Loading...
HomeMy WebLinkAboutREVIEWS - 97-00030 - JRW- Health & Welfare Bldg.NILE L. B€IYLE hAAYaR ROSE BA LE CLERK RICHARD HHE TREASURER & FINANCIAL OFFICER August I , 1997 Nor. John Watson JRW & Associates 49 Professional Plaza Rexburg, Idaho 83:440 -STATE OF IDAHO RE: HEALTH & WELFARE BUELDING @ 333 WALKER DRIVE Dear John, Our comments an the preliminary plans available for review are as follows, P.O. gax 280 12 NQRTH CENTER STREET REXBURG, IDAHO 83440 PHONE �208) 359-3020 FAX {2q8} 359-3022 A Flood Elevation Certificate is required for the property as it is in the Teton River Flood Plain. The Base Flood Elevation for the site 'is 4567.5 (based an National Geodetic Vertical Datum of 1929). This is a critical Pi eGe of information. floor level is above the BFE as soon as possible. We need to know that the building 2. — It maybe desirable to move the two handicapped harking stalls one or two stall widths to the east so that the shaped section of sidewalk is off to one side of the main doors, thereby leaving a larges level area in front of the doors for the person in a wheel chair trying to open the front door. 3. —�- � had thought that the building was going to be moved a little farther south so that the future south right of way dine of the 13arney Dairy Road mould be 42 ft. south of the north sides of Lots 2 & 3 . It looked like we needed to get 12 ft. from the Phaco gallery and 48 ft. from the Youth Services (old Amdahl Building) property to make a best fit th-rough the area. Is getting 10 to 12 more feel of right of way on the north side of this building going to be a problem for you? 4. — It would be desirable 'if the doors to Conference Room I I I were located an opposite ends of the zoom rather than being bath together an the same end. 5 .—'ULre need to talk about the needed water and sanitary sewer extensions in 'talker Dr. as well as the extension of Walker Dr. itself. Send me over an updated version of the plans when you get thein more complete. JVJGpll h. Ld11 U� Y.r, CITY ENGINEER & BUI]LDING OFFICIAL PHILIP E_ BATT ou em r DATE: TO: FROM: State of /rialto DIVISION OF BUILDING SAFETY KALDING BUREAU October 17., 19 9 7 SRW & Associates John Dinucci Building Plans Examiner New office Building, Rexburg, TRANSMITTAL (2D8) 334-3896 ID PA #RQ -176 Thelanpre�riew for this project has are returning to you our findings have any questions regarding the please feel free to cvntact john 321 (Bu ilding) , Alien Hubble at 277 N. 6th, Suite 10 I.O. Box 83720 Boise, ID 83720-0060 FAX (208) 334-2683 been carnpleted and we dated e findings or other 0 I f you issues llinucci at X34-3895 334-2183 kaiecUrlcatj, ana tsob xawlings 334-344.2 Ext. Ext . C : Duane Johns. Department of Health and Welfare Blair Manwaring, Rexburg Building Department Sc"N'1179 In Th c Inlertv Of- A i h flc 343 333 Ext. (Plumbing). rC,UILDING BUREAU PLAN REVI'EW FINDING,",d! F1 DIVISION OF BUILDING SAFETY 277 NORTH 6TH STREET P4OeBOX 83720 BOISE, IDAHO 83720-0060 PH 12O8/334,w-3896 FAX 2683 To 4.p4 iRW & Assocates PA NO: DPW I RQ -176 DATE: 10-15-97 PAGE 1 OF 3 From.a John Dinucci, Plans Examiner, Building Bureau Project and Location: H & W -- New Office Building in Rexb�zr� Project Owner: JRW & Associates Findings: 1997 UBC, Vol. I, 1997 UMC & other adopted codes as noted 1. Overflow drains having the same size as the roof drains shall be installed with the inlet flow line located 211 above the low point of the. roof or overflow scuppers raving three times the size of the roof drains may be installed in adjacent parapet walls with the inlet flaw line .located 21' above the law point of the adjacent roof and having a minimum opening height of 4110 Overflow drains shall be connected to drain lines independent from the roof drain lines per Sec. 1506.3 UBCe 2. Provide structural calculations wet -stamped and signed by an Idaho licensed architect or engineer. Potential unbalanced accumulation of snow at valleys shall be considered per Sec. 1605v4 i 3.4 Total area of all openings other than doors in any ovrtion of interior corridor shall not exceed 25a of the area of the corridor wail of the roam which it is separating from the corridor per Sec. 1005.8.2 UBC, It appears this percentage is exceeded on plans. 4. Glazing within 24" arc of either edge of doors in the closed position shall be safety glazing (tempered) complying with Sec. 2406 vBc, 5,w Fmanufacturers specifications for skylights - must be tested for 4Q# sq, ft, live load for snow. Sloped glazing shall comply with pec. 2409 UBC. 6. Provide 1 -hour fire resistive exit corridor details that comply with Sec. 1}04.3.4 UBC, (See UBC Handbook, Figure 1005-- 6. for complying designs, 1994 Edition . � Page 2 of 3 7. Suspended T -w -Bar ceiling installation shall comply with UBC Standard 25-2, 199? Edition. Provide complying details and/or notes per Sec. 2502 USC. Be Corridors shall not be used to convey air to or from rooms when the corridor is required to be of fire resistive construction by Sec. 10x4.3.4 UBC per Sec. 601.1.1 UMCO 9. Ducts which penetrate firms resistive corridor walls that have openings into the corridor shall be equipped with combination smoke/fire dampers per Sec. 713-.10 & 713.11 UBC. 100 Supply a&M "o mecha111cai room per Ch. 7 b'wMCf 1997 Edition and manufacturer's spec i f icat ions . Denote on plans (If fuel burning appliances are installed). 11. Provide mechanical equipment schedules for mechanical room and/or use of room. Other cede provisions may apply depending on use of roam. 1Z. The minimum riser dor stairs is 4", the maximum riser height is 7", the minimum tread run. is 1111 per Sec. 1Q43.3,3.3 UBC. Denote on plans. 13. Panic hardware shall be installed at all exterior exit doors per See. 1003.3-.1.9 UBC., except for the main entrance which may be key locking hardware so long as the requirements of Sec. 1003.3.1.8 UBC, Exception #1 are complied with. 14. All doors shall have hardware of a type that is easy to grasp with one hand and does not require dight grasping, dight pinching, or twisting of the wrist to operate per CABC3/ANSI A117. 1, Sec, 4. 1, 9 (1992 Edition) . 15. Provide restroom accessibility and drinking fountain details 4na�. comp' win CABO/ANSI A117.1 (1992 Edll..ion) (With dimensions) . 16. Provide, international .symbol of accessibility signage at restrooms and accessible parking stabs per Sec. 1103.2.4.1, and directional signage at inaccessible building entrances indicating the saute to the nearest accessible dement per Sec. 1103.2.,4,.2 UBC. 17. Provide underfloor ventilation per Sec. 23D5.7 UBC. (1 sq, ft,, 150 sq. ft, of area). 18 . Provide documentation/ information about "Hypalan"' rowing and manufacturer's listing and installation requi& instructions . Page 3 of 3 19.. Install illuminated exit signage at main ��its per Sec. 1003.2.8.2 UBC and at intersection of corridors and waiting areas to clearly indicate the direction of ("'»rrQnt supply to one of the the premises wiring provided by battery accordance with the lamps for exit systemf power or an an --site Electrical Cod signs shall be provided by to the other lamp shah be generator set installed in e. 20... Wheelchair ramps shall comply with CABS/ANSI A117.1 Seg. 4.8, (1992 Edition) . 2i. Provide a minimum underf? goer a�^ess oppna nrT of 18+' x 2 4 " pell- Sec. 2306.3 USC, 22. Provide draft stops at roof /ceiling concealed area above T -Bar ceiling per Sec, 708.3.1.2.2 UBC. Draft stops shall not exceed 60F horizontal spacing, nor 3000 sq. Vit, of area between draft stops. Draft stop construction shall comply with 708,,3,1.3 UBC,s 23. Make provisions for minimum ventilation of rafter spaces enclosed by 6 mil visqueen per Sec, 1505.3 UBC. 24. Access to rooftop equipment shall be provided per Sec. 3p7 UMC. All of the above bmf ore approval items Must be adequately addressed for this project can be granted. If you have any questions please call me at (208) by resubmittal -9 concerning the above listed requirements, 334-389G Ext. 321. Thank you. G: Duane Johns, Department of Health and Welfare Blair Manwaring, Rexburg Building Department EF -0 1 11/18/96R P.A.: D.P.W.: AP PL I CANT/ARC H I TE UO' T.: PROJECT -./J/ STATE OF IDAHO DIVISION OF BUILDING SAFETY" ELECTRICAL BUREAU 277 NORTH 6TH, SUITE 107 P.O. BOX 83720 BOISE, ID 83720-0028 (208) 334-2183 LANSIELECTRICAL) EXAMIN IPM ON F COPIES TO: SCHOOL DIST., #: IN i. 0 NOTE: ll work will be subject to compliancewith the current National Electrical Codi Idaho Code, title 54 chapter 10, and the codes enumer2ted-in Idaho Codi this 39 chapter 41 (Contact 10C21fire jurisdiction for Uniform FireCode Review/Approval). review of the subject project finds the plans and specifications in essential accord with the above referenced codes except as follows: THE FOLLOWING ACTION IS DETERMINED AND BASED, UPON REVIEW OF SUBMITTED PLANS: PLANS ON HOLD - Additional information is required. PLANS REJECTED - New plans or permits. with proper corrections as noted to be resubmitted. PLANS APPROVED - Subject to compliance with correction as noted. PLANS APPROVED - No correction noted. wip CHECKED BY AMI DIN LEA FINDINGS 0 ATTACHED DATE / b "/S l PF -38 STATE OF IDAHO 6/24/94R DEPARTMENT OF LAB -OR AND INDUSTRIAL SERVICES PLUMBING DIVISION 277 NORTH 6TH, SUITE 100 P.O. BOX 83720 BOISE, ID 83720-0068 (208) 3343442 PLANS (PLUMBING) EXAMINATION FINDS D.P.W.: APPLICANT]ARCHITECT, J t�i � A � . pmffifi� COPIES TO: SCHOOL DIST. #-Mo dr PROJECT: iJ e W CL kA NATE; �i work will be subject to compliance with the current Uniform Plumbing Cede, Idaho Cade title 54 chapter 10, and the codes enumerated in Idaho Code, tiffs 39 chapter 41 (Contact local fire jurisdiction for Uniform Fire Code Review/Approval). A review of the subject project finds the plans and specifications in essential accord with the above referenced codes except as follows. THE. FOLLOWING ACTION IS DETERMINED AND BASED UPON REVIEW OF SUBMITTED PLANS: X PLANS ON HOLD - Additional information is required. PLANS REJECTED - New plans or permits with proper corrections as Hated to be resubmitted. PLANS APPROVED - Subject to compliance with correction as noted. PLANS APPROVED - No correction noted. Fi�c� 15 ar�'1 e�7-�lc� FINDINGS ADDITIONAL FINDINGS, PLEASE SEE ATTACHED CHECKED BY 1�,� DATE 110-:20- f - b1JVM 11 Ej 77JMY EDWARDS Deputy Firs Narsha! FkUM UEPL! VY F- IRS MARSHAL 208 525 7066 DEPARTMENTState Of 061ho OF INSURANCE State Fire Harshal - Ristritrt 3Ii PO Box 2699 14Mo Fat1s.Id 93403 1994 UMfonn Firs Code. Pian Review JAS Director DON MCCBY Project Number; P.A. #RQ. 176 Pian Date' JaIy 97 review Date: Oct. 20, 1997 Building Narne: JRW Health andWelfare"V BuDding Addrema, 333 Walker Drive Rexburg, Id. Stories: One Type of Construction: Type, V -N Occupancy Classi5c�on: "B" Existing Floor Area: New Construction New Construction Floor Area.- 8,640 squ2re feet 1. Required Fixe Flow (AppendiX Iii -A): 2,500 GPM for 2 hours IF Comments A 2. Water Supply Requited (Article 9, section 903): Yes Fire Hydrant Location.B-47300 1131ock Waitcer Dr. ; J3-37, 400 N, 3"' E. fire Hydrant Flows., 4,045 GPM at 20 psi. sue lviow'vest Location: Hydrant B-47 and Hydrant 5-37 Fire Flow Supplied By ; Rexburg Fire n eet. Other Approved Water Sou.rce, None noted Water Supply Acceptable,- Yes Fire Hydrant Location Acceptable: Yes Equal Opportunity Employer - 10-20-1997 d _ SMPM FROM DEPUTY F IRE MARSHAL 208 525 7066 3, Fire Apparatus Access Roads required (Article 9 Section 902)- Yes Comments: Walker Drive is an exiting city street and is acceptable to the Rexburg Fire Dept- 4, Access Roads and Water Sunply, Including Fire Hy drantS Are Required To Be Installed and Made Serviceable Prior To and during The Time Of Constru on (Article 4 section 94].3), Yes 5. Installation Of Portable Fire, Extinguishers (Article 10 section 1002)Required- Yes U -cation AcwpWie.- Location of extinguishers is not shown on plan, Type Provided Acceptable: 'Yes ; Specs call for UL listedextin 6d B. -C rating, guishers with 4A, Comments: S�ac�n� end l�cat�€�n �ffir� ea��,guishers shau be as regWred by Is ��UniamFire Code Standard 10-4 ��w ext���uIr ons on plan- 6. Automatic Fire Extinguishing Systems-( Article 10 sextion 1003)RequiredIF-, No 7. Standpipes Required:: (Afticle 10 section 1004): No S. Ventilating Hood and Duct Fire Extinguishing Systems Required: (Article 10;W,fi on 1006.2): No Comments: Nfmm�c�. c�,o� ora�ons are noted in the laps. 9, Fire Alarna Systems Required: (Article 10 section 1007): No TYPO Of Syst= gig provided: Manual and Automatic Components of System, Shown: Combination SmOke and Heat Detectors 19 Manual Pull Stations4Sounditag Devices....j. L -'Visa D e,vqces 9 rice Alarm SystemdAzMptable: Yes Comments: Even though alarm system is not required ane is to be installed. System must comply with Unifoctr� fire Code section 1007 and NFPA 72. Manual pull boxes and combination smoke and heat detectors appear to meet the location and spacigg requirements of N�'PA 72. P. 3 I I_dCX_ I UI.-itj / ri bb Audio[Vimal devlc&s appear to mit t ie location and spadng requirements of NFPA 72. However I would like to suggest the dio/visual d�v� i� waituag area 122 be moved to the north neu the intersection withmw�t�r 14�. Approval of the fire alarm system is preliminary only. Before final approval is given the equipment installer must provide all infonmtjon required bv Uniform Fire Code seedon 100 1.3 to this office for review and approval. C Section 100 1 .3 Plans for Fire Alann Systems." Complete plans and specifications for fire alp Mems shall W submitted for revvieVv and approval prior to sy-stem instajjation. Plans and spificatfans shall include, but not be limhed to, a floor, plan; location of all alarm -initiating and alarrawsignahg., devij-&!a6, arm contro d troubjewrSignaling equipment, annunciation; power connection, battery Wculations- conductor type and size; voltage drop calrWations, and manufacturer, model numbers and fisting information for aU equipment, devices and materials." Plzvxu,..)e inClu�� the I ength of each circuit loop including drops with the voltage drop calculav*ons, Please prow'de alami plans on their -own sheet and 1I$ or 'A scale is preferredIr I4. (cher COrrections That Aye Required By Special Occupancy Or Condition: None Plans as S, ubrritted Are Acceptable: Y(*'0pravded any correction or additional subwitWs required under comments are provided as requested, Plans Checked Byj ECwAr.6 DenubirRa F�re Date: 10!20!97 PIOM furnish commentS buk to the plan reviewer in the f0U�wing mannier Written COMMents: X New Plans: 3 P_ 1