Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00027 - Key Bank - Offices- :' _� ��� �-.. �.: -++r.r may.. ,�_.. .� . •� n CITY OF RrE%ArBUTN)%Gm BUILDING INSPECTION SEQUENCE Type of Inspections: dor on-site Wftstrucdon, from time to dme the build�n official from the permit hoIder or his agent, shall make or cause to be made any necessaryini"Ospectionsupon n�tificat'ron and shall either approve that portion of the constmrtion as completed or shall notify the permit holder or his agenx wherein the game faiEs to cvm��y with this code. � • LAYOUTO Lit corners staked, staking in place for building, prior to excavation: 2. FOOTING, Commonly made after poles or piers are set or trenches or basement areas are excavated. Fonms and horizontal reinforcing in place, vertical reinfarcing cit and an fob site or tied in place, 3.0 FOUNDATION INSPECTION: The foundation inspecdon shat included excavations for thickened nabs int ded for she support of bearing walls, partitions, structural supports, or e�u!pment and special 01 requirements for wood founta�onc AIf fn�� �n�r ra�.,�,.....:. 4. 5. p[aee. -----_...,, .....,.....� a,,., ICU , u119 aLee1, enc., snaii be in PLUMBING, ME11CH L AND ELECTRICAL: Dough inspection: Commonly made prior to eover�ng or +�vnc+eai�nent, before fixtures are set, and prior Lo, framing inspeetian. TRUSS tNSPECTiON:6 inspections of tnLsses to see they meet shop drawing requirements and that theyareinstalIed and braeed adequately. b. FMME AND MASONRY INSPECTION: Commonly made after the roof, masonry, all framing, firestoppingr draft -stopping and bracing are in place and after the plumblng, mechanical and electrical rough inspections are approved. 7.0 LATH AND/OR WALLBOARD INSPECTION: Commonly made after all I thing andlvr 11board Interior is in place, but before an plaster is applied, or before wallboard �oints and fasteners are taped and fan�shed. y 8. FINAL PLUMBING AND, HEATING INSPECTION., All systems i 9. SINAL ELECTRICAL: n place, fixtures set, ready for occupancy Fixtures and gall coags in place. Di 10. SIDEWALK INSPECTS: rectory completed in panel box. Aber forms are set, prior to placing concrete. I]. FINAL INSPECTION,. Commonly made after the building i1c completed and CCUPANCYready for occupancy PERMIT: Issued when , on final inspection, building is ready to occupy, 134 ETHER INSPECTIONS* In add i�ion to the called inspections above, the build*ng department may make or . require any other inspections to ascertain compliance wrth_ th� code and other lawsenforced by the building dePartment* iNSPECTION BARD The permit haIder or his agent shall post the inspection record on the job sits in an accessi place to allow the building official to make the required entries. The record shoji be maintained and conspicuous until the final inspection has been made and approved, �rned by the permit I have read the above and will comply In my requests for inspections bygiving� 4 HOUR NOTICE prior for Electrical: 624-3767 inspections to be made. Plumbing: 359-�2Q ex 32� or 31 3 n� ��o_�n�d Building: 359-3020 etc 326 or 313 ignature; A date: