Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00031 - 74 Ash Ave - Remodel`a^ !3 — • '-7A-®.. L T is . ` ,fi Tyylr"w 7F` WIlA4r, *�,.+ '77 •-rte � '�'•'• 'Te�a`ygi '. �—Vii--ar ��l4•!1'n-a=. T'�F j�e q e.4 CITY OF RtXBURG BUILDING INSPECTION SEQUENCE hype of Inspecdons-9 For on-site cvnstr-ucdon, from time to Mme the building offrc�ai, upon noti�rcarivn from the permit holder or his agent, shall mike or cause to be made any necessary inspections and shalt ether approve that portion of the construcrion as comple�ed or shadl notify the permit holder or his went wherein the same fails to comply with this jade, LAYOUT: Lotked, staking in pace for building, pnor to excavati on, 2. F99TINQ� �omm�only mads lft@f08191 e� Olers are sed or trenches or basement areas are excavated. Forms and homontal reinforcing in place, verrieal reinf�rcing �u� and an jobsits or pied in place. 3. FOUNDATION INSPECTI�]V: The foundation inspection shall includ d x"vations for thickened slabs intended for the support of bearing wars, pard -dons, stn�ctura� su Pports, or equipment end special requirements for wood foundations. All forms and reinforcing steel, etc., sham be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL* Rough inspection: Commonly made to covering or concealment, before fixtures ars set, and prier to framing inspection. 5. TRUSS INSPECTION: 6.0 7 . IS 9. Inspections of trusses to see they meet shop drawing requirements and that they are installed and braced adequately, FRAME AND MASONRY INSPECTION: Commonly rade after the roof mason all framing, firestoppingy draftst�pping and bracing are In place and after the plumb nig, �ne�hanical and . are approved, electrical rough �nspecuons LATH AND/OR WALL80-ARD INSPECTION& _ Commonly made after all bathing andlar watIboard interior �s in place, beat before an plaster is applied, or before wallboard faints and fasteners are taped and flnisheds, � FINAL PLUMBING AND HEATING INSPECTION. A[1 systems in place, fixtures set, ready for accupaney FINAL ELE�TR�CAI.: fixtures and wadi covers in place. Di I 0: SIDEWALK INSPECTS:. rectory completed in panel box. IL FINAL INSPECTIONAfter dorms are set, prior tQ placing concrete.10 Commonly made after the building is completed and ready for occupancy 12.0 OCCLIPANCY PE�I�1�": . l 3. issued when, on final inspection, building is ready to occupy. OTHER IAJSPECTiON5: In addition to the ailed inspections move, the building department may make a� . require any other inspections to ascertain compliance with this od and other haws enforced by the building department. The permit holder or his agent sha11the 0�� INSPECTION CARD p inspection record on the dab site in an accessible and conspicuous place to allow the building official to make the regulred entries. The record shall holder until the final inspection has been made and approved. be maintained by the permit I have read the above and will comply in my requests for inspections bY .pp�°ve�d. k1- u�n� � 4 HOUR NOTICE prior for F-[-Prtr*1r:i1- A � a_ � �.c � Enspectians to be made. Plumbing: 359-3020 ex 326 or 313 or 359--3034 Signature: Building.* 3,59..3020 ex 326 or 313 Date: