Loading...
HomeMy WebLinkAboutSPECIAL INSPECTIONS 3 - Teton River Flats Community HousingProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Reviewed By:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: 4103 E 605 N Suite 1 Rigby, ID 83442 208.970.6237 www.connectengr.com Inspected By: Teton River Flats 20075 Headwaters Construction Thompson Excavation 1-14-2021 10:30 AM 2:30 PM Building:B1 Contractor was over excavating footings approximately 1' and replacing excavated material with approximately 1' of imported pit run and compacting. Digitally signed by Tyson Falls DN: cn=Tyson Falls, o=Connect Engineering, email=tfalls@connectengr.com, c=US Date: 2021.01.22 14:27:11 -07'00'2080711 B. Ball Inspection Date 02/23/2021 File Name 30075DFR02232021Ns Inspector's Signature Inspector's Name N. Steiner Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 02/23/2021 9402C6D8-DA10-4314-BD88-AB905FAC30A2 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 09:15 AM Client Headwater's Construction Contractor Thompson excavation Time End 11:30 AM Inspection Type(s) Concrete Placement Location(s) Breezeway between east buildings Observations/ Remarks I arrived on site 9:15 and began my inspection and observation. I looked at the forms to make sure they were at the correct height and made sure they were placed correctly. The pour then began. I tested the concrete and the concrete was up to spec. The contractor was in general conformance to project documents. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date 02/17/2021 File Name 20075DFR02172021DFA Inspector's Signature Inspector's Name D. Aust Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 02/17/2021 e875ea11521d0ef1-1613575015195 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 06:30 AM Client Headwater's Construction Contractor Alpha Concrete Time End 08:45 AM Inspection Type(s) Concrete Placement Concrete Reinforcement Cold Weather Concrete Location(s) Slab on grade of northeast building Observations/ Remarks I arrived on site at approximately 6:50 AM. I observed that the contractor had placed a blue moisture barrier, as well as steel reinforcement, in preparation for the concrete slab. I noticed that there were not any dobies, or risers, under the steel reinforcement. I informed the contractor that he would have to wet set them, which I observed being done throughout the duration of the pour. I tested the first truck, and remained for the duration of the pour. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 02/17/2021 File Name 20075DFR02172021DFA Inspector's Signature Inspector's Name D. Aust Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 02/17/2021 e875ea11521d0ef1-1613575015195 2 Inspection Date 02/17/2021 File Name 20075DFR02172021DFA Inspector's Signature Inspector's Name D. Aust Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 02/17/2021 e875ea11521d0ef1-1613575015195 3 Inspection Date 03/22/2021 File Name 20075DFR03222021BB Inspector's Signature Inspector's Name Ben E. Ball Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 03/22/2021 A184949A-8BB2-42AA-990C-0FED43BCA46E 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 12:00 PM Client Headwater's Construction Contractor Thompson Time End 03:30 PM Inspection Type(s) Earthwork Inspection Location(s) Interior of building A4 approximately 2’ below finish floor Observations/ Remarks Arrived on site approximately 12:30 pm. Nuke gauge was not working. Had to return to lab and get a second gauge. Picked up proctor samples for sanitary sewer backfill. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date 03/15/2021 File Name 20075DFR03152021JPC Inspector's Signature Inspector's Name Jacob Christensen Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 03/17/2021 6c77d085ef10af70-1615933191982 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 03:30 PM Client Headwater's Construction Contractor Thompson Excavation Time End 05:30 PM Inspection Type(s) Earthwork Inspection Location(s) Building B3 Observations/ Remarks I arrived on site as requested by Thor (Headwaters Construction) to observe the bottom of excavation or bottom of footings for building B2. I observed that the soil was in a moist condition and was plastic. I observed that if the contractor were to apply any compaction efforts to this soil that it would cause liquefaction and therefore be unsuitable to build on. I notified the contractor of my observations prior to leaving. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 03/24/2021 File Name 20075DFR03242021BB Inspector's Signature Inspector's Name Ben E. Ball Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 03/26/2021 DF9D4E65-3830-44F1-8660-6412DB237595 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 12:24 PM Client Headwater's Construction Contractor Thompson Time End 04:30 PM Inspection Type(s) Earthwork Inspection Water/ Sewer/ Storm Drain Location(s) Sanitary sewer service to buildings A1-4 Observations/ Remarks Contractor was backfilling sanitary sewer service trenches with native material in one foot lifts and compacting. Items observed are in general conformance with approved project documents and jurisdictional requirements. New Multi Photo Inspection Date 03/24/2021 File Name 20075DFR03242021BB Inspector's Signature Inspector's Name Ben E. Ball Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 03/26/2021 DF9D4E65-3830-44F1-8660-6412DB237595 2 Inspection Date 03/24/2021 File Name 20075DFR03242021BB Inspector's Signature Inspector's Name Ben E. Ball Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 03/26/2021 DF9D4E65-3830-44F1-8660-6412DB237595 3 Inspection Date 03/30/2021 File Name 20075DFR03302021NS Inspector's Signature Inspector's Name N. Steiner Reviewer's Signature Reviewer's Name W. Moffat Reviewed Date 03/30/2021 19B8E666-FEC9-4B71-BA02-AACF2C3201FC 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 10:30 AM Client Headwater's Construction Contractor Thompson excavation Time End 01:30 PM Inspection Type(s) Earthwork Inspection Location(s) Man hole south end of site in between the two sets of boukdings Observations/ Remarks I arrived on site at approximately 10:45 and began my inspection. I arrived and they were in the process of putting the man hole in. I then watched them compact the dirt till they met compaction. The contractor was in general conformance to project documents. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date 04/05/2021 File Name 20075DFR04052021NS Inspector's Signature Inspector's Name N. Steiner Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/05/2021 3E763374-EFE2-426E-8074-F8B76C51925E 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 12:50 PM Client Headwater's Construction Contractor Thompson excavation Time End 02:00 PM Inspection Type(s) Earthwork Inspection Location(s) Building B2 Observations/ Remarks I arrived on site at approximately 1:00PM and began my observation. I observed the contractor compact the 3/4 material until it met compaction requirements. I then tested and they passed. The contractor was in general conformance to project documents. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date 04/05/2021 File Name 20009UDFR04052021NS2 Inspector's Signature Inspector's Name N.Steiner Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 04/05/2021 B8D4427E-7F30-43D0-902E-19D176CCF32F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 02:00 PM Client Headwater's Construction Contractor SETHCO Time End 03:00 PM Inspection Type(s) Earthwork Inspection Location(s) 500 feet north of Larch road and 50 feet south of Larch road Observations/ Remarks I arrived on site at approximately 2:15pm and began my observation. The contractor had already compacted the pit run so I took my tests and they passed. The contractor was in general conformance to project documents. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 05/28/2021 File Name: 20075DFR05282021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/02/2021 B9BA0468-2A37-47EC-87FB-D18F1C37E894 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 09:45 AM Client: Headwater's Construction Contractor: Headwaters End Time: 03:00 PM Inspection Type(s): Earthwork Inspection Location(s): Building B4 foundation pad Observations/ Remarks: Arrived at 9:45am, they were still compacting the native soil before pit run was placed. We tested the soil and it passed quickly. We were told by Don to return around 12:00pm to test the first lift of pit run. Then at 1:30pm, we tested the 2nd lift of pit run. Both the hand compactor and the roller machine were used on the lifts. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date 05/28/2021 File Name 20075DFR05282021 Inspector's Signature Inspector's Name Leland Steiner Reviewer's Signature Reviewer's Name E. Vail Reviewed Date 06/01/2021 D46F23EB-82E1-4003-9403-0F00E7263A63 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name Teton River Flats Time Start 07:15 AM Client Headwater's Construction Contractor Alpha Concrete Construction Time End 10:45 AM Inspection Type(s) Concrete Placement Concrete Reinforcement Location(s) Foundation Walls Observations/ Remarks I arrived at the lab at 7:04 AM and began to load up my gear. I then left the lab at 7:17 and made my way to the job site. I arrived there at 7:31 AM and began my inspections. After looking at the rebar I began to set up my equipment. I then waited for the first truck to arrive, which happened at 7:55 AM. I then grabbed the ticket and some water and finished setting up my gear. I then grabbed my sample at 8:15 AM and began my testing. Everything passed without difficulty, and was within spec. After finishing my testing and cleaning up my gear, I stayed and observed the rest of the pour. I then left the job site at 10:12 AM after observing the duration of the pour. I then arrived back that the lab at 10:32 AM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/01/2021 File Name: 20075DFR06012021MAS Inspector's Signature:Inspector's Name: Mitch Singleton Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/02/2021 D477CB11-C021-467E-8917-C40D174927DF 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 01:00 PM Client: Headwater's Construction Contractor: Thompson’s Excavation End Time: 03:15 PM Inspection Type(s): Earthwork Inspection Location(s): Edge of inside of foundation on the 3rd building from the west end of plot. Observations/ Remarks: I arrived on site at approximately 1:30. I made contact with Leland to take over for him and find out the area to take densities on. The first lift was the edge on the inside of the foundation. I watched as they compacted the soil. When they were ready I took a shot of where they compacted and observed that the compaction was above 95% compaction. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/01/2021 File Name: 20075DFR06012021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/02/2021 84AD7034-F874-4531-A830-C14D3F90950B 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 04:00 PM Client: Headwater's Construction Contractor: Thompson Excavation End Time: 05:30 PM Inspection Type(s): Other Location(s): Unit B5 Observations/ Remarks: Density testing for unit B5, arrived on site around 4:30 PM and spoke with Don from Thompson excavation, density tests were taken at each of the four corners of unit B5 and passing density test results were reported to Thompson technician on site. Left site around 5:15 PM Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/02/2021 File Name: 20075DFR06022021AS Inspector's Signature:Inspector's Name: Alan Schiess Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/03/2021 88e4e71eb0d121c0-1622652313049 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 09:30 AM Client: Headwater's Construction Contractor: Thompson Excavation End Time: 03:00 PM Inspection Type(s): Earthwork Inspection Location(s): I tested two trenches using the proctor of 108.1. The trenches are oriented north to south from main sewer line to the four-plex’s. I also tested the main sewer trench. Observations/ Remarks: I informed Don about the results. I stayed and tested/watched as the contractor filled the trench in. The trench was filled in one foot lifts. I used the native silt proctor of 108.1. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/02/2021 File Name: 20075DFR06022021AS Inspector's Signature:Inspector's Name: Alan Schiess Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/03/2021 88e4e71eb0d121c0-1622652313049 2 Inspection Date: 06/03/2021 File Name: 20075D06032021YK Inspector's Signature:Inspector's Name: Yannick Kabwika Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/04/2021 345b909c5362d83b-1622751411666 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 10:45 AM Client: Headwater's Construction Contractor: Headwater's Construction End Time: 04:45 PM Inspection Type(s): Earthwork Inspection Location(s): Subgrade and subbase of building 6 Observations/ Remarks: At 11:20 am when I got on the site the compaction on the native soil (subgrade) was pretty low. I had contractor work on it again before getting it to pass. Later on I tested the pit run. I observed that the contractor used a roller compactor and water added the soil. I reported the results to contractor. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/03/2021 File Name: 20075D06032021YK Inspector's Signature:Inspector's Name: Yannick Kabwika Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/04/2021 345b909c5362d83b-1622751411666 2 Inspection Date: 06/07/2021 File Name: 20075DFR06072021ADS Inspector's Signature:Inspector's Name: Andrew Sweet Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/08/2021 4a2d02640bacf398-1623082086711 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:45 AM Client: Headwater's Construction Contractor: Thompson End Time: 10:30 AM Inspection Type(s): Earthwork Inspection Location(s): This duplex building from the West. Observations/ Remarks: I arrived on site at 9:15 a.m. I observed that they had already compacted the southeast and southwest corners of the 5th duplex building from the West. The compacted 3/4” base was very dry as it had been sitting over the weekend. My first test on the Southeast corner came up short at around 92 with only about 2% moisture. The numbers were similar on the southwest corner. I suggested that they add more water and compact it one more time; they did so with a plate compactor, doing passes running east to west and north to south. When I tested the southeast and southwest corners after that compaction run i got passing scores of about 96 with about 4% moisture. I observed that they compacted the other two corners in a similar manner, and they each passed. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/07/2021 File Name: 20075DFR06072021ADS Inspector's Signature:Inspector's Name: Andrew Sweet Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/08/2021 4a2d02640bacf398-1623082086711 2 Inspection Date: 06/07/2021 File Name: 20075DFR06072021DFA Inspector's Signature:Inspector's Name: D. Aust Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 e875ea11521d0ef1-1623108247101 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:30 PM Client: Headwater's Construction Contractor: Alpha Concrete End Time: 05:00 PM Inspection Type(s): Concrete Placement Concrete Reinforcement Location(s): Northeast building. Observations/ Remarks: I arrived when the concrete driver had approximately 5yds left of concrete. The contractor did not schedule testing before the pour, which caused a lapse in observation of the pour. I tested the concrete and found the results to be within tolerance. I observed the contractor wet setting the anchor bolts and leaving large gaps between the concrete and bolts. I informed the foreman that that practice was not acceptable, and that he needed to fill in the gaps to maintain structural integrity. I observed the contractor rectify the issue. I observed the contractor utilizing a mechanical vibrator to consolidate the concrete. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/07/2021 File Name: 20075DFR06072021DFA Inspector's Signature:Inspector's Name: D. Aust Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 e875ea11521d0ef1-1623108247101 2 Inspection Date: 06/07/2021 File Name: 20075DFR06072021DFA Inspector's Signature:Inspector's Name: D. Aust Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 e875ea11521d0ef1-1623108247101 3 Inspection Date: 06/08/2021 File Name: 20075DFR06082021AS Inspector's Signature:Inspector's Name: Alan Schiess Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 88e4e71eb0d121c0-1623166205884 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:15 AM Client: Headwater's Construction Contractor: Affordable Concrete End Time: 12:30 PM Inspection Type(s): Concrete Placement Concrete Reinforcement Location(s): The interior slab of building B4 was poured. Observations/ Remarks: I arrived at 8:30, and waited until 9:45 for concrete to arrive. Pictures show the rebar that was used. The concrete did have super plasticizer in it, making the slump of 7 acceptable. I reported the results to David. The first two trucks arrived relatively close together, but the third followed the second by about 45 minutes I did not observe any vibrating of the concrete to prevent a cold joint. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/08/2021 File Name: 20075DFR06082021AS Inspector's Signature:Inspector's Name: Alan Schiess Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 88e4e71eb0d121c0-1623166205884 2 Inspection Date: 06/08/2021 File Name: 20075DFR06082021AS Inspector's Signature:Inspector's Name: Alan Schiess Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 88e4e71eb0d121c0-1623166205884 3