HomeMy WebLinkAboutCONCRETE RESULTS - 99-00022 - Nauvoo Apts - Phase 2HARPER - LEAV ENGINEERING, INC.
t 985 N Capiiat Ave.
P. 0. BO.i &*91
Idaho Falls, ldcrha 8.345
{208) 524-(3212 fax 524-0229
TO
El
75
GENTLEMEN:
— WE ARE SENDING YOU (Attached
ya ❑ P n* W1. S
E] Copy of letter [I Change order
0
LETTER OF TRANSMITTAL
Q Under separate cover via the following Mems:
an s
Reports
Lj Specif"Icabohs
THESE ARE TRANSMITTED as checked below:
For approva#
For your use
MEMO
p As requested
D Approved as submitted
D Approved as Hated
7i Returned for corrections
D Resubmit copies for approval
C1 Submit ccP ies for distribution
El Return � corrected prints
17,1 For review and comment 11
E] FORBIDS [DUE 19 ❑ PRINTS R URNED AFTER LOAN TO US
REMARKS
t
COPY TO
i6V� SIGNED:
HARPER LEAVITT ENGINEERING, INC.
PROFESSIONAL ENGLNEERS & LAND SURVEYORS
985 N. Capital Ave.
Idaho Falls, Idaho 83405
(208) 524-0212
DATA ON:
CONCRETE FIELD & LAB REPORT
X CONCRETE 11 MORTAR El GROUT
FIELD TEST DATA
U
800 W. Judicial St.
Blackfoot, Idaho 83221
(208)785-2977
❑ OTHER
(ASTM C172,CI43,C231)
JOB NAME& LOCATION:
Nauvoo,, LLC
70B NO.:
99505
CONTRACTOR:
shi"ppen Bro.
CAST BY:
W.W.
DATE CAST:
9-9-99
SiJPPLIER:
Walters Readi
Mix
TRUCK NO.:
W-24
MIX NO.:
4,000 psi
TICKET NO.:
6094
START:
10w-48 a.m.
STRUCTURE:
Apt. b1d.
FINISH:
PLACEMENT LOCATION:
Bldg. #3 -south 2 apt., slab floor
CONCRETE TEMP:
6,90
AIR TEMP:
73°
PERCENT AIR:
6.4%
SLUMP.-
53/4 "
COMMENTS:
A
B'
E°
Co
Y_- i� 9usd
�
��i+ �,
�Y'L�l VJrLiriL
FAIL
r
Tested by -"
Checked by:
or