HomeMy WebLinkAboutRESCHECK - 09-00241 - The Raspberry Garden Apartments - 4 Units_F_
r
_ -,10
REScheck Software Version 4,1.3
Compliance Certificate
Project Title: Rexburg Married Housing
Report Date-,: 07116I09
Data filename: :�Dr rin �43& 1 -Pi bur 104 -
Energy Code:
Location:
Construction Tp ;
Conditioned Floor Area-,
Glazing Area Percentage:
Heating Degree Days:
Construction Site:
345 South 3 rd. 'west
Rexburg, I D 83440
2006 IECC
Rexburg, Idaho
Multifamily
1 766 M
%
8693
4
OwnerlAgent:
Compliance: 5.8% Better Than Code Maximum
531 Your U: 51
2� 442`�l
Apartinents
4 Plex (south bldg,)
Designer/Contractor:
'off I : Wood Fram e, 1 " C. 11 vu V.0 50.0 34
3840 21.0 5.0
Window 1: Vinyl Framej,Double Pane with LowLE 162
H•: 0.70 352 0.400 141
Door 1: Solid
Floor Slab -On -Grade: Unheated 40 0.600 24
Insulation depth: .F 192 10.E 140
Fumace 1: f=orced Hot Air95 AFUE
Compliancer bed hire is consistent with the buildin�#�,specifications,
and otherti�� ��� With the pit application. The Proposed b�ri���I be designed
REScheck Version 41.3 and tO comPlY with the to meet the IECC requirements
mandatory requirements listed in the fE'ScfnsPection
Checklist.
j�ECE 1%t
Project Title: Rexburg `arri d Housing
Data filen rne: Ar Ery �-1 - le bur \ �
Date
Report dat : 07/16/09.
Page I of
n
Ducts
in unconditioned spaces or ide the building are insulated to at least
R-8.
,
j
ucts
in floor trusses above an onditioned spaces or above the outdoors are
insulated to at least R-6,
Duct Construction:
Air- handlers, filter boxes, and duct connections to flanges of air distribution system equipment or
ht metal fittings ars sealed
mechanically fastened.
All jseams, and connections aread ubtntll iy airtight with tapes,i
���in� t(adheslves) or other approved closure
sYstems. Tapes and mastics are rated U L 181 A or U L 181 B.
Lj Building framing cavities are not used as supply ducts.
Automatic or gravity dampers are installed on all outdoor air intakes and exhausts,
�Additional requirements for tape sealing and metal dot crimping r included - � � _
� � inspection �r rnp��n with �h International
Mechanical Code.
Temperature ratur Controls:
L) Thermostats exist for each dwelling unit non -dwelling areas must have one thermostat
for each system or ne, A manual or
automaticmeans to Partially restrict or shut off the heating and/or cooling input to each room i
� provided.
Electric Systems:
Separate electric maters exist for each dwelling unit.
Heating and Cooling Equipment Sizing:
El Additional requirements for equipment sizing are included by an inspection for Cn�l�n with t�� � nttional Mechanical i od.
Circulating of Water Systems:
Circulating hot water pipes are insulated to R-.2.
.
Circulating hot water systems include an autoMak or accessible manual switch to tCirculating
in use.
u � off thepump when the system i nit
Heating and Cooling Piping Insulation:
HVAC Piping conveying if uids above 105 degrees l^ or chilled fluids below 55
degrees I= ars insulated to I-.
Certificate:
Permanent certifiGate is provided on or in the Itn"l itr`rbution�� f*
� ftinthe predominant insulation ,alu; window
-factors; type and efficiency of spat;conditioning and water heating
NOTES TO FIELD: (Building Department Use Orel
y)
Project Title: Rexburg Married Housing
Data fil n r -n : ftDra rink �1-pj burg�0 - D\r uh l
Report date: 07/16/09
Page 3 of
Q
s
Date: 07/16/09
Ceilings:
REScheck Software Version 4.1.3
Inspection Che.cklis.
Ceiling 1: Flat Ceiling or Scissor Trust R-50.0 0.
continuous insulation
ornent
AbovenGradeWalls:
LJ Wall 1 Wood Frarne, 16 '"
4 + R-5-0 continuous insu ation
Windows:
LJ Window 1 - Vinyl Frarne0ouble Pane with Low -F, LJ -factor- 0.400
For windows without labeled U -factors, describe ftur:
Prr -. Fri Tp
Tarr Break?
Comments.-
Note:
ment .
o: UP tO 15 s0t. of glazed fenestration per
Doors: or and SHGC requirements.
Q Door 1: Solid, -factor: 0.600
Comments:
:
This door is exempt from the -factor r
eqire-nt.
Floors:
� FloorIrk-n-rd:Unheeted'
. inulatron depth, l-1 0. 0 continuousinsulatio.n
Comments:
ruiatioil extencis down from the t0P of the slab to at It .
� ��t Int ����ttotl distanceof w . m of the
slab then horizontally for
Heating and Cooling Equipment:
L Fumace 1; Forced Hot Air. 95 AFUE or higher
Make and Moder Number:
Air Leakage:
L] Joints, penetr tint and all ether such openings ,n the building envelope that are sources of air
RecessedL] light are either 1 T l � are I
rated with enol ur al d
Erebele, or installed eete� rr�t 1 to t ilii �r
ed inside erg air -tight mbf i 1� ) Type r rated and ASTM
insulation. �t� lea ie fr.rrr combustible materials e�rrarand a 3" clear ,ce from
Vapor Retarders -
Vapor retarderis installed on the
winter side of all non -vented framedceilings,
Mit�ar� or its freezing�f not arnage the �-r-rtri �li� r�� floors; or i� � ��� tr���1 �
� other approved rrr� t ����' ��f� at
Comments:condensation are provided. � .
Materials Identification:
Materials and equipment are identified so that compliance can be determined.
LJ Manufacturer manuals for all installed
heating ncoolingequipment �t
� and rr� et�r heating ��i��e�t h� .�
Q Insulation -valuer,, glazing -factors, and h e ` r, Provided.
��rr � � �i�rr�� il� r+ Irl �rc� r� #!�
L1 Inr..�ftfr� l installed rein to enfeinstructions,
��rfrr� plans �r �e�i�eti��.
t�r� �r�tr��t��r'� In �tr���r I��t
that achieves the rated -value without with the surface being Insulated, n in e
mpMre in the insulation.
manner
Duch In lata
Project Title: Rexburg Married Housing
Data fflnrne:
A swings\438-10:Plea e b r X04.-
. [�rheckk-7-'f -0.r
Report d te., 07jj 6/09
Page 2 of
s!
2,006 IECC �nS a
ergy
t:tticiency Certificate
Wal!
Floor 1 Faundation
Ductwork (unconditioned spaces),
Window
Door
Forced Hot Air Furnace
Water Hasten.
Name:
Comments.:
.00
26.00,
10.00
0.40
.
60
9-5 AFUE
Date:
0.70
NA
JUL 2 0 20,09