HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 21-00378 - Taco Bell - AdditionInspection Date:
08/03/2021
File Name:
21040DFR08032021CTL
Inspector's Signature:Inspector's Name:
Chase Lake
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/04/2021
FA538267-EC25-4942-9A6F-9DADFE8E71A2 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Taco Bell Addition
Start Time:
12:45 PM
Client:
Taco Bell
Contractor:
McKeon Construction
End Time:
02:00 PM
Inspection Type(s):
Epoxy Embeds/ Anchors
Location(s):
West wall footings, 10ft south of drive thru
window #1; northeast and southeast corners of
foundation
Observations/ Remarks:
Edgar and I checked and observed epoxy placement for the footing trench next to drive thru window
on the west side. Then we observed Jeff from McKeon construction while he placed 10 inch bolts into
the bottom wood framing.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
08/03/2021
File Name:
21040DFR08032021CTL
Inspector's Signature:Inspector's Name:
Chase Lake
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/04/2021
FA538267-EC25-4942-9A6F-9DADFE8E71A2 2
Inspection Date:
08/03/2021
File Name:
21040DFR08032021CTL
Inspector's Signature:Inspector's Name:
Chase Lake
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/04/2021
FA538267-EC25-4942-9A6F-9DADFE8E71A2 3
Inspection Date:
08/03/2021
File Name:
21040DFR08032021CTL
Inspector's Signature:Inspector's Name:
Chase Lake
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
08/04/2021
FA538267-EC25-4942-9A6F-9DADFE8E71A2 4