motion was made by DavawnBeattie and seconded by Ted Whyte to
approve the mi'nutes of 4/9/97
RE* ERICKSONS PONTIAC
TOP(4001182111ERICKSONS
SIGN ORDINANCE)
Erickson Pontiac clarifti and site plan4
Erickoon was at the meeting to resent and discuss these changes.
k
1 s-Lthe sldewalk on 2nd West, When
Meltingthey saw the p-1--oblem made by sandingbuild
of sand from the Jnr
it NZ -0 C,- VV C J_ ij I e 0 Tzere was o�f
to 10 of red c inders all along the propei:ty which was terrible and
that I's bec;ause they have to sand that corner heav ily,, Because of that
they could see that maintaining that grass out against 'the curb would
be difficultV It will neve' look w
f f 1*cult to
mainta-in that as lorig as they continue
wanted to move the sidewalk out against the curb, allowing them to
maintain a grass strip behind the sidewalk that will be attractive and
look good. It watild be lined up w*th the sidewalk a -long f o -r part of
the block. On the corner there 'is a sidewalk that is about 11 f eet
w ide and it goes for about 90 feet and then Pt narrows in with a grass
Strip. There is no s1dewalkmacros(discussion)i-F
on
was made by Davawn Beattl'eto accept the change In the plan with the
idewalk against the ciirb and gutter. Seconded by Ji -M Lon
9. All Aye
(2) Eric asked for
height of anything
they are planning
clan -t the site triangle? The maximum
in the site triangle is 3 feet The lands a
n the site r Tangle11 .
(3.) He asked for clari,fication on the sian ordinance.? He underntood
that a si-gn could be 65 square feet per frontage. He asked the
difference betweenfree standing
and monument i Joe
explained and told .L was
Of the
i n and he could have one o � .
T kava 0 � n in
the si"te tri"angle which will a monument sign out of rack that wi.11
t _.
f it right ]'-n with the boulders. Joe told him they could also have a
wall type sign on the building,
DEAN BIRCH APARTMENTS
TOPIC: (400,183,r?BIRCH*DEANfAPARTMENTSfPARKING SPACES)
Dean Birch- Site plan -for an apartment at 255 South 2nd West. Mr Birch
explained they want oita house for the managers where there use
to be an odd ui-ding they had removed. Between their
Inn they want to build a 9 plex apartment. They will have 290 parking
spaces and will have 390 students. The parking i
s adequate. He showed
the a nine There will be 6 students i
in each apartment* John
Millar told him for the manager unL-t they woula need 2 parking places
plus 38 additional parkin.g spot for the new add*t'
i ion. Joe said there
would be more than enough perking se. (discussion) The board told
him he would need to have an architect dry
w the plans with all the
requirements such as proposedorate
location o ies, size an
f water lines, fire line flow and location fire hydrant
and the dimensions are not on the plan. john Watson stated there
wasn't enough information the plite sure ,
would be built that way,
The board told him for the single unit for the family, it did not need
L
t approval and they could start with t
hat,, The board could acce t
the res til concept but nothing else can get built
until it I
drawn by an architect and approved by thIs board. 7 ohn Millar statedhe needs to measure and make sure there is - green space. He was -
told
of t l he nee-ded to bring the l a back to the next meeting.
Joe asked about the area out in front. The ord i
�astates there is a
setback required and there can 1 parking in that setback. Thr
is already asphalt there and he wondered f that would grandfathered
it. If it has not been counted as parking
grandfathered,
RE* NEW BROULIMS
TOPIC:(400r183,1BROULIMS,ASSOCIATED FOODSISTORM DRAINS)
Associated Food. Site Plan. Dick Broujims
explained. The plan had been drawn by Great Basin Engineering., Kirk
Randail was at the meet"ng to represent them. The new storm sewer and
water line will run uP Ist West and thl's development will be tied into
tht4 They explalLnedthe water,
will be done and how th ii be connected. (plan was explained
revi-ewed and discussed) Jirn Long declared a conflict of Interest
because he is on the board for the redevelopment agency and did not
vote on. motion. A emotion was made by JohnWatson that the plan be
approvalapproved as drawn cantingen't on the techn'cal it
staff. Seconded by Da
DATE: (051497)
Present were h 3 - n
Excused:
City Clerk
Engineer:
Attorney*
council Person.
Minute
Planning & Zn_in
05/14/97
7:00 .V
Mary Ann Mounts
Davawn Beattie
Jing Long
Richard Smit
Roger Muir
Mike Thueson
Ted Whyte
Doug Smith
John Watson
John Millar
Rose Bagley
Joe Laird
Stephen Zollinger
Marsha Bjornn
Da i l Jose
motion was made by Jim Long and Seconded by
the minutes of 4/23/970
RE : I INSURANCEAGENCY
TOPIC: . f 186 SILVERTREEBUILDERSr MUK
ARCH BALD AGENCY
Davawn Beattie to approve
Troy Halting of
SilvertreeBuilders, showed
a plot plan for
for the
A
-i-mprovements to
ArchibaldInsurance agency.
Their would be an
addition
to the west side
of the existing i l in
000 square feet.
A pad
would be put in
the back forfutures retail use.
The plans showed that
the parking would
exceed the regulations. for
D - The building
will
be 120 feet from
Rainbow Perk parking lot. The parking lot will
merge
with the existingparking
lot behind Murdock
Travel
Joe questioned the
the plan for the sn
moved'? There i
Plans show drainage
the storm drain Is
exit out drive way by Murdock
Ow removal. Would the French
toren drain in the back. Troy
over the sidewalkill, Was not
located. Discussion.
Travel and what was
drain have to be
indicated that the
completely sure where
Davawn Beattie made -the motion to approve the plans Jim Lon
seconded.all aye.
RE ; DEAN BIRCH APT. SITE PLANS APPROVED
TOPIC: (400r186jjrDEAN BIRCHeAPART NITS)
George
Benson showed
the plans
for the
Dean
Birch Apartment site
plan*
Davawn Beattie
accepted
the plot
plan
Ted Whyte Seconded,, all a
t
it
right
in with
the
boulders Joeof could.
wall
type
s-L.1gn on
the
building,
RE } . DEAN BIRCH APARTMENTS
T F 183 IC*DEAN I APARTMENTS . PIING SPACES
Dean Birch- site planfor an apartment at 255 South 2nd West * MrB3-rch
explained 4C. -hey want to build a house for the managers where there use
to be an old building they had removed. Between their park and Days
Inn they want to buildi apartment* They will have 290 parking
spaces andwill have 390 students. The parking is adequate.d
the landscaping. There will be 6 students in each apartment. John
Millar told him for the manager unit they would need 2 parking places
plus 38 additional r i g spots for the new addition. Joe said there
wouldmore than enough parking spacesS (discussion) The board told
him he would reed to have an architect draw the plans with all the
requirements such as proposed water and sewer facilitiest size and
location of water lines, fire line flow and location of fire hydrants
and the limens ions are not on the plan. John Watson stated there
wasn't enough information on the plan to approve it and make sure it
wouldi It that way.
The board told him .dor the i unit for the family, did riot need
site approval and they could start with that. The board could accept
the residential concept bit nothing else can get built until it i
drawn by an architect and approved by this board. John Millar stated
he needs to measure and make sure there is enough green space. He was
told needed, to bring the plan back to t.he next meeting.
Joe asked abut the area out i
setback required and there can't
is already asphalt there and he
L t - If it has not been counted
r ndf athered
front. The ordinance statesthere
be any parking in that setback. There
wondered if that would grandfathered
. parking now it would not be
R : NEW BROULIMS
TOPIC.; (400 BROULIMS r ASSOCIaTED FOODS rTRM DRAINS)
Associated Food Site Plan. Dick Broulims showed the plan and
explained. The plan had been drawn by Great Basin Engineering, Kirk
Randall was at the meeting to represent them. The new storm sewer and
water line will run up 1st West and this development -iii be tied -into
at 4 They explained the water, sewer and street improvements that
viii be done and how they will be connected* (plan was explained,
reviewed and discussed) Jim Long declared a conflict of interest
becaLise he is on the board for the redevelopment agency and did not
vote on motion. A motion was made by John Watson that the plan
approved as drawn contingent on the technical approval of thec`ty
staff* Seconded by Davawn Beattie i i Aye
DATE
Present
(051497)
were# chairman
Members
Rxcused:
City Clerk
Engineer,
At to rn ey
Y
u -1.ran
MinU4-eS
IC-niZoning
05/14/97
7'00
Mary Ann Mounts
Davawn Beattie
Jim Long
Richard Smit
Roger Muir
Mike Thueson
Ted Whyte
DOug Smith
John Watson
JohnM'llar
Rose Bagley
Joe Laird
StephenZoll-Lnger
Marsha Bjornn
Dl. jQse
A motion was made by Jim Long and Seconded by Davawn Beattie
the M,
4/23/97#
Builders e showed a P10t
mPrcvements "o Archibald agencV, Their would be an add.L i -on
to the L side of the ex'sting building
•l pub I pad
the park' retail use., The plans shcwed that
j.ng would exceed the regulations e huildin 4
il
be 120 feet from Ralnbow Park parking 10t, The
ParkIng 10t will mergeJth the wl-
existing
parking 10t behindT
Murdockice auestd,
& ioned the exit out drive way by e l and what was
the planr the sn.owr
emovai. woul-t
move? there ' draina the French have to be
1n the back. Troy indi-cated that the
Plans Show age over the sidewalk, Was not com j. I -ure w
the Storm drain
13
located. Discuss, y s ere
on-*
Davawn Beattie made the mOtiOn to apnrove the
aye.
)'-George 3enson showed the clans
Pian. Davawn Beattie a.
plansong
-r the Dean Birch Apartment
the plot Plan Ted Whyte Seconded, all aye,,
Jared Sommers showed the plans for
COndition Use permit fOr aPartment
Sherwood Hills. Mike Thuesen moved
0
J Lm Long seconded, All aye
h
Pa Ing and for the
in the basement of his
home
that it. 90 to Public Hearing
Public Heiaring
fresh pack. gOr W * lcOx & Sons inc. f Or zone change t
Mary Ann opened the
Notice
public fir � ��
Hearing Regarding Proposed o
the
and
put in a
enclosed)
Not' -Ce is hereby
RE: FENCES
TOPIC* 400rI rrrFENCES
Stephen then opened discuss"Ion to make a dec'sion for the fences.
Committee discussed that that see throes
gh or 5ft., set back or
feet form curb. Could not come to a decision. Tabled until next
Adjourned by Jim Long . Seconded by Mike Thueson
15
Millar told him he would need to bring in a sit plan and a copy of the
easements.
. EDWARD E JONES
TOPIC: (400,2081trEDWARD E E r HA T T SIG N
Edward E Jones Sign,Steve Hart was at the meetlLng to explainthat the
want to pu.t two signs e property instead of one. The -property i
zoned Residential, but the building has been on the property for a long
til-mtil-me andwhat is there is grandfathered. They had let Edward E Jones
put his sign up until the owner Steve Hart wanted to put up a sign.r
Hart needed to put up a sign now which would make two signs on the
property. One sign would be a monument sign. motion was made by
Davawn Beattieand seconded by Mary Ann Mounts to set a public hearing
for a Variance to allow another sign on this property.
DR ROBERT WALKER MADISON
TOPIC: r 2.08 r r r WALKER*DR.
MADISON FE I OVAL PARK
PROFESSIONAL PARK
ROBERT r TEE` BART r
Bart Stevens was at the meeting to show the revised plans for Dr Robert
Walker in the Madison Professional Farb that had previousiy been
approved. It has an unfinishedbent and he wants to finish it and
rent it to a Physical Therapist. He wants to put parking down the side
f the buildi_ng, with it perking stalls. There 'is an overhead power
line so because of that Dr Crouch had to make the lot next to it really
small. Bart explained the parking. He handed out copies of plan and
showed pictures. Dr Walker's building has 3500 square feet on the main
floor and 1800 feet in the basement which will be finished for the
therapist. Jim questioned the paving, saying there iB too much
asphalt. discussion Jiro wanted to see copies of the minutes and a
copy of the plan for Madison Professional Park(also
covenants). Bart explained that there is 9000
square
landscaping. Jim stated he sold the concept of this
neighborhood on the concept that it would not be a massive arin
lot
and that is what it is becoming, Mary Ann stated remembered that i
was to be a nice residential area with arof �
� anal office overlay
and Miers was suppose to be low volume traffic type businesses, not
necessarl-ly all Doctors. This was important to that neighborhood t
m l- t in the residential atmosphere and all of a sudden we are putting
in some huge. buildings and that is how you determine how'
much ren
u
(discussion)John Hilar stated that the idea was to have
low volume and 10w use. A mot' made by Jim Long
that we need to
gam' to an informal Public Hearing for the neighborhood. Seco
ndedby
Richard mit.. Dr Crouch needs to know we are concerned
development* All Aye
(After meeting ]fir Walker came
going to put the extra parking
RE: FENCES
TOPIC:(400,208IFfFENCES)
to cityhall and told Rose he was not
in but instead put lawn in..
Discussion on fences and m n in the ordinance.
that we table it to another meet i
f
It was recommended