HomeMy WebLinkAboutMULT DOCS - 00-00032 - Madison High School - New Athletic BuildingBRUCE SUTHERLAND
umoA
FOSE BAGLEY
CLERK
RICHARD HORNER
TREASURER A FINANCIAL OrF10ER
October 51, 1999
M.W. Burgener
Designer for
Madison High School
Rexburg, ID
Dear Mr. Burgener
STATE of IDAHO
P.O. sox 280
12 NORTH CENTER STREET
RF.XSiJ€iG, IDAHO 83440
PHONE (208) 359-3020
FAX (208) 359-342
I have identified the following items that you need to add o� change m your drawings in.
oder for us to issue the school a building permit.
I . Prorvide Waal Sections
a) Identify which walls are metal and which are wood.
b) Shaw connections from metal frame to wood frame.
C) Show 1 hoax fire, gated construction under intenor star-s.
�} .Shave two layers of 518" TypeX sheetrock at bottom of sair
stringers for ceiling,
Show 5l$" Type X sheetrock on both sides of interior walls.
111) Show 2 layers of 5/8" shee-irock an inside of ext 4' wall.
d) Show detail of hew urge steed columnor bents are being encased or how
wood framing and drywall connects.
2. Provide ��teIF 0
��stairway and door at backwall of wresting room as per UBC
Section 1003.5. Provide stairway details.
3. Show Corridor Details
a) Corridor muss be 6 feet Davide as per UBC Section 10 17,5.
b) Show corridor 1 fir. fire rated details.
Show 2 layers 5/S" Type X sheetrock on ceiling.
Show Sly" Type X sheetrock on both sides of wa11s.
Show fire r-ated doors as per UBC Sect -ion 1005.7.
A. 1`Torrna�Iy a sprix�k�er system as per UBC Section 904.2-4.1 �s required for all E 1
ocA�upancies, however, we have decided not require the system as per exception
#2 of said Section. Remove the usa-kte space under �tair� as ped` U$� Se�t�on
904-2.4._-:'). Unless you are planning an installi-ng sprinklers.
5. dhow Fire Alarm System as per UBC Section 3X5.9.
6. Show exterior door from-weght roam to ou�sid� as per UBS Section 100.3.5.
7. Identify Panic Hardware at,doors from weight room to outside,, from weight room
to multi-purpose room, from docker room to weight xoain, from docker room to
corridor, from corridor to outside, from multi purpose room to outside and from
wrestling room to balcony as per UB C Section 10 1.7. 11.
8. Show exits where two are required (weight room., locker roam, mu1t� purpose
room and wrestling xoom) with a minimum sepffatiQn that is Y2the maximum
diagonal of the areaserved by the exits.
9. Provide interior stairway details which include rise, run, handrail dimensions and
handrail details.
10. Astairs mirumum width for this building is 5 feel as per UBC Section 1017,8.
11. thaw venti�ai�on details as per UBC Section 1202.2 1.
I2. Show exit signs at all exits in rooms required to have 2 exits
room , mul.t� purpose room and wrestling room} as per UBC.
occupancy signs at main exits for these rooms,
13. Provide manufactures literature for TJ1 joists,
(weight roam, locker
Alio shove
14. Provide stamped drawings by an engineer for the foundation drawings by Teton
West. Provide engineer stamp for interior foundation drawing,
Please make these changes and get neve prints to me so I can continue the review. Thank
you for your consideration in these natters. If you have any questions, I can be reached at 359.
3020 exp. 314.
SM*cerely,
4
Val Christensen
Assistant Engineer
CITY OE REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building vfflcial, upon notification
from the pennit holder or his agent, shall make or cause to, be made any necessary inspections and shat[ ether
approve tilat pordon of the construction as completed or sha�I notify the pennit holder or his agent wherein the
same falls to comply with this code.
� . LR r u u I*'
Lot comers
staked, staking in
place for
building, prior to excavation:
9 POr)TlMr..
rnmm^ni
A 4r%
Numb vi wets due seL or uencnes orVasement areas are
excavated. Fom and horizontal reinforcing in pace, vertical reinforcing gut and an job
site or tied in place.
3. FOUNDATION INSPECTION, -W
The foundation inspection shall included excavations dor thickened Nabs intended for the
support of bearing walls, pard'dons, structural supports� or equipment and special
requirements for wood foundations. Al[ forms and reinforcing steel, etc., shall be in
place.,
4. PLUMBING, MECHANICAL ASVD ELECTRICAL
0
Rough inspection: Commonly made prior to covering or concealment, before fixtures
are set, and prior to framing inspection.
5. TRUSS INSPECTION:
inspections of trusses to see they meet shop drawing requirements and that they are
installed and braced adequately.
6, FRAME AND MASONRY INSPECTIONO
Commonly made after the rare, masonry, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and eiectricaI rough inspections
are approved. ..
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but before any
plaster is applied, or before wallboard joints and fasteners are gaped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
AIS systems in place, fixtures set, ready for occupancy
9. FINAL ELECTRICAL:
Fixtures and wall covers in place. Directory completed in pate[ box.
10. SINSPECTS:
After farms are set, prior to placing concrete.
I]. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
12.
OCCUPANCY PERMIT.4
Issued when, on final inspection, buildingis ready to occupy.
13. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may make or
. require any ether inspections to ascertain cvmp11 0 ance with this cede and other Taws
enforced by the building department.
INSPECTION CARD
The permit balder or his agent shall past the inspecdvn record vn the job site in an accessible and conspicuous
place to allow the build ing o�'fi��ai to make t,�e required entries. The record shall be maintained by the permit
holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICEpnork. inspecdons tv be made.
tiectrl
�al: b�24-3�f 7
Plumbing: 359-3020ex 3FN Z AM%
2b r 313 or -3x34
Signature:
"
4
Building., 359-3020 ex 326 or 313
Date:
FORSG- REN
ASSOCIATES, INC.
09/28/99 09:21
622-0366 (Raw, 1192)
FAX 356 9032
REXBURG S.C.
REQUEST FOR ELECTRICAL SERVICE INFORMATION
FROM ARCHITECT/EN GIN E ERICONTRACTO R
Mr, AIC�i�sc���gi�ao�rGo�l��o►
2001/001
Utah Power Use On1y
.Jab OrderAQUnt I'
�
' Pieasa submit this form for each building to be sanred by Utah Ps3wgrf�rwh�� you �r� preparing �lact�Ca1 di�s�gn, speeficat�o�s, and-
plans. With this requested data, Utah Power w1I1 reply to you, giving necessary elecricai sgcvica IL for You IQ c�Fr,pteta your diISign.
80ding., 14I�-f ;C/qVCC' , T�+ LG! i fG C -wt IL 0r A.1 C7
Location,� � � � AS T— �. `� 1\.i p a T�! CKY:��`�c� r�G�� State : .7. jO
Apwox. (loot area of building., 000 , � T II building is an apartment, number of units
Anticipated date building to be ready for permanent electric sar+rices
DESCRIPTION OF ELECTRICAL LOADS
Now Equipment
Connected Load (kW)
Except Motors I Single Pha:sv Three Pham
fighting
�
�okin�
Assist. Evac. Heat
MENNEN
Computers
WaterHeating
Elec. Snow Malt
Convenience Outlets I (P
Work Processors
MIN
Tatar New � Excapt 14
Connected Motors lr'.00�
N�rr Mors singia Phases Thr" Phase
[annociod Laid Na. HP Na. lip
To, HVACI Motors a
Total Refrigeration � 2".
Motors
Total ether Motors
Total AN New Motors 7' �
Singin phase 'Three Phase
Largest Wtor KP smawo lip slarung
kVA or icYA or
Cod* Cods
Now (kWWod in Wrwe) �
Existing WsdUdad In Waw)
Existing Total Connecled
Load IncludinvMeter Single Phase Three Phase
kW
SERVICE DESIRED FROM UTAH POWER
Transformers lo be supplied by: Utah Power A Customer L}
Transformers desired, Rad Mounted
Preferred Lacat(on(s) of Transform iars(s)
In vauk ❑ Pole Mounted D
L corLnrcr2 of ,9K./ C.-r:�>i..�c,
Customer's service an#ranee conductor: size Iia. of conductors per phase
tr t.
Conduit Sipe 2 !2- No, of Gondufts �
Voltage desired form Utah Power f 2 � 1 �. � � Phase, �..5r 1.1.„C,or_
Secondary service. Underground I� Overhead d
Desired location of ssNce to building ` - j�-E7 __ C_ 0 tQ t5-4
Desired Meter Locallons(s
Desired location of currentTransform(metering)
Addifional information r data required
Number of Meters
tbrsv phase
single phase
NOTE: It Projected load for this Taciiily is 1000 kW or greater, a dedicated telephone line w41 be required for metering
purposes. Customer steall provide the telephone line installation at his expanse. Once the line is instailed, Utah
Power will pay the monthly charges incurroad for line cperatlan and rental Tram the telephone company.
Two snis of plat plan showing building and proposed location of service entrance, vault or pad ars attached 13
Ya uf lame V�D N �'l 4 ti�. %. P�.'rz.. Your Company- `2 'k -r`? 0 1” wit: -5- c.�.Y2 G�
Address cz- VN'�
PER
I Please Sped �Y M "or Miscetlaneaus Loads
41 IVAC w Heating, iteltn, Air Conditioning
Phone No.
Date I f) — 15D ---IT
APO
At
rov"�
lop 71