HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00026 - Stone's Town & Country - New FaciaCITY OF REXBURG
'BUILDING INSPECTION SEQUENCE
Type of Inspecdons: For on4site �vnstrue�on, from time to time the bu�[d�ng OMCIal, ' upon nouficat�an
From the Pennit holder or his agent , shall make or cause to be made any ne�essa�y inspections and shall either
approve that portion of the construction as Camp�e�ed yr shall notify the permit holder or his agent wherein the
same fails tO comply with this code.
1.0 LAYOUT., Loi garners staked, staking in place for building, prior to excavadon:
2• FOOTING: Commonly made ager poles or piers are set or trenches or basement areas are
excavated. Fos and hon*zontal reinforcing in placevertical €�mreinforcing gut and on job
site or ped in place.,
34 FOUNDATION INSPECTION:
The found.ati.on ininspection�shali included excavations fir thickened nabs intended for tie
support o-bea�ang walk, pardtons, structural suppor�s, yr equipment and special
requirements for woad foundations. AJI farms and reinforcing steel, etc., shalt be in
place,. 5
4s, PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspe Lation.: Commonly made prior to covering or concealment, before fixtures
are seg, and -priorlo framing ijupecdon..
5. TRUSS INSPECTION: _
Inspections of trusses to see they meet shop drawing requirements and that they are
installed and braced adequately..
64. FRAME AND MASONRY INSPECTION:
Com, monly made ager the rQof,0 .' masonry, all framing, firestopping, drafttoppingand
bracing are m_.place and after tie plumbing;4'mechanieal and electrica1 rough
ars approved:
7q. LATH AND/OR WALLBOARD INSPEC"
?[C3N: Commonly made after all bathing and/or wallboard interioris in prate, but before any
plaster �s applied, or before wallbvard joints: and fasteners are taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
ASI systems in place, fixtures set, ready for occupancy
Q. FINAL ELECTRICAL0
Fixtures and wail covers in place. Directory completed in paned box.
10. SIDEWALK INSPECTS:
After firms are set, prior to placing concrete.
FINAL IhISPECTiQN: .
Cornmor�ly made after the building is completed and ready for occupancy ,
12. C7C�uPANCY PERMI7:
Issued when, an final inspecdon, building is ready to occupy.
13* UINSPECTIONS.4
In addition to the called inspections above, the building department may make or
. require any artier inspecdons to ascertain compliance with this code and other Taws
enforced by the building department,
INSPECTION BARD
The permit harder or his agent -shall Post the ins�pectivn record on the job site in an accessible
place to allow the building vffi+�ial to make the"' entries. The record shall be maintained by conspicuous
holder untiI the final inspection has been made and approved, the permit
I have reed the move and will campy in my requests for -inspections by giving 24 HOUR NOTICE
prior for
inspec�ivns tv be made:
Electrical: 01.4-377
Plumbing: 359-3Q20 ex 326 or 313 or 354-3D34
Signature:
k
Building: 359..3020 ex 326 or .313