Loading...
HomeMy WebLinkAboutOBSERVATION REPORT - 97-00026 - Broulims Grocery - New Building. Ir Ll PREscoTT MurR ARcF-rtTEcrs 245 South 20Q West Salt Lake City, Ptah 84101 80 1.52 3.9 1 i 1 a 801.521-9158f ax TRANSMITTAL DATE: 22 September 1997 PROJECT: Brouliml s - Rexburg, Idaho TCS= Rexburg Building Depar#menf TTI: Joe Laird If encJosures cire missing, please cafl. If checked below, please: Acknowfed receipt WE TRANSMIT: HEREWITH � � PICK LSP EPS IL � I FAX HAND DELIVER (X-) EGUL A FOR YOUR: USE DiSTRIBUTION TO PART0 INFORMATION REV�EW & COMMENT RECORD APPROVAL COPIES DATE '.r- r_%1 �Fr 4 REMARKS.- BY: Jack Robertson CONST PROJECT Broulim.'s Market, Rexburg, 1D 97031 DATE Tuesday, September 16, 1997 OBSERVER Joe L. gingham STATUS OF PROJECT: ARCHITECT .PORT GEN CONTRACTOR WEATHER lflgifid,6rs Prescott Muir Architects Bateman -Haft Windy and cool Roof framing (except at entry way) 'is eomRlete, and deck is approximately 80 percent complete. Canopy framing is stir not in place. � i rtvI5 ur NUTE FOR CONTRACT RECORD - WITH CORRECTIVE ACTION IF NECESSARY; 1met at the project site with Bill Anderson, the Project superintendent{ W iscusse the following items: 1'. Root deck welding (weld pattern and welds at perimeter). Weld pattern Was correct and tek screws were properly in place. At some locations the welds burred much of the deck, but generally the welding appeared to be adequate. Contractor needs to weld deck to masonry at entry way. 2. Tube steel blocking at diaphragm edges. Tube steel was visible and properly in place. 3• Connections at wade flange drags into masonry. These connections were visible at the front entry way and appeared to be adequate. At the rear of the building,the connection was only partly visible. Bif! explained that it was in place. 4. Tie pates joist to joist at grid Iines.. Tie plates could not be seen., but Bill assured me that they were in place. tND O� REPO T Joel. 8iftdham, Staff Engineer cc: Prescott Muir Architects Bateman -Half �O&LA-0,0 i3-zj",p Ow t Lool o G 061P F, CkZL. Ptrr Fvc>vs 19703Tjr.9���� �I�ULiY� i k'.;,- Ml-- �L - f-1 - - -- -T r - --� Brent L White, Project Engineer .ARW . . ...�N w ILI 16, me vecora or ine above noted site visit by ARWEngineers p rson-- el. The Observation Vis -t was madin Nne erl.ir�t arer�tc�rrisr�rernin . accordance with the building bar�ratir� ��# are nc�� intended to be comprehensive inspections. Ob ervaii n Visits are not an approval or warrantee of the contractors work nor is the Means, methods and sequencing of ARW Engineers 620 -24th Street, Ogden, Utah 84401 (801) 621-8130 FAX 621-6019