CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspecdons: For on-site construcdvn, from time tv time the building official, upon notification
from M@ o@rml"t hold@r or hK* J9@flt? Shill Mjk@ of r3,ugg ta bg M56g SHY A4_ e4tg A d I'm1bee ions anshall either
approve that Pordon of the construction as completed or shaIi notify the permit holder or his agent where'in the
same fails to comply with this code.
1.0 LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are
excavated. Farms and horizontal reinforcing in place, vertical reinforcing cut and on job
site or pied in pIaee.
3. FUllNDATION INSPECTION;
The foundation inspection shaIl included excavations for thickened slabs intended for the
support of bearing walls, partitions, structural supports, or equipment and special
requirements for wood foundations. All forms and reinforcing steel, etc., shadl be in
place.
4. PLUMBING, MECHANICAL AND ELECTRICAL,
Rough inspection: Commonly made prior to cavenng or concealment, before fixtures
are set, and prior to framing inspection.
5. TRUSS INSPECTION.
inspections of trusses to see they meet shop drawing requirements and that they are
instailed and braced adequately.
6. FRAME AND MASONRY INSPECTION,
Commonly mads after the roof, masonry, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electflcaI rough inspections
are approved. _
7. LATH AND/OR WALLBOARD INSPECTION&
Commonly made after all lathing and/or wallboard interior is in place, but before any
piaster is applied, or before wallboard joints and fasteners are taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
Aid systems in place, fixtures set, ready for occupancy
4. FINAL ELECTRICAL
Fixtures and walk covers in place. Directory completed in panel box.
10. SIDEWALK INSPECTS;
After forms are set, prior to placing concrete.
IL FINAL INSPECTION:
Commonly made after the building is competed and ready for occupancy .
12. aPERMIT:
Issued when, an final 'inspection, building is ready to occupy.
13. OTHER INSPECTIONS:
In addition to the caIled inspections above, the building department may make or
require any ath�er inspections to asce�ain compliance with this ��de anther haws
enforced by the building department.
INSPECTION CARD
The permit holder or his agent shad past the inspection record vn th.. job site �n an accessible and conspicuous
place to allow the buiIding official to make the required entries. The record shall be maintained by the permit
hvIder until the final inspection has been mads and approved.
I have read the above and wilI comRIy in my requests for inspections by giving 24 HOUR NOTICE prior for
0. inspections to be mads.
Electrical: b24 -37b7
Plumbing: 359-3�0
Signature:
31 3 or 359-3034
Building: 359-3020 ex 326 or 313
• k
Date: _ f3//li