Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 21-00378 - Taco Bell - AdditionInspection Date: 08/03/2021 File Name: 21040DFR08032021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/04/2021 FA538267-EC25-4942-9A6F-9DADFE8E71A2 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Taco Bell Addition Start Time: 12:45 PM Client: Taco Bell Contractor: McKeon Construction End Time: 02:00 PM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): West wall footings, 10ft south of drive thru window #1; northeast and southeast corners of foundation Observations/ Remarks: Edgar and I checked and observed epoxy placement for the footing trench next to drive thru window on the west side. Then we observed Jeff from McKeon construction while he placed 10 inch bolts into the bottom wood framing. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 08/03/2021 File Name: 21040DFR08032021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/04/2021 FA538267-EC25-4942-9A6F-9DADFE8E71A2 2 Inspection Date: 08/03/2021 File Name: 21040DFR08032021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/04/2021 FA538267-EC25-4942-9A6F-9DADFE8E71A2 3 Inspection Date: 08/03/2021 File Name: 21040DFR08032021CTL Inspector's Signature:Inspector's Name: Chase Lake Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 08/04/2021 FA538267-EC25-4942-9A6F-9DADFE8E71A2 4