March 23., 2000
RE: Les Schwab Fire Center@Rexburg, new Warehouse and canopy Addition.
Der Mr. Willis,
We have reviewed the prelimlnarY Pla"souysent to us and have the following comrnents:
1 --- The wall separating the two halves of the warehouse building does not have to be a two-
hour rated wall; therefore the one-hour wall you wanted to use will be satisfactory.
2 --- A. parapetis required on the east wall as the plans show. A parapet wall is also necessary
a�o�g the south wa.11 far the easterly 1 �.S ft oaf length where there is an.ly 5 ft. of distance between
the walk and die property Zine; or perhaps you may want to consider the different types of
construction listed �n the EXCEPTIONS to Sec. 709'.4.1 (g7 UBC) that can take the piaci of the
parapet wall,,
� --- If the door an the south wail says zn the location, shown, it will have to be a X14 hour fire
rated door., If you move it to the west so it is not located within that portion of �he sough wall
that "is any 5 ft. from the property line, the door would not have to be fire raked.
4 w-- Draft Stops,, - If there is combustible constx-uction in the roof/ceiling assembly, draft sops
shall be installed so that the area of the concealed space does not except 3000 sq. ft. and so that
the horizontal dimension between stops dies not exceed 60 ft. — UBC Sec. 708.3.1.2,Z
The sprinkling system would change these dimensions to 900a sq. ft. and 100 ft, so Z guess thia S
won't be a Problem.
5 ---- UBS Sec. X02.5, paragraph 3 : In Group H Occupancies,, rooms containing a boiler, central
heating plant or hot-water supply boiler shah be separated from the rest of the buflding bV not
fess than a two-hour occupancy separation.
upon how you intend to heat the building.
------ This mai or n7ay not be applicable, depending
6 --- UBC Sec,, 1007.4.1 - Access to Exits&*Every portio]rl of a GroUP H Occupancy having a floor
area of 200 sq. ft. or more shah have access to not fess than two separate exits or exit -access
Theraore oomaoQrs. & 105 are both required to have two separate exits.
7 -W- See UBC Sec. 1007.4.4 far door swing and Sec. 1007.4.5 for Panic Hardware.
S --- Site Pian - Wl"11 Tracie 2 & 3 be re -graded and aresloped so the storm. drainage from the far
south end of Traci 2 (between the house on the west and the Les Schwab Shop on the east) can
flow to the north to the proposed new storm drain inlet boxes'? fir, will the storm drainage
system need to be extended farther to the south todprav�e a siorna drain inlet bow in the area
between the house and the shop?
9 --- Site Flan - The area on the north side of the existing building between the building and the
back of sidewalk) would make a nice, visible landscaped area and would let you eliminate the -the 4
ft. tivide strip a1Dnothe existing building which will be maintenance problem as it is so narrow.
(.lust a cpMmeni, not a requirement.)
1 fl - -� Site Pian - The City,has a $anitarry sewer run -ung in an east -west direction somewhere near
the, sough end of the existing building and the proposed new., warehouse. We will be rurming a
TV camera throua It agh. this I zne in tae next few weeks to de'termzne where the sewer manhole (in the
vxcixuty of the new warehouse) is and will let0yu know of its exact location as soon as we find it,
Very truly
JOSEPH A. LAIRD, P.E.
CITY ENGINEER
7/25/2000
Ryan Willis
LS Construction
Prffieviue, Oregon
Dear,Ryan..ip
STATE OF IDAHO
a
12 North Center Street
Rexburg, Idaho 5344
Phone (208) 359-3Q20
fax (20$) 359-3022
e-mail rexburg@srv_net
I have renewed the construction plans dor Les Schwab Tires new warehouse in Rexburg,
Idaho. Everything hooks pretty good. I am returning an approved set of your drawings and have
attached the French Drain details that we tacked about. Benton engineering still has not sent me a
ne�v legal descxzptivz�. When I receive the new description � will attach i� to o� ap�r�ved copy of
the plans. If you have any questions please give me a call at (24$) 359-3020 ext. 314.,
S �,cerely,
Val Christensen
Assistant Engineer
1 14 3f V.;1 zy y � 1:8 z 0;
I* leuvylb.l
P.O. Box 280
2 6 North Center
Rexburg, Idaho 83440
(208) 359-3010
1994 Uniform Fire Code
Plan Review
Building Name: Lei Schwab New Warehouse
Building Address: 407 South 5th West
Plan Date: 12-31-99
Review Date : Q7-21-00
Stories: One Type of Construction: V -N
Occupancy Classification: B, S-1, S-3 Existing
New Ccnstruction Floor Area: 6,4Q4 sq. ft.
1 } .Required Fire Flow (Appendix III -A) 21250 gpT
Comments:
Reduced to
1,500
m f or automatic f ire s
Floor Area: NIA
2) Water Supply (Article 9, Section 903) Required: Yes
Fire Hydrant Location: 5L'h West 4th South, 4th Guest 4th Sough
Firs Hydrant Flows: 6, 5 4 @ 20psi
Fire
Flow
Test Location:
nth
fest 4 th South
Fire
Flow
Supplied By-.
Fire
Dept.-
Water
Supply Acceptable: Yes
Firms Hydrant Location Acceptable: Yes, adding new fire _.hydrant by
north entrance
3.)Fj-re Apparatus Access Roads (Article 9 Section 9.02)
Required: Yes
Acceptable: Yes
4) Access Roads and Fater Supply, Including Fire Hydrants Are
required To Be Installed And Made Serviceable Prior To And During
Time Of Construction (Article 9 Section. 9Q1.3) Yes
Plan Review
Pages 2
5} . Installation
1002) Required:
0f Portable Fire Extinguisher (Article 10
Yes Location Acceptable; Yes
Type Provided Acceptable: No
Section
Co=ents,.0
Ir, larger than 2-A 10 -BC because of the hazard
6) Automatic
Required:
Sprinkler
Required:
Fire Extinguishing Systems: (Article 10 lection
Yes Type Of System Being Installed: Dry
System Monitoring Required (Article 10 Section
7).Standpipes
Comments: Monitoring required over 100
(Article 10 Section
8) Fire Alarm Systems (Article 10
Sprinkler Valve Monitoring,. Yes
Fire Alarm System Acceptable: No
1003
1003.3)
10Q4) Required: No
Section 1007)Required: No
heads
Plans As Submitted
are addressed and
Are
subject
Acceptable: Yes,provided
to State Fire
highlighted items
Marshal
approval of the
automatic fire sprinkler system
Plans Checked By: Dee Owens