Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00016 - 691 & 687 Summerwood Dr - New TwinhomeCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the bulIdin Qfficial' upon notificationf�-v�n tie permit hailer or his agent, shah make or cause to be made any necesxa jos approve that Pordon of the construction as Completed or shall Notify thery inspections and shad either same fails to comply with this codes Permit holder or his agent Wl�e�e�n the 1.0 LAYOUT: Lvt corners naked, staffing in place for buffdipnor ' 2. FOOTING. Commonly made after poles or p�ers ares ��, to ex��va�ron; excavated. Forms and hortontal reinforcint �n trenches or basement areas are size or tied in place. g placer vertical reinforcing cut and on Job 3. F�uI'�DAT[C3N INSPECTION;* The foundation inspection shall included excavations forsupport of bearing wolfs,par�itions, structura! su thickened nabs intended for the requirements for wood fQundat�ons. AIS fon-ns PR�'�ts, o�- equipment and special �j���pand reinforcing steel, etc., shall 6e in. 4. PLUMBING, MECHAN[CAL AND ELECTRICAL: Roue inspection: Commonly made prior to covering or Concealment are set, and Prior to framing �r�spection. . before fixtures �.TRUSS INSPECTION: Inspections of Musses to see they meet shop dt-awin requirements installed and braced adequately. � equirernents and that they are 6.0F,►ME AND MASONRY INSPECTION: Commonly made after the roof, masonry, all framing, firesto jn bracing are in place and after the plumbing, me�h�nicaI and ele erica g, dr �app�ng and are a�prv�red, rough inspectivns 7. LATH AN DIDRWALLBOARD INSPECTI�DN: Comm OnlY made after all lathing and/or wallboard interior is in place but plaster' is applied, or before walIhvard joints and fasteners are to a� before any 8. FINAL PLUMBING ANIS HEATING INSPECTION: � e,� d finished. All systems in place., fixtures seg, ready for occupancy 9. FINAL ELECTRI9 Fixtures and wail rovers DirectorYin place. completed iniD. SIDEWALK INSPECTS: �panel box, � • After forms are set, prior to placing concrete. FINAL INSPECTION* Commonly made after the building is e�mpleted and �-ead� for occupancy 1-2. �CC��'Ah[CY PERMIT: - p cY . issued when, on final inspection, building is ready to occupy,1 3. OTHER INSPE CTt0�1IS: In addition to the called inspections above, the b U11ding department M aY make . , require any, other inspections to ascertain compliance with this cede and other ar enforced by the building department. �atinrs The permit holder or hisagentshall past theINSPECTION inspection CARD record on the job site in an accessible and �ot�sp�Cuous place to alIvw the building official to make the required �ntnes. ?`he record shall be maintained holder until the final inspection has been made and approved. a�ntained by the permit t have read the above and will cvn�ply �n nay requests for inspections by giwng 24 HOUR NOTICE prior for F[art rical: 62 inspections to be made. Plumbing,L 359.-zf-)2p ex 32b or 311,ar,359-3434 Signature, Building: 359-3020. ex 326 or 313 Dale: i�—