HomeMy WebLinkAboutOBSERVATION REPORT - 97-00026 - Broulims Grocery - New Building. Ir
Ll
PREscoTT MurR ARcF-rtTEcrs
245 South 20Q West
Salt Lake City, Ptah 84101
80 1.52 3.9 1 i 1 a 801.521-9158f ax
TRANSMITTAL
DATE: 22 September 1997
PROJECT: Brouliml s - Rexburg, Idaho
TCS= Rexburg Building Depar#menf
TTI: Joe Laird
If encJosures cire missing, please cafl. If checked below, please: Acknowfed receipt
WE TRANSMIT:
HEREWITH � � PICK LSP
EPS IL � I FAX
HAND DELIVER (X-) EGUL A
FOR YOUR:
USE DiSTRIBUTION TO PART0 INFORMATION
REV�EW & COMMENT RECORD APPROVAL
COPIES DATE '.r- r_%1 �Fr 4
REMARKS.-
BY: Jack Robertson
CONST
PROJECT Broulim.'s Market, Rexburg, 1D
97031
DATE Tuesday, September 16, 1997
OBSERVER Joe L. gingham
STATUS OF PROJECT:
ARCHITECT
.PORT
GEN CONTRACTOR
WEATHER
lflgifid,6rs
Prescott Muir Architects
Bateman -Haft
Windy and cool
Roof framing (except at entry way) 'is eomRlete, and deck is approximately 80 percent complete. Canopy framing
is stir not in place.
� i rtvI5 ur NUTE FOR CONTRACT RECORD - WITH CORRECTIVE ACTION IF NECESSARY;
1met at the project site with Bill Anderson,
the Project superintendent{ W iscusse the following items:
1'. Root deck welding (weld pattern and welds at perimeter). Weld pattern Was correct and tek screws were
properly in place. At some locations the welds burred much of the deck, but generally the welding
appeared to be adequate. Contractor needs to weld deck to masonry at entry way.
2. Tube steel blocking at diaphragm edges. Tube steel was visible and properly in place.
3• Connections at wade flange drags into masonry. These connections were visible at the front entry way
and appeared to be adequate. At the rear of the building,the connection was only partly visible. Bif!
explained that it was in place.
4. Tie pates joist to joist at grid Iines.. Tie plates could not be seen., but Bill assured me that they were in
place.
tND O� REPO T
Joel. 8iftdham, Staff Engineer
cc: Prescott Muir Architects
Bateman -Half
�O&LA-0,0 i3-zj",p Ow t Lool o G 061P F,
CkZL. Ptrr Fvc>vs
19703Tjr.9���� �I�ULiY�
i k'.;,- Ml-- �L - f-1 - -
-- -T r - --�
Brent L White, Project Engineer
.ARW . . ...�N w ILI 16, me vecora or ine above noted site visit by ARWEngineers p rson-- el. The Observation Vis -t was madin
Nne erl.ir�t arer�tc�rrisr�rernin . accordance with the
building bar�ratir� ��# are nc�� intended to be comprehensive inspections.
Ob ervaii n Visits are not an approval or warrantee of the contractors work nor is the
Means, methods and sequencing of
ARW Engineers 620 -24th Street, Ogden, Utah 84401 (801) 621-8130 FAX 621-6019