Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 17 - 21-00119 - Adams Elementary School - AdditionInspection Date: 07/22/2021 File Name: 21020DFR07222021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/26/2021 005AEF6B-69D9-4D5B-B828-615CF4B67DE6 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 12:45 PM Client: Madison School District Contractor: ML Masonry End Time: 04:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Other Location(s): Gymnasium partition walls. Observations/ Remarks: Arrived on site around 1 PM and was informed that grout would not arrive until 2 PM. Masonry reinforcement bar was inspected and observed to meet specifications for size, grade, placement, spacing, and lap length. Masonry grout was at least according to specifications. Inspection observations were reported to Thomas from ML Masonry. Left site around 4 PM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/22/2021 File Name: 21020DFR07222021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/26/2021 005AEF6B-69D9-4D5B-B828-615CF4B67DE6 2 Inspection Date: 07/22/2021 File Name: 21020DFR07222021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/26/2021 005AEF6B-69D9-4D5B-B828-615CF4B67DE6 3 Inspection Date: 07/22/2021 File Name: 21020DFR07222021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/26/2021 005AEF6B-69D9-4D5B-B828-615CF4B67DE6 4