August 27, 1999
Rose Bailey
City of Rexburg
12 N. Center
Rexburg, ID 8.3440
Dear Rase:
Attachedis the fallow -up data for the proposed Vehicle Storage Building�ncludxng:
1. 2 sets of architectural drawings, cover sheet, site plan, floor flan, building section
and exterior elevations.
2. Typed response to original review comments.
I do not have a copy of the original review comments from your office. The Master Plan is the
sane as used for the Hazardous Materials Management structure.
Following are the responses to the revise comments received today:
I . Plot Flan - included with subm-Ittal noted above.
2. Foundation Pian - The foundation pian will be provided by Teton West
construction. Depth to final grade is shaven on the exterior elevations. Final
grade may vary based on lava rack depth at south easy corner.
Exterior elevations are included in the submittal.
4. Truss'Details - No wood trusses are used.
I am also �ncluding the paper work required for a building permit.
please contact me.
If you have any questions,
VEHICLE STORAGE BUILDING
Comment Comment Response
Number
10 Provide complete site pian. complied
12* Provide complete foundation pian. The foundation will be
designed by the successful
bidder. tach building
supplier has a different set of
loadings and designs which
will nuffify any design word at
this t4ne. The Contractor is
required to submit plans and
calculations to the City of
Rexburg Building Department
prior to obtaining a Buildmg
Permit. See Note 1, Sheet A-
3.
Provide Steel detail pians of the structure. See response to Comment 2.
4, Provide electrical and mechanical plans. See Addendum # 1
MEMMEM& IMEMINNIMMEMIN MEMEM-00"
5. AM pages of the plans must be stamped. Complied to this gage. The
Contractor will provide
design draw*
ngs stamped by
and engineer. See Note 1,
Sheet A- 1
1.5. Exit Signs
7. All insulation materials including facings are Na insulation 'is planned for
required to have aflame-spread..... the building.
S. Parking garages required ventilation See Addendum #1
9.
Fire Department Continents
9-1 Required Fire Flow No response required.
9-� Water Supply No response requked_
9-3 Fire Apparatus Access Roads No response required.
9 -4 Access roads and water supply Nov response required.
9-5 Portable fire extinguisher Will Comply, 10# ABC @
each personnel door.
9-6 Automatic Fire E7ctinguishing System No response required.
U Y I
4-7 Stand Pipes No response required.
9-g Ventilating Hoods and Duct Fire ExtM'P
guishing No response required.
System
9-9 Fire Alarm
No response required.
AmriI23, 1999
Lloyd Bensen
Ricks College Physical Plant Building
Rexburg, ID 8 3 440
Dear Lloyd
While tryi'-ng to review your plans for the Vehicle Storage building, I have identified the
following items that need your attention:
l..
Please provide a compete site plate. Include all dimensions from building to other
buildings on poi and to all property lines and right -of- wayso
2. Provide a complete foundation plane
3. Provide steel detail plans of the structure.
4. Provide electrical and mechanical plans.
�.
All pages of plan must be stamped by'a ficenced engineer or architect as per 94
SBC Section 106.
6. Exit signs are required as per 94 UBC lection 1013.1
T, All insulations
materials
�ncluding facings
are required to
have a
flame-spread
rating of 25 or
fess and a
maximum smoke
density- of 450
unless
it is in
a
concealed space and the facina is in c��taet with a wall or cezling as per 94 UBS
Section 77,3 exc. 2..
$. Parking gaxages require a ventilation system that exhausts 1.5 cfn per sq., ft. of
floor area as per 94 UBC Section 1202.2.72
a1st
41 of items that must re addressecl.
Dir�c�utiza i
Fire has
�. The �V�bur�
I have a Iftached a copy of that list.
Please address these items and I Will iced continue tbLe revi'ew. Thank you fo-.,r,
your consideration in these matterLs.., I can be reached at 359-3020 ext.,
Si' ncire I v
Val Christensen
Assistant Engineer
9
7,111 IMF
P.O. Sox 2 8 0
26 North Center
1994 UnIfo Fixe bode
Plan Review
Building Name:
Plan Date: 04-09-99
Review Dated04ojP,21~90
Ricks College Vehicle --Storage_ Buildin
Building Address : ? South Vt fest
Stories 0 One
Type of Construction V --
Occupancy Classification: 5--3 Existing Floor Area,4
New Construction Floor Area: _8,880 S�t,icr3�'E-' _ f e e t
1) Required Fire Flow (Appendix III -A): 2,500_apm
2) Water Supply (Article 9, Section 903) Required: Yes
N/A
Fire dramLocatJ-on,: 5th S 1st W*600 E>%* 1st K.J. C
t
_--'------------------._.'----�'_.._.__`__�_._- T----•.._ _.�__.._ _._.—..ay �... -��-i - � --r-��ti-- .. .'� � -_rte- -�...
S-0
Fire Hydrant Flows.: 0 Fire Flow Test Location: 600 5.1"t W -M
Firms Flaw Supplied By: Fire Department
Other Approved Water Source: N/A dater Supply Acceptable: Yep
Filre Hydrant Location Acceptablet Yes
3, ) Fire Apparatus Access
heads (Article
9 Section
902).
Required Yes
Complete Raced
Acceptable:
Yes
4).Access Roads and dater Supply, Including Fire Hydrants Are
Required To Be Installed And Made Serviceable Prior To And During
Tine of Construction Article 9 Section 901 a 3 ) : Yes
5),Installation Of Portable Fire Extingui5her (Article 10 Section
1002)
RYes
Location
Acceptable!: Not
shown
Type
Provided Acceptabie:
Not Shown
Co=ents :
Install
ode
Plan Review
Page 2
appropriate
wisher within maximum travel distance
6} .Automatic Fire Extinguishing Systems. (Article 10 Section 10D3
Required. No
7).Standpipes
Commentse. Based an S-3 occu anc
(Article la Section 10Q4) Required: No
8) Ventilating Hood Arid Duct Firms Extinguishing system (Art icle lD
Section 1006.2) Required: No
9) .Fire Alarm Systems (Article 10 Section 1007)Requireld,: No
Plans As Submitted Are Acceptable,. Yes
Plans
Checked BY: Dee Owens
Rate: 04-21---.,99
Approval is based on S-3 occupancy and installation of proper fire
extinguishers.
Division 3. division 3 Occupancies shall include repair garages
where work is limited to exchange of darts and maintenance
requiring no open flame or welding, motor vehicle fuel -dispensing
stations, and parking garages not classified as Group S. Division
4 open parking garages or Group U private garages.