Loading...
HomeMy WebLinkAboutOBSERVATION REPORT - 98-00029 - Fire Station - Ambulance AdditionJRW & ASSOCIATES 49 PROFESSIONAL PLAZA REXBURG, IDAHO 83440 PHONE** (208) 359-2309 Fax: (208) 359-2271 PROJECT: RExBUR - MADISON COUNTY AMBULANCE LOCATION: REXBURG ARCHITECT: ,IRW & ASSOCIATES PRESENT AT SITE: DATE: 3 AUGUST 1998 WEATHER: CLEAmmmmmw-w�_R OBSERVATION BF: ,TORN WATSON9 RICHARD ELLIS9 ]RANDY HILL WORK IN PROGRESS: TEMP.: 8 5 0F OHNNY'V�ATSON EXCAVATION / RELOCATE GAS LINES /FORMING CONCRETE FOOTINGS OBSERVATIONS• CONTRACTOR REPORTED THAT GAS COMPANY WOULD NOT BE ABLE TO RELOCATE THE GAS METER TO THE EAST SIDE OF THE BUILDING FOR 30 DAYS. APPROVAL WAS GIVEN BY JRW TO RELOCATE THE GAS METER BY THE FRONT (WEST) PLANTER SINCE IT COULD BE DONE IMMEDIATELY. MIKE WALKER REPORTED THAT THE WATER HEATER WAS NOT ADEQUATE TO PROVIDE HOT WATER - JRW WILL REVIEW WITH DOUBLE E CONSTRUCTION. CONTRACTOR DISCOVERED THAT TIE EXISTING PLANTER FOOTING WAS 4 FEET DEEPER THAN AS SHOWN ON AS -BUILT DRAWINGS.. IT WILL COST APPROXIMATELY $2,800.00 TO BRING IN EQUIPMENT LARGE ENOUGH TO REMOVE THE CONCRETE. JRW VERBALLY APPROVED THE PROCEDURE AFTER VERIFYING THE CONDITION. CONTRACTOR REPORTED THAT THE EXCAVATION SUBCONTRACTOR REMOVED APPROXIMATELY 12 INCHES TOO MUCH MATERIAL IN THE FOOTING TRENCH. HE WAS DIRECTED TO EITHER EXTEND THE FOOTING OR PROVIDE ENGINE TQ THE OWNER. ERED FILLATNO COST JRW DIRECTED THE CONCRETE CONTRACTOR TO MAKE CERTAIN THE FOOTING TRENCHES ARE COMPACTED BEFORE INSTALLING REBARs JRW WILL VERIFY COMPACTION. CC: MADISON COUNTY COMMISSION RICHARD ELLIS BLAIR MANWARING SPENCE LARSEN MIKE WALKER RICHARD HORNER E.C,,I.,P,D,.Ao