HomeMy WebLinkAboutENVIRONMENTAL ASSESSMENT - 98-00038 - West Tisbury - ApartmentsIdaho Housibg
a -rid Finance
ASS OCiAl- Ipn
December 19, 1997
fir. Joseph Laird-, City Engineer
City of Rexburg
12 N. Center
Rexburg, Idaho 8_3`440
SUBJECT -a* Environmental Assessment - West Tisbury Apartments Project
Dear Mr. Laird:
o. Box 7899
olsc, Idaho 83707-7899
-331-4882
Fax -331-430
vF� _ r
TD 800-345-1833 Ext, 400
Homestead Holding, a housing development company, has applied for federal HOME funds,,
urhich are administered by she Idaho Housi-no, and Finance Ass
ociatton (IHFA), to construct a 34-
unit apartment compleX in Rexburcr. funds have been reserved for this project and may be
committed after a federally mandated Environmental Assessment has been completed_
Project Description: The proposed 334-unA complex wi11 consist of ?G two-bedroom unit's and 8
three-bedroom units. The project will target families whose median incorne�4 PrP n n�
60"No level.
uv;U Yv L,,V
The complex will include a community bu'ld'ng consisiinQ of an office and a
maintenance room_
Project Locatio,n.-, youth 5th Street, Rexburg, Idaho., maps of the pzop�s�d project site have
been 11c�udCd for your convenience.
ApPlicants.- Homestead Holdincr Company
P.O, Box ?61
Boise, ID 8.3' 7 0 1
Greg Luce (208) 343-3645
In campiiance with federal regulations, 1HFA
MUSt ensure t t t I -r A fte t the qual"ty of the human
significant1v impac
t
gent. To assist us in our Environmental
we wQuia appreciate it if vouu�cw�lete the enclosed checklist.
Please return the checklist and any comments or concerns in the self addressed, posta,!ze paid
envelope_ If you have any questions, please contact Dennis Porter at {2Q$} 331-47596�
erndoc
9 -
PROJECT: West Tilbury Apartments
1. Are any traffic
noise levels scJ
[ ) Yes
improvement projects., airport expansions,
�eduledwfthin the next ten years.?
fo Comments
etc., which would increase site
2. Is any pert of she ate known or suspected �o contain archaeolagica� resources?
Yes � o Comments
3. was any part of the site been identified as potential I"v a jurisdictional wetland by the U- S.
Army corps of � ngineers or the Local Planni'ner Department?
�) Yes a
4. Is the project located on a 100 -year flood plain? FEMA leap No.
I I Yes 1?<0 Comments:
5. W-111 the prOject anveri prime farmland to resi'dential use?
�) Yes oComments:
5- Is the project located -within an airport el
rt zone?
Yes R<O
7- Are there any u ique natural features or areas on or adjacent to the site?
� Yes � �
Comments:
4k
COMPATIBILITY WITH SURROtiNDING DEVELOPMENT
� Is the T -o osed project consistent with
re ements?
Yes No
Comments-
the
communities comprehensive pian. and zon�ng
9. Project is zoned ,ter f'� ' d'2
Which allows:
2ffiv al
AIS QUALITY
Id. Does the project require an installation permit., operating permit car indirect source permit
under local pollution control agency rules?
r
�) � es o Comments;
1 I . Is the project located in the vicznity of a manitoring station where air quality violationshave
been recristered?
C � Yes �o � Comments:
SITE ACCESSIBILITY
12. Does the site have legal access to
A;;;�es No
Comments,
� 3 . Are there any barriers
[ I No
�2'mdoC
a dedicated public street`?
to emergency vehicle access?
Comm e -n SI:
i
Water Supplier
a
M-0
20. If public water is not available what is the available water source?
l�
STORi1�I WATER
21. Is public storm sewer available at the site?
[es/
No Comments:
�?vr/r7
'00e
,j�wwjQ
j Alf
area don��rucf`d ih
W4 F Gy
A"7
� Dohe�a.
22. If���h� a co inedw7ste/sfo 'e'o O'of psewer. 4a4KJW1;)61-C�d4e-P,*Yes o Comments:1'40410 ve d d 4 P,:,"7� �' �Gi>d�ai
M F-_1 I V
ro 4r
Z,�l Gam, � h��
1! ✓Id4a.�
23. If public storm sewer is not available, how will storm water drainage be handled?
�lcrM �r�ii-�
d��c��Ja IWL p 0 N <
00V
e6a I jet A Of!)
60�"/-Av r-rrl
itself -24. Will the prayCct ause or sui stantially contri';Xutle to off
.off, leaching of chem"
icals, or other pallutants?
]Yes 0 Comments:
SOLID WASTE
25., Is collect' garbage t- 9 ion available?,
els
Is zt provided by C ]commercial service
.0
Comments..
trr- doo
�ra
Q
L7 ��rn cr�irla� c
site pollution by s orm water run
ocal govern�neni?
-"a
a
2 6. NVhere does the community dispose of its waste.?
or
7 5 14;2w
7/
27. Will the project come a burden on existing landfill capacity?
� � Yes 0
? Comments:
Completed by:
W,
Signature
Printed Name
Title
Date
crr.doc
P
0
ir
/ p
a-� 000004
iZex b Li rg,
".0 4