Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00025 - Honks 99 Cent Store - Remodel®... �. .� —r m a .. e � �. a .m. � s.�. �... Tqz.... a.�.R�s. �—reFr �'• y—�-a+rw�� :� CITY Of REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections* For on-site construction, from time to time the building official, upon nodficaton from the permit holder or his vent, small make yr cause to be made ani r�ec�es�ary inspeetion� and s'�al� elth�r approve that portion of die car�,��rutt�vn as completed or shadl notffy the P��ithfllder or his agent same fails to comply with this -code. � wherein the � • LAYOUT.* Lot comers staked, staking in place for build�n�, pri9 a or to excavation; 2. FOOTING,: Commonly made after pales or piers are set or trenches or basement areas are excavated. Fon-ns and hon"zontal reinforcing in place, vertical reinforcing cit and on job site or dediln plate. 3.6 FOUNDATION INSPECTION: The foundation inspection shat[ included excavations for thickened slabs intended for the support of bearing r+vaIls, partitions, structurai supports, or equipment and special requirements for wood foundations. Ail fomas and or steel, ems., shall be ire placeW 4. PLUMBING, MECHANICAL AND ELECTRICAL Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5.0 TRUSS INSPECTIONO0 Inspections of trusses to see they meet ship drawing requirements and that they are installed and braced adequately. 6. F R�.'�[E AND MAS�I�+,�RY 11 JSPEICTIOrN: Commonly made after the root masonry, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. 7. LATH AND/OR WALLBOARD INSPECTION: 3 9. 1.00 Commonly made ager all lathing and/or wallboard interior is in pacerlbut before any piaster is applied, or before wallboard joints and �asteners are typed and finished. FINAL PLUMBING AICD HEATINGNS�P�CTiOI'►i; All systems in place, fixtures set, ready for occupancy FINAL ELECTRICAL: Fixtures and wall covers in place. Directory completed in panel box. SIDEWALK fNSPECTS.0 After farms are set, prior to placing concrete. FINAL INSPECTION, 12. Commonly made after the building is completed and reedy for occupancy . 4CC�IPANCY PERMIT: issued when, on final inspecdon, building is ready to occupy, 13. OTHER INSPECT....IONS., In addition to the cabled inspections above, the bulfldl*ng department may make or . require any other inspections to ascertain compliance with this code and other laws enforced by the building, department. INSPECT The permit holder or his agent shall post thens e�t�oION CARD 4 p record on the jab site in an accessible and conspicuous place to allow the building official to make the required entries. The record shad[ 6e maintained by the holder until the final inspection has been made and approved,,. Permit have read the above and wiii ply in my requests for inspecdons by givine�4 H0��1R NOTICE prior for inspections to be made. E�ectrica�. X524 -37b7 Plumbing: 354-302a ex 3Z6 or 31 3 or 359-3x34 Signature:_ Building: 359-3020 ex 326 or 313 Date}