Daily Field Report
Project Name:
The Grove
Start Time:
12:15 PM
Client:
Stillwater Equity Partners
Contractor:
Headwaters Construction
End Time:
12:30 PM
Inspection Type(s):
Epoxy Embeds/ Anchors
Location(s):
NEastern most building. HDU hold down anchors.
Observations/ Remarks:
I observed that the holes were drilled to proper length and dust cleaned out.
The HILTI epoxy date was checked and used before the expiration date.
Holes were sufficiently filled with epoxy and anchors were placed.
Items observed are in general conformance with approved project documents and jurisdictional requirements.