HomeMy WebLinkAboutSPECIAL INSPECTION 11 - 21-00216 - Valley Agronomics - Maintenance ShopProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Valleywide Agronomics
20058
Valleywide Agronomics
Gary Jones Construction 10/14/2020
some clouds
8:30 AM
45
12:30 PM
I arrived on site and began my observation of the Concrete placement for the building walls for grid
lines16-6/A, 16/A-F, 16-12/F. Reinforcement Inspection had been done previously. I permorned 2 sets ACI
tests, and observed that the concrete was in general conformance to project documents. I observed the
contractor place the concrete in the wall forms in 2 lifts. The contractor used a pump truck to place the
concrete. I observed the contractor vibrate the concrete to consolidate. I observed for the duration of the
pour.
Digitally signed by Jacob P Christensen
Date: 2020.10.15 07:42:45 -06'00'8129697
formwork placementq consolidation
E Jenkins
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: