HomeMy WebLinkAboutSPECIAL INSPECTION 17 - 21-00119 - Adams Elementary School - AdditionInspection Date:
07/22/2021
File Name:
21020DFR07222021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2021
005AEF6B-69D9-4D5B-B828-615CF4B67DE6 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
12:45 PM
Client:
Madison School District
Contractor:
ML Masonry
End Time:
04:30 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Other
Location(s):
Gymnasium partition walls.
Observations/ Remarks:
Arrived on site around 1 PM and was informed that grout would not arrive until 2 PM. Masonry
reinforcement bar was inspected and observed to meet specifications for size, grade, placement,
spacing, and lap length. Masonry grout was at least according to specifications. Inspection
observations were reported to Thomas from ML Masonry. Left site around 4 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/22/2021
File Name:
21020DFR07222021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2021
005AEF6B-69D9-4D5B-B828-615CF4B67DE6 2
Inspection Date:
07/22/2021
File Name:
21020DFR07222021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2021
005AEF6B-69D9-4D5B-B828-615CF4B67DE6 3
Inspection Date:
07/22/2021
File Name:
21020DFR07222021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2021
005AEF6B-69D9-4D5B-B828-615CF4B67DE6 4