HomeMy WebLinkAboutSPECIAL INSPECTION 3 - 21-00216 - Valley Agronomics - Maintenance ShopInspection Date
02/19/2021
File Name
20058DFR02192021WDM
Inspector's Signature Inspector's Name
W. Moffat
Reviewer's Signature Reviewer's Name
S. Thompson
Reviewed Date
02/19/2021
5b433c08aac70bf4-1613754475675 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name
Valley Ag
Time Start
09:00 AM
Client
Valley Ag
Contractor
Gary Jones
Time End
10:30 AM
Inspection Type(s)
Concrete Placement
Concrete Reinforcement
Location(s)
West building foundation walls
Observations/ Remarks
When I arrive on site I observed that the steel reinforcement was in general conformance to project
documents. The concrete truck arrived at approximately 9:15 AM. I tested the concrete and informed
the supervisor of the results. I observed that a mechanical vibrator was used. I observed the duration
of the pour.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
New Multi Photo
Inspection Date
02/19/2021
File Name
20058DFR02192021WDM
Inspector's Signature Inspector's Name
W. Moffat
Reviewer's Signature Reviewer's Name
S. Thompson
Reviewed Date
02/19/2021
5b433c08aac70bf4-1613754475675 2