ( by applicant)
Residence Comm Educat.conal Gov't 1 lour
Fence Patio at Garage j' -n
Structure: New Remodel -..,Addition Repair Renewal
5
Total Floor Area -- - Number of StoriesHeight of Bui dr�n
. footagee. i- h.d Basement Fi'nished Basement
What will structure be used for (include name o busiLness
appl *cable)?
I 'is multiple i(apartments)� many units
Total Estimated Cost U 13 C Use C I aasi'ic s t 10
Are You In A Flcodlain?
Tax Code Build-ing Type
u
I
Building Permit Fees -.
Plumbing Permit FeesLit:
Water & Sewer Hookup fees
Signature of Applicant
Signature of Building
Issueu Uy
Flood Permit 10
Zone
-
.flan Check Fees
Digging Permit Fees
Other Fess I
-Ile .
- t �. -
cv
i
T .jmrft
R
W
11
�m
0
.4
9)
m
(n a room
:C m
0:11
Oo
>:r
tm
.U�a
0 U)
m
W- 013
z r
U)
m �n
w 0
0 Ta
C)
0 >
0
fn
0
4
M
Z 0
M
fa
>
0 m
P
m
00
(n a room
:C m
0:11
Oo
>:r
tm
.U�a
0 U)
m
W- 013
z r
U)
m �n
a
m
v
11
w 0
0 Ta
C)
0 >
0
fn
0
M
Z 0
M
fa
>
-n
P
00
m
z 0
e
rnm
0
igJpn MMEM
a
m
v
11
C)
fn
0
Z 0
M
fa
>
P
a
m
v
11
E
W
z
�l
9
CL
>
z
CL
0
MIO
3
0
c
T--
c
0 0
3
0
c
m
n
cr-
cr
U3
0
CL
D
3
CP
0
0
cr
CD
c
Ahl
dk&
e
E
W
z
�l
9
CL
>
z
CL
0
MIO
3
0
c
(D
c
3
OID
c
m
n
cr-
cr
U3
E
W
z
�l
9
CL
>
z
CL
0
MIO
3
(D
f�-
z
0
(n
MIO
3
(D
c
ca
T
JP6
ro
JT
N
to
:: Z
dVI
4
v
(n
MIO
(D
c
3
m
n
cr-
0
0
D
3
0
0
CD
dVI
4
v
EA
P..
CD
CL
0
--I
0
4
>
z
a.
:E
a
M91
m"
(D
0
'I
a
'A T
X
0
c
0
n
:3
OL
0
0
400
-mt%
�n
m
X
'0
c
i (n
A
I
a
MN
1z,
IND
Yf
EA
P..
CD
CL
0
--I
0
4
>
z
a.
a
CL
5
(D
to
m
0
z
=4
X
0
m
r�
0
-4-
F-.
0 4 1 a
4QFW A^ 16M -(0% A^ Vl, 4A 4A
0
z
m
x
I
(A
m
F
5
to
Ir
:3
0
0
400
-mt%
�n
m
X
'0
c
i (n
A
I
a
0 4 1 a
4QFW A^ 16M -(0% A^ Vl, 4A 4A
0
z
m
x
I
Excavation
Earthwork.
0
Concrete .
Masonry:
Roofing*
Insulation.
Drywall:
0
Floor Cover i
Plumbing
-Sil.'BC-011-TRACTOR LIST
A
Heating
Electrical:r~'
f
Roof Trusses:
Floor Ceiling
Cabinets
SPECIAL CONSTRUCTION
(MANUFACTURER OR SUPPLIER)
Joists:
Siding/Exterior Trim*
Other:
;.LF.j"I'Y 1.-0-4�M4%.iN-4r 'F '11iP16IRV l.L. A467.6.. • d
-Mv-, i
CITY OF REXBURG
Building Inspection Sequence
INSPECTIONS
Types of Inspections: For on-site construction, from time to time
the building f i i t upon notification from the permit holder or his
agent., shall make or causeto be made any necessary "inspections and shall
either approve that portion the construct ion as completed or shall
notify the permit holder or his agent wherein the sane fails to comply
with t i s code.
1. Layout,:. Lot corners staked, staking in place for building, prior t
excavation.
2. o tin Commonly made after poles or piers are set or trenches or
basement areas are excavated.. Forms and horizontal reinforcing in place,
vertical reinforcing cut and cn job siter tied i l ace .
. FoundatiLon Inspection: The foundation inspection shall include
excavations for thickened slabs intended for the support of bearing wallsf
partitions, structural supports, or equipment and special requirements for
wood foundationsdo All forms and reinforcing steel , etc., shall. be in place.
4. TrUBS Ins ti n : Desi. ns and instal I t ion information must be
submitted to the City beforedelivery of trusses, Inspection of trusses to
see they meet ship drawing requirements and that they are installed and
braced adequately s
5. Plumbi.n2r Mechanical a -Electrical: Rough 'inspection: Common l
made prior to covering r concealmentr before fixtures are t, and prior
to framing inspection.
6. Frame and Masonry Inspection: Commonly made after the roof,
masonryf
and after
approved.
7. Lath
all
framing, firestoppingr
dart stopping
and bracing are i -n place
the
plumbingr mechanical
and electrical
rough inspections are
and/or Wallboard Ina
and/orwallboard inter for i In
r before wallboard joints and
Final Plumbing and Heat in
i
tinio
Commonly made after a l i lathing
place, but before any plaster is applied,
fasteners are taped and finished.
Inspection:.All systems in place,
fixtures set, ready for occupancy*
9. Final Electrical: Fixtures and wall covers in place. Directory
-tn....completed in panel box.
1. `inal Ins t o: Commonly made after the i l d in+ i n� l t d and
ready for occupancy.
11Occupancy Permit: Issued when, on final inspection, building i a
ready to occupy.
12. Other Inspections: I n addition to the called inspections above the
building department a make or require any other inspect ions to ascertain
compliance ith this code and other laws enforced by the building department
INSPECTION CARD
The permit holder or his agent shall post the 'inspect ion record on the
jobsitein an accessible and conspicuous place to allow the building
official t ma the required entries . The record shall maintained by
the permit holder until the tinal inspection has been made and approved.
have Peal the above and will comply in my Pequests for inspections
by giving 24 HOUR NOTICE priop for inspectmade
Electrical* -, (8:00-9:00 a.m.) Ext. 325
Building Plumbing: 359-302.6 Ext. 326
County Plumbing. 656-7210
3 ir Yr. - I
I -M60.4-