HomeMy WebLinkAboutSPECIAL INSPECTION 7 - 21-00216 - Valley Agronomics - Maintenance ShopProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Valley Agronomics
20058
Valley Agronomics
Gary Jones Construction 10/02/2020
Clear
8:00 AM
57
2:30 PM
I arrived on site and began my observation of the Concrete Placement. Concrete Reinforcement Inspection
for the footings already completed on a previous day. I Took 2 samples and performed tests on them. The
1st being around 9:30 AM and the other around 12:00 PM. Due to there not being a spec for the concrete
the contractor accepted the results obtained from tests performed and continued to place the concrete.
I observed the contractor place and consolidate the concrete for footings for the duration of the Pour.
Digitally signed by Jacob P Christensen
Date: 2020.10.05 11:30:25 -06'00'8129697
Placement and consolidation. Grid F9
E Jenkins
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: