Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00020 - 185 E 3rd S - New DuplexNy _ .,�.. a..,�,..,�y� *�R � � "�'$7AP -"'*•, a :?!-■r.•r�.�. �-snt,.•; Tp � .� �-. �,�. �-�r�-..-'-r.. -- - ���• •. a� ... .r - ar • ; -'Till§ ^i.. ,.r 'r"'ru�"r s� +- _. . � _ - �� � • • • v„�-*W O+ • � • -� + •7+--�•� �•.�. �. ,f� ..rte. - CITY OF RE"A"BURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to timebU the ilding official, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permet'holder or his agent wherein the same fails to comply with this code. 1.0 LAYOUT: Lo[ Corners staked. stakino in nUra fnr hInflifinn nrinr r^ o.,�,.,,r�..... 2. FOOTING: comers 3. _ I bl lRJ1VJ [rte 1;;i,LrQiQVa{& Commonly made after pales or piers are yet or trenches or basement areas are excawated• Formsand horizontal reinforcing in pace, vertical reinfvrcing cut and �n job site or tied in place.. FOUNDATION INSPECTION. The foundation inspection shall included excavations For thickened slabs intended'for the support of bearing walts, partitions, structural suppans, or equipment and special requirements for wood foundations., All forms and reinforcing steel, etc.,; shalt bein place,. f 4, PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection; Commonly made prior to cvverir�g or concealment, before fixtures are set, and prior to framing inspection. S. ?BLISS INS-PECTION: Inspections of trusses to see they meet shop drawing requirements and that they are insta{Ied and braced adequately. 6. FRAME AICD MASONRY INSPECTION: Commonly made after the roof, masonry, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections, are approved. -. 7.0 LATH AND/OR WALLBOARD INSPECTION: Commonly made after aIt Iathing and/or wallboard inter�ar ts in place, but before any plaster is app[led, a�- before wallboard joints and fasteners are taped and finished* 8. FINAL PLUMBING ,AICD HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. FINAL ELECTRICAL: Fixtures and wall covers in place. Directory completed in paned box. l D. SIDEWALK �NSPE+�TS After'forms are set, prior to placing concrete. 1 1. FINAL INSPECTION. Commonly made after the building is completed and ready foroccu'pancy 12. U�CUPAN�Y PERMIT., Issued when, on final inspection, building is ready to occupy. 13. OTHER INSPECTIONS: In addition to the called inspections above, the building department may maks or _ . require any other inspections to ascertain compliance with this code and other taws enforced by she building department, INSPECTION CARR The permit haIder or his agent shag post the inspectian record vn the jab sits �n an accessible and conspicuous place to allow �e building officiat to make the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. I have read the above and will comply in my requests forInspections by giving 24 HOUR NOTICE prior for �nspections to be made. Electrical: 6Z+3167 Plumbing.- 359-30-20 ex 3,26 or 3 1 or 359-3034 Signature: Building: 359-3020 ex 326 or 313 Date: