Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 97-00016 - Ricks College - Carpentry & Lab Work StorageCITY OF REXBURG I _Building Inspection Sequence s r INSPECTIQNS Types of Inspections.* For on-site ionfromion, itti y cia.1, upon not f icat on f rom the permit holder or his agent, shall make or dose to be made any necessary inspe s and shall either approve that portion of the construction as completed or shall U notify the permit holder or hi's agent wherein the same fails to comply CM 4 C: with thiLs code. is Layout: Lot .corners staked, .ung in placefor buildi_ngr pr -.Lor t excavationt rb" CL 2a Footing: Commonly made after poles or p iers are set or trenches or 0 basement areas are excavated. Forms and horizontal reinforcing in place, vertical reinforcing cut and on 3ob site or tied 'in place. ' 3s ' oundation Inspection: The foundation 'inspection . shall include#r. S%w excavations for thickened�slabs intended for the support CL of 4% partaLtionsr structural supports, or equipment and special requirements . for 4-1 wood rpt ions . All forms and rein F ing steel, etc., shall be in place. 0 4o Truss I r nepection: Designs and installation information must be QJ submitted to the City before delivery of trusses. Inspection of trusses to see they meet shop drawing requirements and that they are installed and braced adequately, 4. 59 Plumbi,_ngr Mechanical and Electricale Baugh. ins ionCommonly made prior to covering or concealment, b,efore fixtures are set., and prior to framing inspecticn.. 0i . Frame and a sone [�.�—,�.,�. Commonly made after thef, masonry, l�. r� int { uppingr stopping and brae are i dace and after the Plumbinge, mechanical and electrical rough inapections are C> approved. #--t 7. Lath oWallboard t io n b Commonly made after all lathing LLJ and/or wallboard CLIoisplace, but fore any plaster isapplied, wallboardor- before ' int a and fasteners are taped and finished, 8 P . Final i n r spection: All systems in place, fixtures set, ready for occ ancy, , 9. Final Electrical#�. Fixtures and wall covers 'place. i� UJ completed in panel bo -x., 0--4-410- F.L"nal Inspectione. Commonly made after the building Ln — IS it aril ready for 110 arc Permit Issued when, on final ready to occupy, inspection, building is 12 a Other InslRections: In addition to the called inspections above, the building department may make or require any other inspections compliance It this code andr laws enf orced by the bu ilding department 6 INSPECTION CARD The permit holder or his agent shall post the inspection record on the jobsite'in an accessible and conspicuous official to make the red entries. The record shall be t ami � maintained der cant i t the final a_nspection has been made and approvedO I have read the above and will comply in my requests far inspections by diving 24 HOUR -NOTICE prior far insPectian to be made. Electrical: 359-3025 (8:00-9:00 a.m.) wilding & Plumbing: 359-3025 County Plumbing: 656-7210 ��