Loading...
HomeMy WebLinkAboutSPECIAL INSPECTIONS 2 - Teton River Flats Community HousingInspection Date: 06/08/2021 File Name: 20075DFR06082021HR Inspector's Signature:Inspector's Name: Hunter Redd Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 B3994B43-FAD7-432F-9EAC-5899905A8FD7 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:30 AM Client: Headwater's Construction Contractor: Thompson Excavation and Asphalt End Time: 10:30 AM Inspection Type(s): Earthwork Inspection Location(s): Building B4 Below concrete slab Observations/ Remarks: Compaction was met easily. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/08/2021 File Name: 20075DFR06082021HR Inspector's Signature:Inspector's Name: Hunter Redd Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 B3994B43-FAD7-432F-9EAC-5899905A8FD7 2 Inspection Date: 06/08/2021 File Name: 20075DFR06082021EJB Inspector's Signature:Inspector's Name: Emma Brown Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/09/2021 6609D17C-373C-4F39-86E5-30E1D5797DB1 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:45 PM Client: Headwater's Construction Contractor: Thompson End Time: 04:30 PM Inspection Type(s): Other Location(s): Building B4 Observations/ Remarks: We arrived on site at around 3:00 pm. We talked to the contractor and he informed us where the density tests needed to take place. He said that half of the building was ready but that the other half had gotten too much water so they were drying it out. He compacted the half that wasn’t ready. We took density tests in all 4 corners of the building and all corners passed easily. We informed the contractor of the results and left. We arrived back at the lab at about 4:30 pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/09/2021 File Name: 20075DFR06092021AM Inspector's Signature:Inspector's Name: Alvaro Montes Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/10/2021 2BF4B01F-160E-469E-82FD-337D2678451A 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 12:30 PM Client: Headwater's Construction Contractor: Thompson End Time: 04:30 PM Inspection Type(s): Concrete Placement Earthwork Inspection Location(s): Teton River Flats. Observations/ Remarks: I arrived at the job site at around 12:50 pm, workers were ready for the densities tests, so I proceeded to take them and they all passed above specs. Then at 3:00 pm, a concrete truck arrived for the pour, I set up my equipment and took my sample. Finally, I performed all the tests successfully. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/10/2021 File Name: 20075DFR06102021AM Inspector's Signature:Inspector's Name: Alvaro Montes Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/10/2021 DA6E668A-B22C-4296-82D6-915194BFB29F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 05:45 AM Client: Headwater's Construction Contractor: Thompson End Time: 08:30 AM Inspection Type(s): Concrete Placement Location(s): Teton River Flats, building B2. Observations/ Remarks: I arrived at the job site at around 6:25 am, the first concrete truck was there, then I set up my equipment. When the second truck arrived, I took my sample and started the tests. Finally, I performed the tests successfully. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/10/2021 File Name: 20075DFR06102021LGS Inspector's Signature:Inspector's Name: Leland Steiner Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/10/2021 FA6B4396-BBB0-4C0A-82EB-5A1BF47D9E07 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:15 AM Client: Headwater's Construction Contractor: Thompson Excavation End Time: 10:00 AM Inspection Type(s): Other Location(s): Building 8 on north row Observations/ Remarks: I left the lab at 8:19 and headed to the job site. I arrived at 8:30 and found where densities were needed to be shot. I then got my gauge out and got it running with the correct input. I then shot densities on all four corners of the building within the foundation on the 3/4 base, and everything passed beautifully. After notifying the contractor I asked if there was anything else I could do for him. And then after hearing a no I proceeded to put my gear away. I then proceeded to observe that the whole pad had been completely compacted and then I left the job site. I arrived back at the lab at 9:54. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/11/2021 File Name: 20075DFR06112021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/11/2021 8CA41D9F-76E4-43C7-8B93-A674BA57AFBD 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:30 AM Client: Headwater's Construction Contractor: Headwaters End Time: 10:00 AM Inspection Type(s): Earthwork Inspection Location(s): Building B7, interior foundation pad Observations/ Remarks: Arrived at 9am, tested the pit run lift and they passed quickly. Don said I can return in 1-2 hours to test another lift on the same foundation. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/11/2021 File Name: 20075DFR06112021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/11/2021 8CA41D9F-76E4-43C7-8B93-A674BA57AFBD 2 Inspection Date: 06/11/2021 File Name: 20075DFR06112021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/11/2021 8F97DE0F-4BB8-4A99-85D3-04BA72714C64 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 10:30 AM Client: Headwater's Construction Contractor: Headwaters End Time: 12:00 PM Inspection Type(s): Earthwork Inspection Location(s): Building B7, interior foundation pad, top lift of pit run. Observations/ Remarks: Returned to the site once they finished the final lift of pit run. Everything passed quickly and they were done for the day on that foundation. Don said I can return first thing Monday morning to test next building footing pad. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/14/2021 File Name: 20075DFR06142021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/15/2021 997BF8F1-AE68-45F6-B4C1-A515166C1823 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:45 AM Client: Headwater's Construction Contractor: Headwaters End Time: 01:45 PM Inspection Type(s): Earthwork Inspection Location(s): Footing pads of buildings D1, D3 and D4 Observations/ Remarks: Arrived just after 9:00am, tested footing pad for building D1. Then waited almost two hours for them to finish D3 footing pad before testing that. I talked to Chris and he told me that the pit run was roughly a foot deep. Don showed up and I communicated with him at 12:30pm. He told me that they actually used 2 lifts of pit run on each footing pad, but that it’s okay for me to just test the top of the combined lifts, since the depth is roughly a foot or slightly more. Don had me run a couple quick tests on their first lift of building D4 to see where they’re at, which did not pass. He said that they had to remove some of the softer native soil and replace it with more pit run. Also that section is not up to grade so they will work on it this afternoon then I can return around 3:30pm to take further tests of D4 footing pad once they add water, then take tests after they add the next lift to make it up to grade. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/14/2021 File Name: 20075DFR06142021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/15/2021 997BF8F1-AE68-45F6-B4C1-A515166C1823 2 Inspection Date: 06/14/2021 File Name: 20075DFR06142021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/15/2021 475FA0C5-09D6-49DD-B9E7-45FB944A2000 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:45 PM Client: Headwater's Construction Contractor: Headwaters End Time: 04:15 PM Inspection Type(s): Earthwork Inspection Location(s): Building D4 footing pad Observations/ Remarks: Arrived at 3pm and they were just finishing up the D4 footing pad. Chris added water to the previous lift (per my recommendation) and rolled over it again after testing 93-94% compaction earlier this afternoon. Then they moved ahead with the rest of the pit run before I arrived, but he said it’s fine for me to just test the final product. I adjusted to test at 12 inches depth instead of 8 inches just to be sure, and everything still passed. Native soil grade was lower on this building than the adjacent buildings, so that is why they added extra pit run to this specific footing pad. I tested the D4 footing pad in the same manner as the D1 and D3 pads, except for the higher testing depth. Chris requested that I return to the site at 12:00pm tomorrow to run the same tests for building D2. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/14/2021 File Name: 20075DFR06142021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/15/2021 475FA0C5-09D6-49DD-B9E7-45FB944A2000 2 Inspection Date: 06/15/2021 File Name: 20075DFR06152021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/16/2021 7474B415-C24F-49E1-8272-458EB51ECFE5 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 11:45 AM Client: Headwater's Construction Contractor: Thompson End Time: 01:30 PM Inspection Type(s): Earthwork Inspection Location(s): Building D2 footing pad Observations/ Remarks: Arrived just after 12:00pm, and almost everyone was gone probably for lunch. Talked to Manny and the workers Nathan and Brock when they returned at 12:30pm. They said that their crew was not able to even start the footing pad for building D2 which I came to test densities for. Turns out that the grade for buildings D3 and D4 were 2” too high, so they need to take off extra material, and I will most likely have to test those pads again. The concrete crew was there so I talked with them and they told me the pour will be pushed back to 4:00pm. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/15/2021 File Name: 20075DFR06152021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/16/2021 7474B415-C24F-49E1-8272-458EB51ECFE5 2 Inspection Date: 06/15/2021 File Name: 20075DFR06152021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/16/2021 0AE26B61-0F94-4DF4-B44D-C3D1C8886538 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 03:15 PM Client: Headwater's Construction Contractor: Alpha Concrete End Time: 06:00 PM Inspection Type(s): Concrete Placement Location(s): Building D1 footing pad Observations/ Remarks: Arrived at 3:15pm to set up but the pour didn’t start until 4:00pm. After getting an air content of 3.8% on the first truck, one of the contractors wanted us to test from the second truck just to confirm the low air. Tested the second truck twice and both times got an air content of 2.5%. The contractor was concerned and had previous problems with Walter’s concrete being below specs for air, but said it will be fine with these footings. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/16/2021 File Name: 20075DFR06162021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/17/2021 7AB3320B-03B2-4C30-AC68-DB5E92C3120C 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 06:15 AM Client: Headwater's Construction Contractor: Alpha Concrete End Time: 08:30 AM Inspection Type(s): Concrete Placement Location(s): Buildings B5 and B6 interior foundation pad Observations/ Remarks: Arrived at 6:15 and the trucks showed up at the scheduled 6:30am time. The concrete truck driver told me firsthand that the contractor ordered concrete with low air content. Air content of 1.1% made sense for this case, and the measured slump of 6 inches matched what Walter’s tested for slump on the same concrete mix. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/16/2021 File Name: 20075DFR06162021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/17/2021 7AB3320B-03B2-4C30-AC68-DB5E92C3120C 2 Inspection Date: 06/17/2021 File Name: 20075DFR06172021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/21/2021 C899541A-BF8C-4DC8-93D7-AF44ECCABD19 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:30 PM Client: Headwater's Construction Contractor: Alpha Concrete End Time: 05:00 PM Inspection Type(s): Concrete Placement Location(s): Building D3 Footings Observations/ Remarks: Arrived just after 2:30 pm and turns out that the pour started at 2:00 pm instead of the 3:00 pm time I was told. They were almost done with the pour when I arrived, so I barely received the concrete sample in time. I reported the results to Cameron, one of the workers. He also said that the concrete pour for Friday at 6:30 am was canceled, and called his boss Scott to confirm the cancellation. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/17/2021 File Name: 20075DFR06172021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/21/2021 C899541A-BF8C-4DC8-93D7-AF44ECCABD19 2 Inspection Date: 06/23/2021 File Name: 20075DFR06232021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/24/2021 04A02E6E-BB51-4270-83D7-D4E1BA7B9763 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 09:15 AM Client: Headwater's Construction Contractor: Thompson End Time: 11:00 AM Inspection Type(s): Earthwork Inspection Location(s): Building D4 footing pad Observations/ Remarks: Arrived with Alvaro at 9:30. I talked to Don and there was some confusion between them and the previous guys that showed up this morning. We did a couple test shots on D2, which did not pass and clearly did not appear compacted. Then I talked to the general contractor, Thor, and he said that we actually needed to test building D4 footing pad, not D2. I reported the passing results of D4 to Don, but told him that D2 was not compacted. Don told me that D2 pad was finished and compacted and we don’t need to test it. However that one is not finished, and we should still test once they are done with D2. (First photo is D4 pad, 2nd photo is D2 pad). Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/23/2021 File Name: 20075DFR06232021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/24/2021 04A02E6E-BB51-4270-83D7-D4E1BA7B9763 2 Inspection Date: 06/24/2021 File Name: 20075C06242021WDM Inspector's Signature:Inspector's Name: W. Moffat Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/25/2021 5b433c08aac70bf4-1624570673900 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:00 PM Client: Headwater's Construction Contractor: Thompson Excavation End Time: 04:45 PM Inspection Type(s): Concrete Placement Concrete Reinforcement Location(s): Far NE building foundation walls Observations/ Remarks: I arrived on site at approximately 2:30 pm. The foundation walls were not ready for the concrete so the contractor used the wall concrete for the footings. The air was low and I informed the superintendent from the contractor and they decided to continue the pour. I observed that a mechanical vibrator was used and I observed the duration of the pour. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/24/2021 File Name: 20075C06242021WDM Inspector's Signature:Inspector's Name: W. Moffat Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/25/2021 5b433c08aac70bf4-1624570673900 2 Inspection Date: 06/25/2021 File Name: 20075DFR06252021CIP Inspector's Signature:Inspector's Name: C. Price Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 06/25/2021 22BF5566-6EB7-4B9C-B51D-FE3C01725291 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:00 AM Client: Headwater's Construction Contractor: Thompson Excavating End Time: 03:00 PM Inspection Type(s): Other Location(s): Teton River Flats Observations/ Remarks: I performed density tests on the trench and building pad D, as well as on the pit run of the northeastern building pad. I observed the backfilling of the trench, and tested each of the three lifts accordingly. I then returned to the lab and unloaded my equipment. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/28/2021 File Name: 20075DFR06282021COP Inspector's Signature:Inspector's Name: C. Price Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 A2DA3693-22FD-45D4-B792-65EAA4B218B1 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:00 PM Client: Headwater's Construction Contractor: Thompson Excavating End Time: 05:30 PM Inspection Type(s): Concrete Placement Location(s): Wall Observations/ Remarks: I arrived on site and set up my equipment. I tested from the first truck, specifications were met. I was informed a truck carrying different mix would arrive to do the footings, so I stayed on site until 5 pm when Aaron W. From Walters informed me it would not. I then returned to the lab. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Date: 06/28/2021 File Name: 20075DFR06282021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 F9469782-3B3F-408F-92D5-30950323DCE0 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 02:45 PM Client: Headwater's Construction Contractor: Thompson End Time: 04:30 PM Inspection Type(s): Earthwork Inspection Location(s): Buildings B7 and D1 foundation pads Observations/ Remarks: Arrived just after 3pm, talked to Don and one of his tractor operators. I tested the 1st lift of pit run on the building D1 foundation pad, then tested the 3/4” base on the top of B7 footing elevation of foundation pad. Informed Don, Manny and the tractor operator of the passing results. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/28/2021 File Name: 20075DFR06282021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 F9469782-3B3F-408F-92D5-30950323DCE0 2 Inspection Date: 06/29/2021 File Name: 20075DFR06292021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 FB2FF5D4-BC8F-4772-B4BD-1AE04495F68F 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:15 AM Client: Headwater's Construction Contractor: Thompson End Time: 09:45 AM Inspection Type(s): Earthwork Inspection Location(s): Building D1 foundation pad, 2nd lift of pit run Observations/ Remarks: Arrived just after 8:30 and the lift passed fairly quickly. Informed a couple of the tractor guys, Chris and Josh of the results. During my testing, a concrete pour was going on. I called Carson and he told me that another part of yesterday’s pour got postponed to this morning. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/29/2021 File Name: 20075DFR06292021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 FB2FF5D4-BC8F-4772-B4BD-1AE04495F68F 2 Inspection Date: 06/29/2021 File Name: 20075DFR06292021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 6E3476AA-A795-4336-8B02-0442C85321C2 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 11:45 AM Client: Headwater's Construction Contractor: Thompson End Time: 01:30 PM Inspection Type(s): Earthwork Inspection Location(s): Building D1 foundation pad, 3rd lift of pit run Observations/ Remarks: Arrived just after 12:00pm and they were in the middle of compacting the pit run. It passed quickly and I informed both Don and Chris. They said that building D2 backfill is not ready yet, so they want me back to test again tomorrow morning at 9:00am. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/29/2021 File Name: 20075DFR06292021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 06/29/2021 6E3476AA-A795-4336-8B02-0442C85321C2 2 Inspection Date: 06/30/2021 File Name: 20075DFR06302021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 07/01/2021 B6F56F87-0CA2-4F05-8BD4-F82DD4E69F70 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Teton River Flats Start Time: 08:45 AM Client: Headwater's Construction Contractor: Thompson End Time: 03:00 PM Inspection Type(s): Earthwork Inspection Location(s): Building D3 foundation pad 3 lifts, manhole trench 4 lifts, curb & gutter cutout (see plan photo) Observations/ Remarks: Arrived at 9:00am and they had the manhole trench and curb cutout ready for testing. They wanted me to stay for 4 lifts of the manhole trench native soil and all 3 lifts of the D3 foundation pad. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 06/30/2021 File Name: 20075DFR06302021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 07/01/2021 B6F56F87-0CA2-4F05-8BD4-F82DD4E69F70 2 Inspection Date: 06/30/2021 File Name: 20075DFR06302021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: W. Moffat Reviewed Date: 07/01/2021 B6F56F87-0CA2-4F05-8BD4-F82DD4E69F70 3