Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 16 - 21-00119 - Adams Elementary School - AdditionInspection Date: 07/21/2021 File Name: 21020DFR07212021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/26/2021 3B42D091-82AA-4B89-B3C5-521A1D891ADF 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 12:30 PM Client: Madison School District Contractor: ML Masonry End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Gymnasium partition walls Observations/ Remarks: Arrived on site around 1:00 PM and inspected Masonry reinforcement rebar. All masonry reinforcement rebar was observed to meet specifications for size, grade, placement, spacing, and lap length. Grout arrived on site around 1:10 PM and was placed according to specifications with vibration at every vertical rebar. Masonry reinforcement and grout inspection observations were reported to Eric from ML masonry. Left site around 2:00 PM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/21/2021 File Name: 21020DFR07212021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/26/2021 3B42D091-82AA-4B89-B3C5-521A1D891ADF 2 Inspection Date: 07/21/2021 File Name: 21020DFR07212021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/26/2021 3B42D091-82AA-4B89-B3C5-521A1D891ADF 3