HomeMy WebLinkAboutAPPLICATION - 97-00035 - El-Gene TV & Appliance - AdditionAPPLICATION FOR BUILDING PERMIT
Date of Application
OWNER
Name 1 ri tj�+,
Site Address
Mailin�(sc'rv,Address ��
C ity/S tate/Z ip b
�, nnit 1 0.
CONTRACTOR
Name PC, I rn{Y
Street Address
Mailing; Address (.5clm-c-
loty/tate i ,
Telephone Telephone
Architect or Engineer Firmi4ck.
Ida-Lic. No.
9. -(X6, L4 Y-�J- 4 371�) y2e-1 q L-)
Mobile Phone 9 cio --
OfECT WFOR.-MATION
Lecra! Description (attach copy if necessary
Lot Na.
Block
Pian Name Subdivision
Resident Comm-.
ducational Gov't Religious Street Address 31
Fence Patio Carport Garage Awning .._
Description
Structure, Add.,
tNewl'Remode UAdditianlRepa�-lRene w ai
Sign 1� � Sign s1ze Kind
Total Floor Area No. of Stories
Height of BuiIdina �,� �C-;7 1i -C...
Sq. Feet Unfmished Basement r� Finished Basement NI)411 .-.`..��
What will structure be used for �includincr name of Bus' nessif applicable � � r(�c h-� {`t� +�;�
If use is mu�ti��� family tapamnents) hvw many units
J�
Total EstLmared Cost ��!�� �-- � you in a flood plain?PermftNo.,
Signatwe
Of Applicant
'� f �T!ifiJF�"Fil4i
mmp-i —E!i iAFM !iii
ii�'��lEi•��nY#ii.�����-��:a
UBC use Classification Buildm-cr Permit Fees
Tax Code ZoneP111mincy Per -mit Fees
i
Building Type
Diga
Signature of Buildo Inspector
Issued
Water & Sewer Fees
VJA
1
��_...
EX
Arm
+a, J
w
0
U
7
I
4c
m
cy
)>
0. m
Z IC
0
m
0
0
L)
0
Ch
0
>
q
m
C
R 3
M
m
n
c m
0
m
zMEW
m
m
cy
)>
0. m
Z IC
0
m
0
0
L)
0
0
>
m
R 3
M
m
41P
m
M CO
0
9
m
I
AV
SUBCONTRACTOR LIST
Excavation &
Earthwork: le�c�� c�
Can rete;
Masonry
loafing : �-� ��
Insulation!, S-�i�
Drywall:
Painting.
Floor Coverings
,rA-1
Plumbing: A) A
1p
flea -Ling .
Electrical
69 vn 61 n T Y"t eL ;-
11
SPECIAL CONSTRUCTION
(MANUFACTURER OR SUPPLIER)
Roof Trusses,,
�1,�-
Floor Ceiling
Cabinets ; {��' -
Sid ing/Exterior
-
Other a 0 f1)/,A--
Joists 0*
Tri"_m
M
U
in
IPM
CV
LU
CL
V)
v
�.: •+a - a r .■•.a .... r .—*n-* P_ e_r P==•r.� -,I.-rr.-�.�' y.� ,.
CITY OF REXBURG
Building Inspection Sequence
INSPECTIONS
Types of Inspections For -site construction, from time to tjm
the building official, upon notification from the permit holder or his
agent, shall make or cause to be made any necessary -inspections
either approve that portion of the construction as completed or shall
notify the permit holder or his agent wherein the same failsto comply
with this code.
1 a Lot corners staked, staking in in place for building, prior to
excavation.
2. Footin Commonlymade after poles or piers are set or trencheB r
basement areas are excavated •. Forms and horizontal reinforcing in place,
vertical reinforcing cut and on job site or tied place.
3. F d t" I .L o The foundation inspect ion shall include
excavations f thickened slabs intended for the support of bearing walls,
partitions, r r l supports, or equipmentand special requirements for
wood foundations. l l forms and reinforcing steel, etc., shall be a -n place..
Trus . Is io . .designs and installation information must be
submitted d the City before delivery of trusses, Inspection of trusses to
see they meet shop drawing requirements and that they are installed and
braced adequatelyS
. Plumbing, Mechanical and Electrical,o Rough inspection: Commonly
made prior to covering r concealment, before fixtures are set, and prior
to -iinspection.
6,. Frame and Masonry In s2ect ion : Commonly made after the roof,
masonry,, all framing, firest-oppingr draftstopplLng and bracing are in place
and after the plumbing, mechanical and electrical rough inspectionB are
approved,
Lath and/or Wallboard Ins ion * Commonly made after all lathing
and/or wallboard interior is in place, but before any plaster is applied,
or before wallboard Joints and fasteners are taped and finished.
Final Plumbing and Heating Inspection., All systems in place,
fixtures s t, ready for occupancyd
. Final Electrical: Fixtures and wall covers in place. Directory
completed in panel box v
10. Final Inspection: Commonly made after the .. i building completed and
ready for occupancy.
11 . occuj2ancy Permit: Issued when, on final inspection, building i
readyo occupy.
.12. Other Inspections: In addition to the called inspections above the
building department may make or require any other inspections to ascertain
compliance with this code and other laws enforced by the building department,
The permit
]obsite in
official. to
the permit
'x
INSPECTION CARD
holder or his agent shall post the
an accessibleand conspicuous place
make the re quired entries. The r
holder until the ii inspection
inepectivn record on the
to allow the buildzng
cord shall be maintained by
as been made and approved.
* I have read the above and will comply in my requests for inspections
by giving 24 HOUR NOTICE prior for inspection to be made.
Electrical: 359-3025 (8:00-9:00
Building & Plumbing: 359-3026 vim��,�-
County Plumbing; 656-72I0 /% t�►
Price &Betty Davenport Property
ElGene TV&Appliance
31 West Main Street
Rexburg, Idaho
4
air
New Building
r
qo
121X f 1 6f)
at
38.45'
Main Building
Alley
491
313,5'
19.5'
SUP- Z - S-07
9/2/97
5203 South i ]th East
Idaho Falls, Idaho 83,404
Tel &'!.
fax 208-5228223
I:1N4
John Paige
Palmer Bu'jding Company
17 West 15Q0 NQith
Rexburg, TD 83440
f x 3567356
RE: SNOW LOAD ON TBE ]ELGEN-6 BUILDING SIDEWALKS
Dear Mr. Paige:
This letter's writ��n ttr address t�� iss�.te of all of the roof snow ��ad, whick� � take L. .35
lbs. per square foot, potentially sUding off the roofinto the 2-1!Z foot space ofvur
huilditi,g and the ncighbors 6t�ildit�g. Z'heo�'eziC�iIy, if all 35 lbs. of s�flw was on topand 1 -(alb slid �ff al OnCe, it would stack up some 1225 lbs. per runrdng foot of building against
the building wa11, In that the building is 15 feet high and the area contriboing to it is 16
feet, intuitively thin the show load should be I GI1Sihs of 35 or 37.33 lbs./ft. against the,
side of the building. However, "if the snow is Partlatty melEed you could experience Eiquo
hydraulic Forces. Therefore,, I recommend the fottowing. Size the girt spacing for the
metal skin at 37.33 lbs. per square foot side load on the building. Then, whatever girt
spacing that yields, which I believe wi11 be on the level of four feet., for the bottom }din, c:trt
that in half In other words, the first girt would be two feet Off'the foundation, the sec,tmd
girt would be four fcet, the third dirt world be sight feet, and so on,
Very truly yours,
le
Ted S. Sorenson, P.E.
Cons4iting Engineer
j-
pagl� r