HomeMy WebLinkAboutSPECIAL INSPECTION 16 - 21-00119 - Adams Elementary School - AdditionInspection Date:
07/21/2021
File Name:
21020DFR07212021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2021
3B42D091-82AA-4B89-B3C5-521A1D891ADF 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
12:30 PM
Client:
Madison School District
Contractor:
ML Masonry
End Time:
02:30 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Gymnasium partition walls
Observations/ Remarks:
Arrived on site around 1:00 PM and inspected Masonry reinforcement rebar. All masonry reinforcement
rebar was observed to meet specifications for size, grade, placement, spacing, and lap length. Grout
arrived on site around 1:10 PM and was placed according to specifications with vibration at every
vertical rebar. Masonry reinforcement and grout inspection observations were reported to Eric from ML
masonry. Left site around 2:00 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/21/2021
File Name:
21020DFR07212021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2021
3B42D091-82AA-4B89-B3C5-521A1D891ADF 2
Inspection Date:
07/21/2021
File Name:
21020DFR07212021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/26/2021
3B42D091-82AA-4B89-B3C5-521A1D891ADF 3