Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00036 - 115 S 2nd E - Lean-To - Storage UnitsI . CITY OF Rr`-w]XFBURG BUILDING INSPECTION SEQUENCE Type of Inspections* For on-site eonstnuction, from time to time the �u�iding official , Pon not�ficatian from the permit holder or his agent, sha�� make or cau,�e tv be rr��de any necessary ianspect�o�s and shalt either approve that portion of the Construction as completed yr s�al� notify the Pern�it holder or his agent wherein the same fails to comply with this cvde. 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation: 2. FOOTINGe. Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing in place., vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection Shall included' excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. All fomisand reinforcing steed, etc,, shall be in place. 4,, PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior tocovering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: inspections of trusses to see theymeet shop drawing requirements and that they are installed and braced adequately. b. FRAME AND MASC)NRY INSPECTION: Commonly made after the roof, masonry, aII framing, firestopping, draftstolviong and bracing are in place and after the p�umb�ng, mechanical and electrical rough inspections are approved, 70 LATH AND/OR WALLBOARD INSPZCTIaN: Commonly made after all lathing and/or wallboard interior is in place. but before- any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING ARID HEATING INSPECTION: All systems in place., fixtures set, ready for occupancy 9. FINAL ELECTRICAL: Fixtures and wail covers in place. Directory completed in panel box., 10. SINSPECTS; Ater forms are set, prior to placing concrete. l I. FINAL INSPECTION: 12. commonly made after the building is completed and ready for vcc�pancoccupancy . OCCUPANCY PERMIT., Issued when, on final 13-9 OTHER INSLPECTIONSinspection, building is ready to occupy. : In addition to the called inspectionSr above, the building department may make or , require any other inspections to ascertain compliance with this cede and other Laws enforced by the building department, The permit. holder or hisagent shall post theI inspectionECT[ON CARD record on the job site in an accessibie and conspicuous place to allow the building official to make the required entries. The record shall be maintained by theholder until the final inspection has been made and a permit have read the above and w1ii comply in my requests for inspections bygivin p24 HOUR � NOTICE prior for inspecdons to be made. Electrical: 624-3767 PlumNing.-Building: 359-3a20 est 32b ex car 31 3:. or 3.59-3434 or 313 Signature,. Ile.`�' Date: 3