HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00024 - 12 E 1st S - Apartment RemodelV +5Y
4 CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of inspections: For on-site construction, from time to time the building official, upon notification
from the permit holder or his agent,.$hall �naA�e4or cause to be made any necessary inspections and shall either
approve thatpordon of the cvtruct�vn as conIe��d or sh�il nati thepermit holder ar hzs a ent wherein the
PP p �Y
same falls to comply with this code.
1.
LAY0UF-0.:A-- P -1tvt corners stake4 staking in place for building, prior to excavatiQn:
2. FOOTING: �� o ani� de after pates or piers are set or trenches or basement areas are
fex��ted...�rmsgad
hori�antal-reinfor�in inplace ►rerti�al reinfoxein cut and -on job
r S�it2 `OI�ti pMilig lie
3. FOUNDATION INSPECT]
The foundatibn inspection slialI jffieluded excavations for thickened slabs intended for the
support of bearing walls;partitions;'suvetural supports, or equipment and special
requirements for wood foundations. All formsand reinforcing steed, etc., shah be in
place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment, before fixtures
are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses to see they meet shop drawing requirements and that they are
instalIed and braced adequately.
b. FRAME AND MASONRY INSPECTION.
Commonly made after the roof, rnasonM all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and etectn"ca[ rough inspections
are approved. = -
7. LATH AND/OR WALLBOARD INSPECTION.,
Commonly mads after all bathing and/or wallboard interior is in place, but before any
plaster is applied, or before wallboard joints and fasteners are taped and finished.
89 FINAL PLUMBING AND HEATING INSPECTION:
All systems in pace, fixtures set, ready for occupancy
4. FINAL,ELECTRICAL.
Fixtures and waIl covers in place. Directory c4mpleA4n2pnel box.
1 O. SIDEWALK INSPECTS.
Aber forms are set, prior to placing concrete.
11. FINAL INSPECTION:
Commonly made after the
OCCUPANCY S builidin ,. „Ao.�mpieted and reay.Qccupancyfo
l2. .
,
.A A -1:Z,
Issued when , on final inspection, buildingis ready to occupy.
136 OTHER INSPECTIONS.
In addition to the ca[Ied inspections above, the building department may make or
_ ,require any other inspections to ascertain compliance with this jade and other laws
enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall past the inspection record on the job site in an accessible and conspicuous
place to allow the building official to make the required entries. The record shall be maintained by the permit
holder untiI the final inspection has been made and approved.
1 have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for
J. inspecdons to be made.
Electrical: 624-3767
Plumbing: 359-3020 ex 326 or 3 13 or 359-3034
Signatur
Building: 359-3020 ex 326 or 313
11