Loading...
HomeMy WebLinkAboutREVIEWS & RESPONSES - 99-00030 - Ricks College - Vehicle StoragenucE F F - T tr ctor Physical Plant Department Rexburg, ID 85460-8 20856-2451 356-1490 rostc@ri cks. e August 27, 1999 Rose Bailey City of Rexburg 12 N. Center Rexburg, ID 8.3440 Dear Rase: Attachedis the fallow -up data for the proposed Vehicle Storage Building�ncludxng: 1. 2 sets of architectural drawings, cover sheet, site plan, floor flan, building section and exterior elevations. 2. Typed response to original review comments. I do not have a copy of the original review comments from your office. The Master Plan is the sane as used for the Hazardous Materials Management structure. Following are the responses to the revise comments received today: I . Plot Flan - included with subm-Ittal noted above. 2. Foundation Pian - The foundation pian will be provided by Teton West construction. Depth to final grade is shaven on the exterior elevations. Final grade may vary based on lava rack depth at south easy corner. Exterior elevations are included in the submittal. 4. Truss'Details - No wood trusses are used. I am also �ncluding the paper work required for a building permit. please contact me. If you have any questions, VEHICLE STORAGE BUILDING Comment Comment Response Number 10 Provide complete site pian. complied 12* Provide complete foundation pian. The foundation will be designed by the successful bidder. tach building supplier has a different set of loadings and designs which will nuffify any design word at this t4ne. The Contractor is required to submit plans and calculations to the City of Rexburg Building Department prior to obtaining a Buildmg Permit. See Note 1, Sheet A- 3. Provide Steel detail pians of the structure. See response to Comment 2. 4, Provide electrical and mechanical plans. See Addendum # 1 MEMMEM& IMEMINNIMMEMIN MEMEM-00" 5. AM pages of the plans must be stamped. Complied to this gage. The Contractor will provide design draw* ngs stamped by and engineer. See Note 1, Sheet A- 1 1.5. Exit Signs 7. All insulation materials including facings are Na insulation 'is planned for required to have aflame-spread..... the building. S. Parking garages required ventilation See Addendum #1 9. Fire Department Continents 9-1 Required Fire Flow No response required. 9-� Water Supply No response requked_ 9-3 Fire Apparatus Access Roads No response required. 9 -4 Access roads and water supply Nov response required. 9-5 Portable fire extinguisher Will Comply, 10# ABC @ each personnel door. 9-6 Automatic Fire E7ctinguishing System No response required. U Y I 4-7 Stand Pipes No response required. 9-g Ventilating Hoods and Duct Fire ExtM'P guishing No response required. System 9-9 Fire Alarm No response required. AmriI23, 1999 Lloyd Bensen Ricks College Physical Plant Building Rexburg, ID 8 3 440 Dear Lloyd While tryi'-ng to review your plans for the Vehicle Storage building, I have identified the following items that need your attention: l.. Please provide a compete site plate. Include all dimensions from building to other buildings on poi and to all property lines and right -of- wayso 2. Provide a complete foundation plane 3. Provide steel detail plans of the structure. 4. Provide electrical and mechanical plans. �. All pages of plan must be stamped by'a ficenced engineer or architect as per 94 SBC Section 106. 6. Exit signs are required as per 94 UBC lection 1013.1 T, All insulations materials �ncluding facings are required to have a flame-spread rating of 25 or fess and a maximum smoke density- of 450 unless it is in a concealed space and the facina is in c��taet with a wall or cezling as per 94 UBS Section 77,3 exc. 2.. $. Parking gaxages require a ventilation system that exhausts 1.5 cfn per sq., ft. of floor area as per 94 UBC Section 1202.2.72 a1st 41 of items that must re addressecl. Dir�c�utiza i Fire has �. The �V�bur� I have a Iftached a copy of that list. Please address these items and I Will iced continue tbLe revi'ew. Thank you fo-.,r, your consideration in these matterLs.., I can be reached at 359-3020 ext., Si' ncire I v Val Christensen Assistant Engineer 9 7,111 IMF P.O. Sox 2 8 0 26 North Center 1994 UnIfo Fixe bode Plan Review Building Name: Plan Date: 04-09-99 Review Dated04ojP,21~90 Ricks College Vehicle --Storage_ Buildin Building Address : ? South Vt fest Stories 0 One Type of Construction V -- Occupancy Classification: 5--3 Existing Floor Area,4 New Construction Floor Area: _8,880 S�t,icr3�'E-' _ f e e t 1) Required Fire Flow (Appendix III -A): 2,500_apm 2) Water Supply (Article 9, Section 903) Required: Yes N/A Fire dramLocatJ-on,: 5th S 1st W*600 E>%* 1st K.J. C t _--'------------------._.'----�'_.._.__`__�_._- T----•.._ _.�__.._ _._.—..ay �... -��-i - � --r-��ti-- .. .'� � -_rte- -�... S-0 Fire Hydrant Flows.: 0 Fire Flow Test Location: 600 5.1"t W -M Firms Flaw Supplied By: Fire Department Other Approved Water Source: N/A dater Supply Acceptable: Yep Filre Hydrant Location Acceptablet Yes 3, ) Fire Apparatus Access heads (Article 9 Section 902). Required Yes Complete Raced Acceptable: Yes 4).Access Roads and dater Supply, Including Fire Hydrants Are Required To Be Installed And Made Serviceable Prior To And During Tine of Construction Article 9 Section 901 a 3 ) : Yes 5),Installation Of Portable Fire Extingui5her (Article 10 Section 1002) RYes Location Acceptable!: Not shown Type Provided Acceptabie: Not Shown Co=ents : Install ode Plan Review Page 2 appropriate wisher within maximum travel distance 6} .Automatic Fire Extinguishing Systems. (Article 10 Section 10D3 Required. No 7).Standpipes Commentse. Based an S-3 occu anc (Article la Section 10Q4) Required: No 8) Ventilating Hood Arid Duct Firms Extinguishing system (Art icle lD Section 1006.2) Required: No 9) .Fire Alarm Systems (Article 10 Section 1007)Requireld,: No Plans As Submitted Are Acceptable,. Yes Plans Checked BY: Dee Owens Rate: 04-21---.,99 Approval is based on S-3 occupancy and installation of proper fire extinguishers. Division 3. division 3 Occupancies shall include repair garages where work is limited to exchange of darts and maintenance requiring no open flame or welding, motor vehicle fuel -dispensing stations, and parking garages not classified as Group S. Division 4 open parking garages or Group U private garages.