HomeMy WebLinkAboutFLOOR PLAN - 99-00021 - Ricks College - Cinder StorageNOTE I
241
41 NOTE G
NOTE 3
NOTE 2
NOTE 4
FLOOR PLAN
SCALE: 1/8" = P -O"
REVISIONS:
NOTES:
1. INSTALL NEW CONCRETE SLAB WITH W COMPACTED ROAD BASE, 4' LAYER OP 3/4' WASHED GRAVEL
COMPACTED, AND G' CONCRETE SLAB WITH #4 BARS ®12' O.C. BOTH WAYS. DOWEL INTO FOUNDATION WALL
W/ #8 BARS ® 8' D.C.
2. INCLUDE 10 APRON WITH CONCRETE SLAB OF SAME CONSTRUCTION. LV
3. INSTALL NEW 12' CONCRETE WALLS WITH 2 MAT5 #8 BAR ® 8' O.C. BOTH WAYS, INSTALL Ill' X 10' } C9
ANCHOR BOLTS IN FOUNDATION WALL ® 48' O.C. to � XL
4. MOVE EXISTING STRUCTURE TO NEW LOCATION AND ATTACH TO NEW FOUNDATION. p O
5. INSTALL FILL AS REQUIRED FOR SCOPE.
G. INSTALL 8' X I G' FOOTING WITH 2 - #4 CONTINUOUS. U U_
0.
EXIST. SHELL RELOCATED BY OWNER
a=
24'
II
NEW CONC. FOUNDATION
NOTE 5
z
0
LuQ
CD �
9D
00
no
OC z
Lu
z
U to
21
C----------------� u_
BEAR ON SIMILAR
MATERIALS FULL LENGTH U :r
FIN15H GRADE OF FOUNDATION si
ELEVATION
SCALE: 114" = P-0" ryT_
WALLS AND ROOF OF EXIST. BUILDING WILL BE MOVED BY OWNER.
CONTRACTOR WILL PROVIDE FOOTING AND FOUNDATION ONLY.
PROJECT #:
PPLT-00G
SHEET I