HomeMy WebLinkAboutSPECIAL INSPECTION 10 - 21-00216 - Valley Agronomics - Maintenance ShopProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Reviewed By:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com
Inspected By:
Valley Agronomics
20058
Valley Agronomics
Gary Jones 10/12/2020
Clear
9:00 AM
32
11:00 AM
I arrived on site and began my observations of the wall reinforcement. I observed that the contractor had
begun placing the vertical and horizontal reinforcement on the East and South walls. I observed that the
reinforcement was placed with the correct size and spacing, using 2" spacers for the correct tolerance from
the wall forms. I notified the contractor of my observations prior to leaving.
Digitally signed by Jacob P Christensen
Date: 2020.10.29 09:32:20 -06'00'8129697
J. Christensen
Page 2 of 2