Loading...
HomeMy WebLinkAboutREVIEWS - 00-00021 - Les Schwab Tire Center - New WarehouseMr. Ryan Willis Project Designer L15 Construction Co. 646 No. Madras Hwy. P.O.Box 667 Prineville, Oregon 97754 STAM OF IDAHO P.O, Bax 280 12 North Center Street Rexburg, Idaho 83440 Phare (208} 359-3020 Fax (2,08) 355-3022 e-mail rexhurg@srv.net March 23., 2000 RE: Les Schwab Fire Center@Rexburg, new Warehouse and canopy Addition. Der Mr. Willis, We have reviewed the prelimlnarY Pla"souysent to us and have the following comrnents: 1 --- The wall separating the two halves of the warehouse building does not have to be a two- hour rated wall; therefore the one-hour wall you wanted to use will be satisfactory. 2 --- A. parapetis required on the east wall as the plans show. A parapet wall is also necessary a�o�g the south wa.11 far the easterly 1 �.S ft oaf length where there is an.ly 5 ft. of distance between the walk and die property Zine; or perhaps you may want to consider the different types of construction listed �n the EXCEPTIONS to Sec. 709'.4.1 (g7 UBC) that can take the piaci of the parapet wall,, � --- If the door an the south wail says zn the location, shown, it will have to be a X14 hour fire rated door., If you move it to the west so it is not located within that portion of �he sough wall that "is any 5 ft. from the property line, the door would not have to be fire raked. 4 w-- Draft Stops,, - If there is combustible constx-uction in the roof/ceiling assembly, draft sops shall be installed so that the area of the concealed space does not except 3000 sq. ft. and so that the horizontal dimension between stops dies not exceed 60 ft. — UBC Sec. 708.3.1.2,Z The sprinkling system would change these dimensions to 900a sq. ft. and 100 ft, so Z guess thia S won't be a Problem. 5 ---- UBS Sec. X02.5, paragraph 3 : In Group H Occupancies,, rooms containing a boiler, central heating plant or hot-water supply boiler shah be separated from the rest of the buflding bV not fess than a two-hour occupancy separation. upon how you intend to heat the building. ------ This mai or n7ay not be applicable, depending 6 --- UBC Sec,, 1007.4.1 - Access to Exits&*Every portio]rl of a GroUP H Occupancy having a floor area of 200 sq. ft. or more shah have access to not fess than two separate exits or exit -access Theraore oomaoQrs. & 105 are both required to have two separate exits. 7 -W- See UBC Sec. 1007.4.4 far door swing and Sec. 1007.4.5 for Panic Hardware. S --- Site Pian - Wl"11 Tracie 2 & 3 be re -graded and aresloped so the storm. drainage from the far south end of Traci 2 (between the house on the west and the Les Schwab Shop on the east) can flow to the north to the proposed new storm drain inlet boxes'? fir, will the storm drainage system need to be extended farther to the south todprav�e a siorna drain inlet bow in the area between the house and the shop? 9 --- Site Flan - The area on the north side of the existing building between the building and the back of sidewalk) would make a nice, visible landscaped area and would let you eliminate the -the 4 ft. tivide strip a1Dnothe existing building which will be maintenance problem as it is so narrow. (.lust a cpMmeni, not a requirement.) 1 fl - -� Site Pian - The City,has a $anitarry sewer run -ung in an east -west direction somewhere near the, sough end of the existing building and the proposed new., warehouse. We will be rurming a TV camera throua It agh. this I zne in tae next few weeks to de'termzne where the sewer manhole (in the vxcixuty of the new warehouse) is and will let0yu know of its exact location as soon as we find it, Very truly JOSEPH A. LAIRD, P.E. CITY ENGINEER 7/25/2000 Ryan Willis LS Construction Prffieviue, Oregon Dear,Ryan..ip STATE OF IDAHO a 12 North Center Street Rexburg, Idaho 5344 Phone (208) 359-3Q20 fax (20$) 359-3022 e-mail rexburg@srv_net I have renewed the construction plans dor Les Schwab Tires new warehouse in Rexburg, Idaho. Everything hooks pretty good. I am returning an approved set of your drawings and have attached the French Drain details that we tacked about. Benton engineering still has not sent me a ne�v legal descxzptivz�. When I receive the new description � will attach i� to o� ap�r�ved copy of the plans. If you have any questions please give me a call at (24$) 359-3020 ext. 314., S �,cerely, Val Christensen Assistant Engineer 1 14 3f V.;1 zy y � 1:8 z 0; I* leuvylb.l P.O. Box 280 2 6 North Center Rexburg, Idaho 83440 (208) 359-3010 1994 Uniform Fire Code Plan Review Building Name: Lei Schwab New Warehouse Building Address: 407 South 5th West Plan Date: 12-31-99 Review Date : Q7-21-00 Stories: One Type of Construction: V -N Occupancy Classification: B, S-1, S-3 Existing New Ccnstruction Floor Area: 6,4Q4 sq. ft. 1 } .Required Fire Flow (Appendix III -A) 21250 gpT Comments: Reduced to 1,500 m f or automatic f ire s Floor Area: NIA 2) Water Supply (Article 9, Section 903) Required: Yes Fire Hydrant Location: 5L'h West 4th South, 4th Guest 4th Sough Firs Hydrant Flows: 6, 5 4 @ 20psi Fire Flow Test Location: nth fest 4 th South Fire Flow Supplied By-. Fire Dept.- Water Supply Acceptable: Yes Firms Hydrant Location Acceptable: Yes, adding new fire _.hydrant by north entrance 3.)Fj-re Apparatus Access Roads (Article 9 Section 9.02) Required: Yes Acceptable: Yes 4) Access Roads and Fater Supply, Including Fire Hydrants Are required To Be Installed And Made Serviceable Prior To And During Time Of Construction (Article 9 Section. 9Q1.3) Yes Plan Review Pages 2 5} . Installation 1002) Required: 0f Portable Fire Extinguisher (Article 10 Yes Location Acceptable; Yes Type Provided Acceptable: No Section Co=ents,.0 Ir, larger than 2-A 10 -BC because of the hazard 6) Automatic Required: Sprinkler Required: Fire Extinguishing Systems: (Article 10 lection Yes Type Of System Being Installed: Dry System Monitoring Required (Article 10 Section 7).Standpipes Comments: Monitoring required over 100 (Article 10 Section 8) Fire Alarm Systems (Article 10 Sprinkler Valve Monitoring,. Yes Fire Alarm System Acceptable: No 1003 1003.3) 10Q4) Required: No Section 1007)Required: No heads Plans As Submitted are addressed and Are subject Acceptable: Yes,provided to State Fire highlighted items Marshal approval of the automatic fire sprinkler system Plans Checked By: Dee Owens Date: 07-21-00