HomeMy WebLinkAboutSPECIAL INSPECTION 11 - 21-00216 - Valley Agronomics - Maintenance ShopProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Valleywide Agronomics 20058 Valleywide Agronomics Gary Jones Construction 10/14/2020 some clouds 8:30 AM 45 12:30 PM I arrived on site and began my observation of the Concrete placement for the building walls for grid lines16-6/A, 16/A-F, 16-12/F. Reinforcement Inspection had been done previously. I permorned 2 sets ACI tests, and observed that the concrete was in general conformance to project documents. I observed the contractor place the concrete in the wall forms in 2 lifts. The contractor used a pump truck to place the concrete. I observed the contractor vibrate the concrete to consolidate. I observed for the duration of the pour. Digitally signed by Jacob P Christensen Date: 2020.10.15 07:42:45 -06'00'8129697 formwork placementq consolidation E Jenkins Page 2 of 2 Description: Description: Description: Description: Additional Comments: