Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00017 - Ricks College (BYUI) - Remote Classroom RemodelCITY OF REXBURG "BUILDING INSPECTION SEQUENCE TIM f I +.Iffl I ,N= �llaN«vin: rui un•sae consuvcuon, rrom time w time the building official, upon noa fiCadon fromthe permit holder or his aaenc_ shall �,A�o .,r rn„�o t.. �,e ..,.a..._.. _________ _ w -� --a--^-�-••,••• •.a�a►w v� 3.auw� LV YC lildUC dllY niLCe��aFV Ii7Cflpr`t1Aric 7f1A rhyiL ..:tt...... approve mat portion at the consuucti�an as completed � same fails tO comply with this code. I . LAYfJUT: Lot corners staked, staking fun place for building, prior to excavation: 2. FOOTING. Commonly made after poles or piers are set or trenches or basement ares are excavated. Forms and horizontal re�nfare�ng in place, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTIC]N; The foundation inspection shall included excavations for thickened slabs intended for the support of bearing walls, partitions, struCturdI suppo�'[5r or equipment and special requirements for woad foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMBINGf MECHANICAL AND ELECTRICAL: Rough, inspection: Commonly prior madQ to covering or concealment before fixtures are set, and prior to framing inspection. s. Truss INSPECTION: Inspections of trusses to see they meet shop drawing requirements and that they ars installed and braced adequately. 6.0 FRAME AND MASONRY INSPECTION: Commonly made after the roof, masonry,aiI framing, firestopping, drafts W,Dping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. _. 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. FINAL ELECTRICAL: Fixtures and watt covers in place. Directory completed in panel box. 100 SIDEWALK INSP ,ECTS: After Forms are set, prior to placing concrete.11. FINAL INSPECTION: •----------� •••••r•.r.....vaz.a as�u a�sa6 lll 'C1LE1Ci r shad notify the permit harder or h is agent wherein the CvmmonIy made after the building i 12. OCCUPANCY s completed and ready for occupancyPERMIT: Issued whin, on final inspection, building 'i's ready to occupy. 13. OTHER INSPECTIONS: in addition to the cabled inspe0ons above, the building department may make or require any other inspections to ascertain Compliance with this code and other laws enforced by the build'i'ng department. INSPECTION GARDE The permit holder or his agent sha11 post the inspection record on the jobsite in an accessible and conspicuous place to allow the building official to make the required entries. The record shad be maintained byholder until the final inspectian has been made and a the Permit I have read the above and will com��.y �n my� requests far inspections by ,Rproved. giving 24 HOUR NOTICE pdor for --�""-��..� nspecdom to be made. Electrical: b24 -37b7 Plumbing: 359-342 lie 2b 3l�ar 359-3034 Signature.— 4 BdUding: 359--3020 ex 326 or 313 Date: