HomeMy WebLinkAboutAPPLICATION - 99-00038 - 103 Marianne Dr - TownhomesCITY OF REXI3tiRG, IDAHO
APPLICATION FOR BUILDiNG PEI2IYIIT
Date of Application �' � �l�
Pe-rmlt No
N,.ER
Name
Site Address /0,5
Maf ding Address j o
C*ty/State/Zlp
TeiePhone/FaxlMobile
CONTRACTOR
Name
Mailing Address
4P
C itylStatelZip_
M
Te:ephone/F'a.�obile
PR�.�CT �NF[�R.��A � ON
Az-chitect or Engineering FiER.
2_1 2
1� 03 7
�LP��
��1fi',^c
G
1 -�?—�,h'-rr'�
Ida..Lic.No. Pian Name
ase att-7 -7 t- j!:,5P-
division ��A��
exc-� yr- %F -0 Lot iN
3�3 Block
A7
(circle aur) Residential/CQmmerciallEducational/GavernmentlReJig-Ious
Desc;ipcion
(El samples;
I ewdill, . . ..... . . . ...
Ot'se o reser n i I m j
�r��nerc�a� coouei
Square feed.{���0. of 5taries
N
eight of Bullain
Basement � fnishefifMtshed Garage sq. feet,�._-PatiolCarportJAwning
What will Structure be used for (including name of business if applicable)-
fused for a multiple family unit peasemedicate riumber of units:
— ------------
Total Est1mated dost� � r �'J
Will dwelling be in a flood Iain? � ;: _ _
4f VA
Signature of applicant
tt)f OFFICE USE ONLY -TG 7AF :AF ;Ptq
Tax CodeZone tb1l
Building Type,--. V'AE
sat gnatun: o 4F r
Building Permit Fee %�# --
Plumb -Ing Pennit Fey
DiaQing Permit Fess
Linear Foot Charge
Water &Sewer Fees
P 1,q n
An-
d
i
oil
0 C1
� 1999
PITY OF RE'2;Z8URG
7
W
r
Excavation &
Earthwork:
I
Concrete
Vol
i.
Masonry, P�' 7
Roof
ng
It
Insulati-on:
SUBCONTRACTOR LI -ST,
. �2%��
Drywall:i�IZ-�
Paint a -ng
Floor Coverings
Plumbing:
Heating:
Electrical:
Roof Trusses,
M
cL'
SPECIAL CONSTRUCTION_
(MANUFACTURER OR, SUPPLIER)
Floor Ceil 6 "Toists
j.ng j
Cabinets
.0
Sid ing/E-x-'L-.c,.,z1r icr Trim.
Other
G
0-
0
0
0
I
0
i.
.a
iL
m
m
m
C:
m
ri
m
m
op
:z
rt
R
r
p.
I
CD
CD
3
1 -a Cr
-0 CD
a- CL
0
(D
0
R.
7r Z) CD
CD
0
D
0 (n (n
CD 0
0 0
(n
-0
cb CD
-0 a
(D
0 P-+
(D
c
(D En
—.0 C
=:= c
C;7
CD
w 0 C
< o L
m E3 C)-
-1 -0 D
CD —
fn CD
CD c
a
CD
0 N 0
cD a o
aD
zr
Lj
rn c
r
.CD w r
(Q a
c 0
c
c
0 CD
L
m
CD
ID
C2-
L -d
Z
m
0
0 �
m
C:
:z
rt
R
r
p.
I
CD
CD
3
1 -a Cr
-0 CD
a- CL
0
(D
0
R.
7r Z) CD
CD
0
D
0 (n (n
CD 0
0 0
(n
-0
cb CD
-0 a
(D
0 P-+
(D
c
(D En
—.0 C
=:= c
C;7
CD
w 0 C
< o L
m E3 C)-
-1 -0 D
CD —
fn CD
CD c
a
CD
0 N 0
cD a o
aD
zr
Lj
rn c
r
.CD w r
(Q a
c 0
c
c
0 CD
L
m
CD
ID
C2-
m
m
�o
Z
m
0
0 �
m
C:
m
m
�o
ts-
rip
al
rm
C:
rn
ts-
rip
al
F
0
CD =r 0
(D
cf) CD
co
U) L)7
Ln
D
(D (D
Cly
in
on
r.d
r�
D
f-+
M-'
17
m
m
(1)
4
AM
0
r-+
Cf)
CD
CD
CD
CD
Wr
Cly
in
on
r.d
r�
D
f-+
M-'
17
m
m
(1)
4
AM
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construcdon, from time to time the building official,, upon notification
from the permit holder or his went, shall make or cause to be made any necessary inspections and shall either
approve that pordon of the construction as completed or shq no�fy the penn�t holder or his agent wherein the
same faits to comply with this Cade.
1.
LAYOUT.4� Lot corners staffed, staking in place for�bui�ding, prig to excavation:
2. FOOTING: Commonly made after poles or piers are seg or h", or basement areas are
excavated. banns and hon'zontal reinforcing in place, vertical reinforcing cut and an job
site or tied in place.
34, FOUNDATION INSPECTION:
The foundation inspection shall included excavarians for thickened slabs intended for the
support of bearing wars, parddons, structuraI supports, or equipment and speC�ai
.... , . � � �,A�, = requirements tar woad f�vundations, A�� �'a�ms and reir�fvrcing steel, eu., shall be in
place.
4. ,:. ,��P,��.[-MBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment, before fixtures
a. � �� are yet, and prior to framing inspection.
510 TRUSS INSPECTION.
Inspections of tmsses to see they meet shop drawing requirements and that they are
installed and braced adequately.
b. FRAME AND MASONRY INSPECTION:
Commonly made ager the roof, masonry, ani framing, firestopping, draftstopping and
bracingare in place and after the plumbing, mechanical and electrical rough inspections
are approved. ..-
7. LATH AND/OR WALLBOARD INSPECTION;
Commonly made after all lathing and/or wallboard interioris in placer but before any
plaster is applied, or before wallboard joints and fasteners are gaped and finished.
S. FINAL PLUMBING AND HEATING INSPECTION*
All systems in place., fixtures sit, ready for occupancy
9. FINAL ELECTRICAL;
Fixtures and wail covers in place. Directory Completed in panel box.
l0. SIDEWALK INSPECTS:
After forms are set, prior to placing concrete.
1-10 FINAL INSPECTION40
Commonly made after the building is completed and ready for occupancy .
I2. OCCUPANCY PERMIT:
Issued when, an final inspection, building is ready to occupy,
1 3, OTHER INSPECTIONS:
In addition to the caIled inspections above, the building department may make or
. require any other inspecdons to ascertain compliance with this rode and other Laws
enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall past the inspection retard on the fob site in an accessib(e and conspicuous
place to allow the building official to make the required entries. The regard shaIl be maintained by thermit
holder until the final inspection has been mads and approved.
I have read the above and will comply in my requ'ests for inspecdons by giving 24 HOUR NOTICE prior for
-W inspections to be made.
Eiectrica[: b24 -31b7
Plumbing: 359-3C3�"'x 32b or,�3 13 or 359'3034
11Signature.Ais:11111111
Building: 359-3020 ex 326 or 313
Date:`
COMMUNICATION LOG