Loading...
HomeMy WebLinkAboutMULT DOCS - 00-00032 - Madison High School - New Athletic BuildingBRUCE SUTHERLAND umoA FOSE BAGLEY CLERK RICHARD HORNER TREASURER A FINANCIAL OrF10ER October 51, 1999 M.W. Burgener Designer for Madison High School Rexburg, ID Dear Mr. Burgener STATE of IDAHO P.O. sox 280 12 NORTH CENTER STREET RF.XSiJ€iG, IDAHO 83440 PHONE (208) 359-3020 FAX (208) 359-342 I have identified the following items that you need to add o� change m your drawings in. oder for us to issue the school a building permit. I . Prorvide Waal Sections a) Identify which walls are metal and which are wood. b) Shaw connections from metal frame to wood frame. C) Show 1 hoax fire, gated construction under intenor star-s. �} .Shave two layers of 518" TypeX sheetrock at bottom of sair stringers for ceiling, Show 5l$" Type X sheetrock on both sides of interior walls. 111) Show 2 layers of 5/8" shee-irock an inside of ext 4' wall. d) Show detail of hew urge steed columnor bents are being encased or how wood framing and drywall connects. 2. Provide ��teIF 0 ��stairway and door at backwall of wresting room as per UBC Section 1003.5. Provide stairway details. 3. Show Corridor Details a) Corridor muss be 6 feet Davide as per UBC Section 10 17,5. b) Show corridor 1 fir. fire rated details. Show 2 layers 5/S" Type X sheetrock on ceiling. Show Sly" Type X sheetrock on both sides of wa11s. Show fire r-ated doors as per UBC Sect -ion 1005.7. A. 1`Torrna�Iy a sprix�k�er system as per UBC Section 904.2-4.1 �s required for all E 1 ocA�upancies, however, we have decided not require the system as per exception #2 of said Section. Remove the usa-kte space under �tair� as ped` U$� Se�t�on 904-2.4._-:'). Unless you are planning an installi-ng sprinklers. 5. dhow Fire Alarm System as per UBC Section 3X5.9. 6. Show exterior door from-weght roam to ou�sid� as per UBS Section 100.3.5. 7. Identify Panic Hardware at,doors from weight room to outside,, from weight room to multi-purpose room, from docker room to weight xoain, from docker room to corridor, from corridor to outside, from multi purpose room to outside and from wrestling room to balcony as per UB C Section 10 1.7. 11. 8. Show exits where two are required (weight room., locker roam, mu1t� purpose room and wrestling xoom) with a minimum sepffatiQn that is Y2the maximum diagonal of the areaserved by the exits. 9. Provide interior stairway details which include rise, run, handrail dimensions and handrail details. 10. Astairs mirumum width for this building is 5 feel as per UBC Section 1017,8. 11. thaw venti�ai�on details as per UBC Section 1202.2 1. I2. Show exit signs at all exits in rooms required to have 2 exits room , mul.t� purpose room and wrestling room} as per UBC. occupancy signs at main exits for these rooms, 13. Provide manufactures literature for TJ1 joists, (weight roam, locker Alio shove 14. Provide stamped drawings by an engineer for the foundation drawings by Teton West. Provide engineer stamp for interior foundation drawing, Please make these changes and get neve prints to me so I can continue the review. Thank you for your consideration in these natters. If you have any questions, I can be reached at 359. 3020 exp. 314. SM*cerely, 4 Val Christensen Assistant Engineer CITY OE REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building vfflcial, upon notification from the pennit holder or his agent, shall make or cause to, be made any necessary inspections and shat[ ether approve tilat pordon of the construction as completed or sha�I notify the pennit holder or his agent wherein the same falls to comply with this code. � . LR r u u I*' Lot comers staked, staking in place for building, prior to excavation: 9 POr)TlMr.. rnmm^ni A 4r% Numb vi wets due seL or uencnes orVasement areas are excavated. Fom and horizontal reinforcing in pace, vertical reinforcing gut and an job site or tied in place. 3. FOUNDATION INSPECTION, -W The foundation inspection shall included excavations dor thickened Nabs intended for the support of bearing walls, pard'dons, structural supports� or equipment and special requirements for wood foundations. Al[ forms and reinforcing steel, etc., shall be in place., 4. PLUMBING, MECHANICAL ASVD ELECTRICAL 0 Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: inspections of trusses to see they meet shop drawing requirements and that they are installed and braced adequately. 6, FRAME AND MASONRY INSPECTIONO Commonly made after the rare, masonry, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and eiectricaI rough inspections are approved. .. 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are gaped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: AIS systems in place, fixtures set, ready for occupancy 9. FINAL ELECTRICAL: Fixtures and wall covers in place. Directory completed in pate[ box. 10. SINSPECTS: After farms are set, prior to placing concrete. I]. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 12. OCCUPANCY PERMIT.4 Issued when, on final inspection, buildingis ready to occupy. 13. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or . require any ether inspections to ascertain cvmp11 0 ance with this cede and other Taws enforced by the building department. INSPECTION CARD The permit balder or his agent shall past the inspecdvn record vn the job site in an accessible and conspicuous place to allow the build ing o�'fi��ai to make t,�e required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICEpnork. inspecdons tv be made. tiectrl �al: b�24-3�f 7 Plumbing: 359-3020ex 3FN Z AM% 2b r 313 or -3x34 Signature: " 4 Building., 359-3020 ex 326 or 313 Date: FORSG- REN ASSOCIATES, INC. 09/28/99 09:21 622-0366 (Raw, 1192) FAX 356 9032 REXBURG S.C. REQUEST FOR ELECTRICAL SERVICE INFORMATION FROM ARCHITECT/EN GIN E ERICONTRACTO R Mr, AIC�i�sc���gi�ao�rGo�l��o► 2001/001 Utah Power Use On1y .Jab OrderAQUnt I' � ' Pieasa submit this form for each building to be sanred by Utah Ps3wgrf�rwh�� you �r� preparing �lact�Ca1 di�s�gn, speeficat�o�s, and- plans. With this requested data, Utah Power w1I1 reply to you, giving necessary elecricai sgcvica IL for You IQ c�Fr,pteta your diISign. 80ding., 14I�-f ;C/qVCC' , T�+ LG! i fG C -wt IL 0r A.1 C7 Location,� � � � AS T— �. `� 1\.i p a T�! CKY:��`�c� r�G�� State : .7. jO Apwox. (loot area of building., 000 , � T II building is an apartment, number of units Anticipated date building to be ready for permanent electric sar+rices DESCRIPTION OF ELECTRICAL LOADS Now Equipment Connected Load (kW) Except Motors I Single Pha:sv Three Pham fighting � �okin� Assist. Evac. Heat MENNEN Computers WaterHeating Elec. Snow Malt Convenience Outlets I (P Work Processors MIN Tatar New � Excapt 14 Connected Motors lr'.00� N�rr Mors singia Phases Thr" Phase [annociod Laid Na. HP Na. lip To, HVACI Motors a Total Refrigeration � 2". Motors Total ether Motors Total AN New Motors 7' � Singin phase 'Three Phase Largest Wtor KP smawo lip slarung kVA or icYA or Cod* Cods Now (kWWod in Wrwe) � Existing WsdUdad In Waw) Existing Total Connecled Load IncludinvMeter Single Phase Three Phase kW SERVICE DESIRED FROM UTAH POWER Transformers lo be supplied by: Utah Power A Customer L} Transformers desired, Rad Mounted Preferred Lacat(on(s) of Transform iars(s) In vauk ❑ Pole Mounted D L corLnrcr2 of ,9K./ C.-r:�>i..�c, Customer's service an#ranee conductor: size Iia. of conductors per phase tr t. Conduit Sipe 2 !2- No, of Gondufts � Voltage desired form Utah Power f 2 � 1 �. � � Phase, �..5r 1.1.„C,or_ Secondary service. Underground I� Overhead d Desired location of ssNce to building ` - j�-E7 __ C_ 0 tQ t5-4 Desired Meter Locallons(s Desired location of currentTransform(metering) Addifional information r data required Number of Meters tbrsv phase single phase NOTE: It Projected load for this Taciiily is 1000 kW or greater, a dedicated telephone line w41 be required for metering purposes. Customer steall provide the telephone line installation at his expanse. Once the line is instailed, Utah Power will pay the monthly charges incurroad for line cperatlan and rental Tram the telephone company. Two snis of plat plan showing building and proposed location of service entrance, vault or pad ars attached 13 Ya uf lame V�D N �'l 4 ti�. %. P�.'rz.. Your Company- `2 'k -r`? 0 1” wit: -5- c.�.Y2 G� Address cz- VN'� PER I Please Sped �Y M "or Miscetlaneaus Loads 41 IVAC w Heating, iteltn, Air Conditioning Phone No. Date I f) — 15D ---IT APO At rov"� lop 71