HomeMy WebLinkAboutDESIGN CALCS - 99-00004 - Valley Wide - CanopyDesign Calculations
structural Steel Canopy
Valley Co=op Cenex Station
Rexburg-, Idaho
Supplied by:
Kustom Kanopies, Inc.
2789 Midland Dr.
Ogden, UT 84401
z
Designed by..
Mountain View Engineering, Inc.
P.O. Box 839
Brigham City, UT 84302
James O. Moore, P.E.
PR
'04
5 pages of calculations
APPROVED .WAG
TIE
0
Mountain View Engineering Page:
P.O. Box 839, Brigham City, Utah 84302 Date.
Phone (435)734-9700 Fax. (435)734-95'!9 By:
Job:
Subject:
DESIGN CRITERIA
SL -
DL =
Seismic bane =
Wind Speed
Exposure =
Kustom Kanopies #2258
Delius Yarber (Valley Co -"op) Cenex Station, Rexburg, ID
CANOPY DIMENSIONS
Length =
Width =
Fascia Height
Canopy Clear Height
Tatar Height of Canopy =
Number of Column Rows
Number of Columns/Row
LATERAL
Wind
Ce =
Cq =
qS
iW �-
Pw =
Total Base Shear (V)
Seismic
Ca
W
ULT
Total
Base
Shear
(1/) =
ASD
Total
Base
Shear
{V}
ULT Lateral Load Each Column
}SSU Late'ral Lead Each Column
Distance From Base
FOOTINGS (per UBC 18.8.2.2)
Allowable Soil Pressure
Max. Vertical Column load =
Existing Length
Existing Width
Req., Depth (see ENERCALC)
Actual Depth =
q (actual) =
q (allowable)
1500
psf
CONTINUOUS PURLiN LAYOUT
kip
4.5
35
psf
Purlin Spacing =
6.67
ft
10
psf
Edge Distance Each Side =
2
ft
3
Left Cantilever =
9
ft
SQ
mph
1 Bay(s) @
18
ft
C
Right Cantilever =
g
ft
w (DL) =
0.067
k1f
w (LL) =
0-233
k1f
36
ft
From Page 3, Use
WSxl 5
24
ft
3.5
ft
CONTINUOUS BEAM LAYOUT
15
ft
Left Cantilever =
12
ft
18.5
ft
0 Bay(s) @
0
ft
1
Right Cantilever =
12
ft
2
Maximum Tributary Width =
18.00
ft
pl (DL) =
1.21
kip
pl (LL) =
4.19
kip
p2 (DL) =
b.97
kip
1.13
p2 (LL) =
3.35
kip
1.3
From Page 4, Use
W14x22
16.4
psf
1
COLUMN
24.09
psf
Column Specification:
10"x'10"x1
/4" Tube
3.04
kip.
Fy =
46
ksi
Length =
16.75
ft
Moment at Base =
36.09
kip -K'
D.36
S (required) =
15-619
in^3
2.9
S (actual) =
30.1
in A 3
16.2
kap
Unity Check (See Pages 6&7) =
0.77
OK
6.Q3
kip
4.31
kip
ANCHOR
BOLTS
(AISC
A-36)
Diameter=
i.00
in
3.02
kip
Use existing (4) bolts and add (4)
additional
bolts
2.15
kip
epoxied in place between existing bolts. See
16.75
fl
pages 8 & 9.
1500
psf
19.44
kip
4.5
ft
4.5
ft
4.61
ft
6.50
ft
1935
psf
3150
psf
_41 ZE,
19t "AAkllh
EIYCiIlYEERIlNG, INC*
P.O. Box 839 *Brigham Ciry, Utah 84302
Phone (435) 734-9700 e Fax. (435) 734--9719
Job KK �/frGG.f}�
Subject L/k
60010p. I'D
.1
i
N
N
Page.��
Date
MOUNTAIN VIEW ENGINEERING, INC.
P.O. Box 839
Brigham City, Utah 84302
Phone (801)'734-9700
Fax (801) 734-9519
U
R10 -r. 51CM1
Description
Purl'in
F e r
Title: Fueling Canopy Job # 2258
Dsgnr. Paul Date; 11:57AM, 2 DEC 98
Descripfw a r (Valley -off) -Cenex
Rexburg, Idaho
Scope .
Multi -Span Steel Beam
F - Yield mess 50.00 ksj Load Duration Factor . 1.00
Spam Considered Continuous Over Supports
Span Information
Loads
Live Load Used This Span ? Yes Yes Yes
Dead Load k/ft 1 0.067 _067 0.067
Live Load''ff l 0.233 0.233 0.233
F&. -3
Results -�
Mrnax r[b Critr
QX=
Max Gda Left Encs
Max @ Right Encs
#b :Awa!
Fb : AJIo►nrable
fv AcNal
Fv AJfowab
A.
ft
ftp
T
PSI
psi
psi
Reactions & Deflections
Shear @ Left
Shear @ Right
Reactions.,_
DL a Left
LL @ i.e€t
Total (§ Lift
DL @ Right
LL @ Right
Total Q Right
Max. aeflecton
@ X =
SpanlDeflec#ion Rato
r
P7- dm�
.9, (LL) A;.-
0.00
0.00
0.00
-12.15
12,317.1
33,000.0
Se*di"
11,358.9
X1,000.0
kear O
0.00
9.00
-12_-5
-12.15
129317.1
1 *327 ,
Sead7mq O
1 1358.9
1000.0
hewn O
_00
0,00
-12.1
0.00
127317.1
33 oowo
Btading OK
19358.9
0,7000.0
t*r O
0.00 2.70 2.70
kj 2.70 2.70 0.00
0.00 1..21 1.21
kj 0.00 4.19 4,19
0.00 5A0 5.40
1.1 1,21 0.00
4.19 4.1 0.00
5.40 5.40 0.00.
j-0-713 0.1 02 10.71
f 9.00 9.00
+
151.5 1120_9 151.5
I
coo
1983-98 ENERCALC
c:\98project\kkanopiesVexburgcenex:Calculat
IOW -0602479, Ver 5.0.5,15 -Mar -1 998, W
Span
1 &OG
9.00
Sal Simon
w8Z 15
W$x15
WOZ15.
End Fbdty
Fret -Pin
pin -pi -ft
Pin -Fret
Untraced Lente
ft
1.00
9.00
1.00
Loads
Live Load Used This Span ? Yes Yes Yes
Dead Load k/ft 1 0.067 _067 0.067
Live Load''ff l 0.233 0.233 0.233
F&. -3
Results -�
Mrnax r[b Critr
QX=
Max Gda Left Encs
Max @ Right Encs
#b :Awa!
Fb : AJIo►nrable
fv AcNal
Fv AJfowab
A.
ft
ftp
T
PSI
psi
psi
Reactions & Deflections
Shear @ Left
Shear @ Right
Reactions.,_
DL a Left
LL @ i.e€t
Total (§ Lift
DL @ Right
LL @ Right
Total Q Right
Max. aeflecton
@ X =
SpanlDeflec#ion Rato
r
P7- dm�
.9, (LL) A;.-
0.00
0.00
0.00
-12.15
12,317.1
33,000.0
Se*di"
11,358.9
X1,000.0
kear O
0.00
9.00
-12_-5
-12.15
129317.1
1 *327 ,
Sead7mq O
1 1358.9
1000.0
hewn O
_00
0,00
-12.1
0.00
127317.1
33 oowo
Btading OK
19358.9
0,7000.0
t*r O
0.00 2.70 2.70
kj 2.70 2.70 0.00
0.00 1..21 1.21
kj 0.00 4.19 4,19
0.00 5A0 5.40
1.1 1,21 0.00
4.19 4.1 0.00
5.40 5.40 0.00.
j-0-713 0.1 02 10.71
f 9.00 9.00
+
151.5 1120_9 151.5
I
coo
1983-98 ENERCALC
c:\98project\kkanopiesVexburgcenex:Calculat
IOW -0602479, Ver 5.0.5,15 -Mar -1 998, W
MOUNTAIN VIEW ENGINEERING, INC.
P.O. Box 839
Brigham City, Utah 84302
Tide: Fueling Canopy Job 258
Paul Date; 11: 54
Description � Deffus Yarber (Valley Co-op) n
Rexburg, Idaho
Phone (801) 734-970D Scope
fax (801) 734-9519
qcr: SS6d07 Steel Beam Design
Descniption.9 &
Beam
Gia
Steel SecHon : VI['t 4X.22
Center Span 12.00 ft
Left Cant, 0-00 ft
Right Cant 0-00
Lu F Untraced Lente 6.67 ft
' Point Loads
s
Dead Load
Live Load
Short Farm
Location
Summary
1,210 0.970.
4.190 3.350
3.330 10.000
y
End b* � Fixed -Free, Lu = 6.67ft, LD F 7 1.000
—Actual
Moment
fb : Bending Suess
Shear
Shear Stress
fv IF
Force & Stress Summary
Fixed -Free
1 � 1 -ft
25.346 ksi
0.952 :1
9.720
3.0 76 I
0.154
LL & ST Act Together
Allowable
fi4_291 k -ft
26.634 ksi
F
Load Duration Factor
Elastic Modulus
1.00
29,000.Oksi
_.._. Beam OK
Max_ Deflection
Length/DL Deft
E.ength!(DL+LL Deft)
-0.658 i
1 p
949.4 :
o:
437.,6 : 1
These columns are Dead + Live Loyd placed as noted —
Fa l:d per 1o,, C
(c) 1983-98 ENERCALC
;prj1aiUTe:alult -0602479 r Ver 5.0.5# 15-M ar- 1 r Win 32
CSL
LL
LL+ST
LL
LL+T
Maximum
Center
�LCenter_
Cants
nts
Max. M +
61.18 k -ft
-f t
Max. M -
-13.73
-61-18
Max. M @ Left
k -ft
Max.. M @ Right
Shear g .eft
9.72 k
2.18.
Shear (§ Right
k
k
Center Deft.
-0.658 in
-0.148
-0.658
-0.658
0.000
0.000
in
Left Cant DO
0'. 000 in
0,000
0.000
0.00
0.000
0.000
in
Right Cant DO
0.000 in
0-000
0.000
0.000
0.000
0.000
in
:._Query Deft (M
0_
0.000
0.000
0.000
0-000
0.000
in
Reaction @ Left
9.72
2AS
912
972.
Reaction ( Rt
Fa l:d per 1o,, C
(c) 1983-98 ENERCALC
;prj1aiUTe:alult -0602479 r Ver 5.0.5# 15-M ar- 1 r Win 32
MOUNTAIN VIEW ENGINEERING., INC.,
P.O. Box 839
Brigham City, Utah 84302
Tim 4 Fuefinancpy
]Dsgnr: Paul
Job b
It a + # 26 ` D EC 9
rion _ H er (Valley p) Cane
Rexburg, Idaho
Phone (801)'734-9700 scope:
Fax (801) 734-9519
Pole Embedment in Soil
Description Embed Depth
General Info ation
Aflow Passi'v'e
Max Passive
Load duration factor
Pole. is Rectangular
Width
Restrained Q Surface
Summary
150.00 pcf
1500, 00 PCf
1.330
Moments @ Surface,,.,
Point load 50t585.00 ft-#
itut load 0.00
Without Surface Restraint...
Required Depth 0.000 t
Press @ 1.13 Embed....
Actual 0.00 int
Allowable 0. 0 0 psi
Applied Loads...
Point Load
distance from base
Dista bated Load
dJstance to top
distant to bottom
Total Moment
Total Lateral
With Surface j"t.,
iDepth
Pressure g Base...
Adel
Allowable
Surface Restraint Force
lbs
16.750 ft
0
0.000 ft
.00th ft
585.
3,020.00 lbs
5.347 ft
f
1}066.68 psi
13,431.38 lbs
1983-98 AL-.� pro \ a n o i u r cww l ul t 0 4 _r �-
---
MOUNTA VIIEW
ENGMERING INC.
Y.U� Box 83!�' Brigham Ciry, Utah 84JO2
Phone (435) 734-97017 -v Fax- (435) 734-95190
CDLUMniS
P�ieat�rY = t
- 1 4-0 � 4 - 9 � i el
I f
1144 4--
K FT
SOW k.
pop 11�44
LX- C.yt Lc
Jib_h� �'_ t� -Bob.
Subject,
G,q-S &.4
P",V-t 145, 1 L I,--
1) -� s *+-
x{33, 1
Pz��, r 44 :� 7,
1 i J
7`
A�LL CR4 9-(z L.a+,4-p X65 Bja" tom.`( RNs?GLT/oni
i
Date.
By-'a4�-4 -.I..
CAST—UTIL 1 TY Bv, CAST I NCv
0 : � 9 : . ' ' AGE3% -1 * I M E
SUMMARY OF THE 'INPUT NFO T I
TYPE OF THE PROBLEM m AISC CODEK FOR T 10 '
* Cb
Yield i5ng
Stress
L 1
�.
* Cm x
(Fo r m tsl
a 1.
6— 1
is
46
KS
1.
Maximum Axial
member.
Force
—19. 44
KIP
Effective
Length
in major
axis
201
1 NCH
EffectJLve
Length
Fac
Effective
Le
i
r
axis
L.0 I
I 1'4 -CH
Effective
Length
Factor(minor)
2m
Maximum
AX 'is
Bsnd ing
Moment
4 3 %*3 1.
KIP -INCH
n y� ced
Length
(Comp.
flange)
20 1
1 NCH
Maximijm Minor
AxI5
BeTid ,no
MoffleD4-
0
KIP—INCH
Shear act
ing
in I
oc_-al Y
0
KIPS
Shear acting
in local
X
MS
141
KIP
Factor of
Safty
(for
membev---
sizing)
;
1
* Cb
(Section
F1.3)
L 1
�.
* Cm x
(Fo r m tsl
a 1.
6— 1
is
* Cmy
(Formula
1.
6-1a)
member.
* The
web
n
L 1
flange
this L b a rte.. j_W i UUS l. connected.
* This
is
not
a
Hyby-%id
member.
N
3f• # 3F # �3F •� �4• � 3F �E �F �)f- � � �if- � -� # -iE� �E° 3i� -3� -�F -k� '�r � �F �i�- � � -3� if- iE� # �iE �F -}E �4- iF• -3� iF �E � �E--3E � -li� -3�F �F � �ii-3E �3i� � �3E�3#� �f° # �E #
SECTION TO LSE CHECKED TSIOXIOXI/4
�--��•���-�-�-����-����€�-�����-���-�-�-��a€�a���a���a�at-�����-�a��-�-���a�a��-�-���-sic-�-��
***** SUMMARY *****
ECT ION TSIOX10XI/4
2. 0 2 _77 Fbx
.4,r 0
INTERACTION FORMULA
14.389 F6y
27.600 Fby- allow
RAT I
0 a
0
.0 05001
x. 7717
r.u.. -box 839 * Drignam City, .jraj 843u.L
Phone (435) 754-9700 0 Fax. (435) 734-9519
pis t 60A)
�- Tp- - " 6H& �, -r 4
m
Subject
`7 &OV5 6,0 Aote
0
tm
s�c-rcon< � `1�3. z
UW_= 5H, CW Zp '. FS.4: 34w E�x-7s 46 L
� 8ac is Q = '�� �I�z � d. 7S5 /n!y
lop,, lop, 11571.1111V
/<
44v
i
Page
Date /2'2"�f�
gy F4 __
W-1
mow
�A'7 AAPIA
F os, cc'
21 A
„tri �1►67`��'� 1�V i�l.S���,
2 JIB`' �i�i P��SSlc�r1.:
c� 1, vS k F Ir
VLj
�15�= o• 757 C. 7g
OWL -
A -1) D
4# 7k
—LOP
OAr-,l
1-bri
44 64 (op4 K.
5'"`Z��sB�o�s�� � 3��5 k
C�,si k Z
'
A -,DD 17-1 O&J,+t,
ApEofto
RL,
0' 7-
JIM
F�4 FT
,;7
MOUNT-ALlN VIEW
If `1 NCe
P.O. BCity, ox 839 a Brigham Utah 8,4302
* FaX. 4
Phone (435) �3�-9?4(�(435") 73 "-9519
.4 VOW,
M- Olt 6
v��T— JeA/ 7AN-s: 1,0W
Py eArm. fD
�} �X�S'�IN�
BO L`�
71wstoov
�z) 8oL'tS .ALT
115-S�tM�
qwmp
13+
t(L�
;/.4t,�.5 Y ca -o P
OF
R
,
jFv4
v
---r
G s re-f-%rQ
�F PTl-f�
siv it -Cm I-, Z�
I ::rl q I LA ezl
irs:
al
0
Page .Cf
.R,v
Date I��'�
By--�FAU--
SSc-tuv./
-7p-,WA&AT-s�b
12, A00vZ
�t
c��� = O,Gs ��.o�i`�)��1/� 2sao = 50.83 1Gsl � Pic-y�.,�'`
wpm
O,loS
�j�/c. - ��o�i.?�yS'��f-o�
3t:o�� �3t
pr pol qw k
-I.-