Loading...
HomeMy WebLinkAboutFEES - 99-00039 - Heledor Storage Unitsa 11Ndrq6F­Y %arw WNW '%EW W %WW1ff 4 %.I— TABLE 1-A—BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 to $500.00 $22-00 $501.00 to $2,000.00 $22.00 for the first $'00.00 plus3 $2..75 for each additional $ 1 [}t1.00, or fractian thereof, to and including $2,DOD.0D $2,001.00 to $25.000.00 563. 0 for the first $2,000.00 plus $12.50 for each additional $1,000.00, or fraction thereof, to and incIuding S, 2,000.00 $25,00 1.00 to $50,000.00 $352.00 for the first $2' D,000.00 plus $9.00 for each additional $1,000-00, or fraction thereof,, to and including $50,000.00 $SO,U01.On to $IOD�aao.00 $580.00 for the fiat $SD,04Q,Ofl plus $6.25 for each additional $1,()U0.DO, or fraction thereof, to and includin(y $ 1 00000.00 S 10[3,a0 1 .DD to $500,DOD.f?�$895.D0'5,.00 for each for the first $ 1 00,000.00 plus S additional $1,000.00, or fraction thereof $500,00 1 .00 to $ 1,000.,000.00 $2,855.00 for the first $500,000.00 plus $4.25 for each additional $1,4DO.O0, or fraction thereof, to and including $ L,000.00 $l,fl[]O,D41.0[i and up $4,955-00 for the first $1,,000,.000.00 plus $2.75 for each additional $1,OOO.p0, or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours $42.00 per hour (minimum charge—two 1)aurs} 2. Reinspection fees assessed under provi'sions of Section 108.8 .P ... -A b_ 0 9 1 + 4 W a m & 0 . W 0 4 P 9 a a a $42.00 per hour* 3. Inspections for whi"ch no fee is specifically 'Indicated ... P 0 1. 4 ... 9 0 E 4 a .3 0 1P a 4 $42.,00 per hour -t` (minimum charge—one-half hour) 4. Additional plan review required by changes, additions or revisions to, plans $42-00 per hour* (minimum charoe—one-half hour) . . ...................... . 5. For use of outside consultants for plan checkina and inspections, or bath..................................... *%04 mom.ffid W*NWA*10.1 A,ctual costsy* UIC, LOW1 fiouriy cosi to me uriscliction , whichever . -Is the greatest- This cost shall includeli, overhead,, equipment, hourly wages and fringe benefits of the employees involved, **Actual costs include administrative and overhead costs. r, 1/a 1�41C f 1 � s