HomeMy WebLinkAboutLETTERS - 98-00032 - Staples - Office Supply StoreM
A;
Residential FundzngCorporat'ion
8 0 0 Mt. Vernon Highway
Suite 120
Atlanta, Georgia 30328-4225
Re: Rexburg Idaho Staples More
Crentlemen:
STATE OF IDAHO
This letter Is to co'nfirm that sewer service is available to the Property xn
Sufficient to service the new Staples Store located on North 2nd Fast 'in ]Zexburg,
,iolu
P,MmI
llar P.E./L.S.
m
umic Facil�ties Coordinator
City of Rexbuxb
OVER 10m . .Wr,01
12 North Center Street
Rexburg, Idaho 83440
Phone (208) 359-3o2o
Fax (208) 359-3022
&-maif rexbUrg@smnat
capacity
Idaho.
i
4F i
Sept. 18., 1998
Mr. Brett Hastings
Platinum Development, L.L.C.
3 10 North 2"d East
Rexburg, Idaho 83440
RE: Staples Store Plans-,
]ear Brett'.0
STATE OF IDAHO
PO Box 280
12 North Center Street
Rexburg, Idaho 83440
Phone (z08) 359-3020
Fax (208} 359-3022
�-mail rexburg@stv.net
We just received a copy Of the Structural calcul.at�ons for the Staples Store from Mr. Scott
Spaulding of Design Intelligence aha did the str.a+ctural design works We find tha-L he used a
70 mph wind speed in his calculations for the shore rather than the 80 mp�i. wind speed that the,
Rexburg City Council has adopted as the standard design v�.1�e far Rexburg buildings,
Mr-; SPaulding Will need to recalculate those portians of hip design vvo�k where a 7� mph wind
than the standard 80 mph wind was used. 'VL�he�re such recalculations show that portions
of the structure plans need to be changed, we vvi.il need to have you. resubmit such changed sheet
of plans for review and approval.
Your Stapley Store plans are still approved for site work, street constructiona water, sanitary
sewer, storm drain, gas,, telephone, and ower xnstallation; however,, we will need to see Mr.
Spaulding's revised structural calculations ons and revised plans before the con5trxction of �.n
building forting, etc. are started. y
We also need to knew what E
ngineering finn is going to be acquiring the Flood Elevation
Certificatewill and which ��� be doing the construction inspectionof tile streetswater sewer and
stor�. drain facilities.. P
Thank you dor your immediate attention to these matters.
Very truly Yo -Ours
JOSEPH A. LAI-R-D-
CITY
ENGINEER & BUILDING OPFICIAI,
0
October 231, 1998
To Whom is May Concern:
STATE .F IDAHO
12 Forth Ginter Street
Rexburg, Idaho 83940
Pone (208) 359-3020
fax (208) 359-3022
e-mail rexburg@sr►r.net
I am writing this letter to verify that the building and improvements currently being
const�.cted at 6 7 S earth Z�'d East in Rexburg, Idaho �i. e. Staples -The ��ce Superstore} have
been approved by the City of Rexburg. Also, I certify that the following statements are true"
1.
The. ,site is paned for commercial use and the use proposed for the
constfucted is in compliance with the current coning cede.
2. The site is annexed into the City of Rexburg
3. pity wader, sewer, and storm drainage are available at the site.
If any additional informat-on is required, please feel free to contact me.
Sincerely.
a
Val Christensen
Assistance Engineer
VC/dj
building being