Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 9 - 21-00216 - Valley Agronomics - Maintenance ShopProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Valleywide Agronomics 20058 Valleywide Agronomics Gary Jones Construction 10/8/20 Sunny 11:30 AM 70 2:00 PM I arrived on site and began my observation of the steel reinforcement placed for the foundation slab for the tower on the southwest corner of the existing building. I observed that the steel was placed within conformance to the project guidelines. I then tested the concrete and observed the duration of the pour. I observed that the contractor consolidated the grout by mechanical vibration. I informed the representative from valleywide of my observations before leaving the site. Digitally signed by Jacob P Christensen Date: 2020.10.15 07:40:16 -06'00'8129697 J. Denton Page 2 of 2 Description: Description: Description: Description: Additional Comments: