Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00026 - Stone's Town & Country - New FaciaCITY OF REXBURG 'BUILDING INSPECTION SEQUENCE Type of Inspecdons: For on4site �vnstrue�on, from time to time the bu�[d�ng OMCIal, ' upon nouficat�an From the Pennit holder or his agent , shall make or cause to be made any ne�essa�y inspections and shall either approve that portion of the construction as Camp�e�ed yr shall notify the permit holder or his agent wherein the same fails tO comply with this code. 1.0 LAYOUT., Loi garners staked, staking in place for building, prior to excavadon: 2• FOOTING: Commonly made ager poles or piers are set or trenches or basement areas are excavated. Fos and hon*zontal reinforcing in placevertical €�mreinforcing gut and on job site or ped in place., 34 FOUNDATION INSPECTION: The found.ati.on ininspection�shali included excavations fir thickened nabs intended for tie support o-bea�ang walk, pardtons, structural suppor�s, yr equipment and special requirements for woad foundations. AJI farms and reinforcing steel, etc., shalt be in place,. 5 4s, PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspe Lation.: Commonly made prior to covering or concealment, before fixtures are seg, and -priorlo framing ijupecdon.. 5. TRUSS INSPECTION: _ Inspections of trusses to see they meet shop drawing requirements and that they are installed and braced adequately.. 64. FRAME AND MASONRY INSPECTION: Com, monly made ager the rQof,0 .' masonry, all framing, firestopping, drafttoppingand bracing are m_.place and after tie plumbing;4'mechanieal and electrica1 rough ars approved: 7q. LATH AND/OR WALLBOARD INSPEC" ?[C3N: Commonly made after all bathing and/or wallboard interioris in prate, but before any plaster �s applied, or before wallbvard joints: and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: ASI systems in place, fixtures set, ready for occupancy Q. FINAL ELECTRICAL0 Fixtures and wail covers in place. Directory completed in paned box. 10. SIDEWALK INSPECTS: After firms are set, prior to placing concrete. FINAL IhISPECTiQN: . Cornmor�ly made after the building is completed and ready for occupancy , 12. C7C�uPANCY PERMI7: Issued when, an final inspecdon, building is ready to occupy. 13* UINSPECTIONS.4 In addition to the called inspections above, the building department may make or . require any artier inspecdons to ascertain compliance with this code and other Taws enforced by the building department, INSPECTION BARD The permit harder or his agent -shall Post the ins�pectivn record on the job site in an accessible place to allow the building vffi+�ial to make the"' entries. The record shall be maintained by conspicuous holder untiI the final inspection has been made and approved, the permit I have reed the move and will campy in my requests for -inspections by giving 24 HOUR NOTICE prior for inspec�ivns tv be made: Electrical: 01.4-377 Plumbing: 359-3Q20 ex 326 or 313 or 354-3D34 Signature: k Building: 359..3020 ex 326 or .313