Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 3 - 21-00216 - Valley Agronomics - Maintenance ShopInspection Date 02/19/2021 File Name 20058DFR02192021WDM Inspector's Signature Inspector's Name W. Moffat Reviewer's Signature Reviewer's Name S. Thompson Reviewed Date 02/19/2021 5b433c08aac70bf4-1613754475675 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Valley Ag Time Start 09:00 AM Client Valley Ag Contractor Gary Jones Time End 10:30 AM Inspection Type(s) Concrete Placement Concrete Reinforcement Location(s) West building foundation walls Observations/ Remarks When I arrive on site I observed that the steel reinforcement was in general conformance to project documents. The concrete truck arrived at approximately 9:15 AM. I tested the concrete and informed the supervisor of the results. I observed that a mechanical vibrator was used. I observed the duration of the pour. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 02/19/2021 File Name 20058DFR02192021WDM Inspector's Signature Inspector's Name W. Moffat Reviewer's Signature Reviewer's Name S. Thompson Reviewed Date 02/19/2021 5b433c08aac70bf4-1613754475675 2