4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
Valley Ag
Time Start
08:30 AM
Client
Valley Ag
Contractor
Gary Jones
Time End
12:00 PM
Inspection Type(s)
Concrete Placement
Concrete Reinforcement
Location(s)
West building interior slab
Observations/ Remarks
I arrived on site at approximately 8:45 a.m. I observed that the steel reinforcement was in general
accordance to project documents. The truck arrived at approximately 9:15 a.m. and I tested the
concrete at 9:30 a.m. I informed the foreman of the test results.I observed that the steel
reinforcement was wet set and that a laser leveler was used. It was done in general conformance to
project documents. I observed the remainder of the pour.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
New Multi Photo
Inspection Date
03/02/2021
File Name
20058DFR03022021WDM
Inspector's Signature Inspector's Name
W. Moffat
Reviewer's Signature Reviewer's Name
S.Thompson
Reviewed Date
03/02/2021
5b433c08aac70bf4-1614708615990 2