Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 2 - The Grove at Thomson FarmsInspection Date: 07/28/2021 File Name: 20001DFR07282021CRC Inspector's Signature:Inspector's Name: C. Carlson Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/30/2021 7ca1bb41ba298523-1627496178090 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: The Grove Start Time: 12:15 PM Client: Stillwater Equity Partners Contractor: Headwaters Construction End Time: 12:30 PM Inspection Type(s): Epoxy Embeds/ Anchors Location(s): NEastern most building. HDU hold down anchors. Observations/ Remarks: I observed that the holes were drilled to proper length and dust cleaned out. The HILTI epoxy date was checked and used before the expiration date. Holes were sufficiently filled with epoxy and anchors were placed. Items observed are in general conformance with approved project documents and jurisdictional requirements.