HomeMy WebLinkAboutADDENDUM - 00-00010 - Ricks College (BYUI) - Radio Station/Graphic ServicesMRY.-03-00 WED 14'28
a
e�
RICKS COLLEGE PHYS PLANT
FAX N0.
14 March 2000
Addendum IN"umber I
Ricks Colleae
12083562490
KWC/Craphic Services Buflding
Rex burg, Idah o
Ricks Project No.. i 2
00 2
This Addondun-i appliaabic to work dcsignatcd hercin shall be trnderstaod to Inc al aIP
Addcndum and as such sh�.�I b� pert of �.nd inc�ud�d in t��.c Contrac,-t- 5 all
To all bidders for furnlishinc all labor and materials necessarr for the previo�us�� me,,
Project:
Failure to aGkno�r�ed�;e receipt �f this Addendum on the bid. proposal fang. in��r result in
re�ection of your bid.
drawings:
P, 02
I . Provide and install I " 0., 4# 10 andou�d fr0mpanel "�"(E-7.9,11) to vault at �- ��r�er
of s1te_ Rrovide axic� install two �. ft-, 2,-'Iamp vapax 1� �� f Mures such �c�1�m.�ia �VT��-�--
32-DR-120--EB_ Cc�,,uul ,,vILI, (uu�1� �,���c;�.�, CU luvd�c III t'dLll�.. Prov -dc �,r1c� ffisL:,�I twc� GFCI
duplex receptacles locate per Owner in field, Connect hiahts to CR�' �,-�, autl��� to circuits �
and I 1,
2. Sheeis A4.1 and A44 Yrs The contract documents ars incorrectly numbered. Copies of the
co,rre,ctly numbered ed sheets are included as part of this adde.ndum_
3. ShecT A4.4:, alie€nate 91 Wall d����IS; detail L, she�.thinu, �h«�,�, hetwetn pane1q, i� P49 f
,rE �
panel const�u.c��on. This �v�_l not be field applied.
4. Sheet AS, 1, Room finish schedule; paint g37P-bd ���lfnys in toilet roonl, i?8.
S. sheet A8. 1, Room finish schedule and sheets A9---1-6; T'he fi.�s� �c�i�f� heights1 ire correct,�on sheet AS -
Vii. Shcets A-5-,3 and 4, Warll details; Tnsta]l double layer5 �y►fie x gyp.bd on all ce��ings-
/811
7. Sheet C2. 1, Sl'&Nvalk Peri; SSG t lachmcnt #I , Walk and stair cic.vatzons havc, been modif cd.
S. Sheet AS. I , Door Schedule; Door 47 change, door type to F, 2() „-,iLuute rated. Attachme-nt 2.
9. Sheet A8,1, Door Schedule; Door 18., �auge door ape to A, 20 mi.�ute fire raked.
Attachment I
10. Sheet X8. 1 , Door Sched'LIIC; Doer 29,, change door type to E, 24 minute ratit�d, Attachm=t ?.
1 1 . sheet A2.2, Roof Plan; Please note attic separaiior1.
12. �hetl A2. 1 , Floor Yuan; Aluminum entry ;at Vosribule 10 1., layouT revised to maiGh clffation
0n sheet Ag.. I - Attachment 3,
RICKS COLLEGE PHYS PLANT
FAX N0.
14 March 2000
Addendum IN"umber I
Ricks Colleae
12083562490
KWC/Craphic Services Buflding
Rex burg, Idah o
Ricks Project No.. i 2
00 2
This Addondun-i appliaabic to work dcsignatcd hercin shall be trnderstaod to Inc al aIP
Addcndum and as such sh�.�I b� pert of �.nd inc�ud�d in t��.c Contrac,-t- 5 all
To all bidders for furnlishinc all labor and materials necessarr for the previo�us�� me,,
Project:
Failure to aGkno�r�ed�;e receipt �f this Addendum on the bid. proposal fang. in��r result in
re�ection of your bid.
drawings:
P, 02
I . Provide and install I " 0., 4# 10 andou�d fr0mpanel "�"(E-7.9,11) to vault at �- ��r�er
of s1te_ Rrovide axic� install two �. ft-, 2,-'Iamp vapax 1� �� f Mures such �c�1�m.�ia �VT��-�--
32-DR-120--EB_ Cc�,,uul ,,vILI, (uu�1� �,���c;�.�, CU luvd�c III t'dLll�.. Prov -dc �,r1c� ffisL:,�I twc� GFCI
duplex receptacles locate per Owner in field, Connect hiahts to CR�' �,-�, autl��� to circuits �
and I 1,
2. Sheeis A4.1 and A44 Yrs The contract documents ars incorrectly numbered. Copies of the
co,rre,ctly numbered ed sheets are included as part of this adde.ndum_
3. ShecT A4.4:, alie€nate 91 Wall d����IS; detail L, she�.thinu, �h«�,�, hetwetn pane1q, i� P49 f
,rE �
panel const�u.c��on. This �v�_l not be field applied.
4. Sheet AS, 1, Room finish schedule; paint g37P-bd ���lfnys in toilet roonl, i?8.
S. sheet A8. 1, Room finish schedule and sheets A9---1-6; T'he fi.�s� �c�i�f� heights1 ire correct,�on sheet AS -
Vii. Shcets A-5-,3 and 4, Warll details; Tnsta]l double layer5 �y►fie x gyp.bd on all ce��ings-
/811
7. Sheet C2. 1, Sl'&Nvalk Peri; SSG t lachmcnt #I , Walk and stair cic.vatzons havc, been modif cd.
S. Sheet AS. I , Door Schedule; Door 47 change, door type to F, 2() „-,iLuute rated. Attachme-nt 2.
9. Sheet A8,1, Door Schedule; Door 18., �auge door ape to A, 20 mi.�ute fire raked.
Attachment I
10. Sheet X8. 1 , Door Sched'LIIC; Doer 29,, change door type to E, 24 minute ratit�d, Attachm=t ?.
1 1 . sheet A2.2, Roof Plan; Please note attic separaiior1.
12. �hetl A2. 1 , Floor Yuan; Aluminum entry ;at Vosribule 10 1., layouT revised to maiGh clffation
0n sheet Ag.. I - Attachment 3,
MAY -03-00 WED
14'i
28
RICKS COLLEGE PHYS PLANT
KRIC/Graphic Sen -ices
Addend uin NF1
14 March 2000
Pale 2
FAX N0.
12083562490
P, 03
I -1. SheQt CI. 1 , Site Plan; T11stall fife I'Ydfallt as shown on attachm4,
14, She;et A.9.3, Intenor Elevations; Revised vestibule I (7 1 aid recep��n� 102 f��r�� e�evat'��t�chn��nt��o� tons.
15. Sh�et A9,?, Refleor�d Plan-, Porch;3offit, a1umL'nuM to match othtr .�-t�#"ft�.
16, Sheet A4. 1, Deta`Ils Note 29, "oak" should
17. Sheet A$. 1, RQ:0M Finish Schedule; Office 112) fwill be carpct.
18. Sheet A4,1-3, Qu0-'115,-' Split stone can be substituted dor cast Quoins.
19. Shcet C 1. 1, Site planla; e the watGf•Iinc rr�� idp tc� IS` inside sxdw�.��. Bidar rack remaval �'vr �waterline,fir 4 yards
20. Sheet A8_ I,, Door Schedule, Overhead Door-,;
standard calors. Include hasulaiton in door..
Fi r� i sh #� he. selected from manufacturer's
2 i. Stzeet A4.3, Quol-n Detail; Height changed from 9' to S', attachement b.
Specificatv
0
I - Add Scution 029217 Cha -in Lillk Fencing, Capy attached.
Altemate, #1, Manufaciurcd panelsexterior walls �s?0
thick panes per alternate ualj det 6 -hickPanels. � i�r �a�Is; usaddendum. ais,s�e�� A-�_4_ �T�is ���e�provided
�as pari of this
3. SuPPIementary Canditionsy Liquadated damages are S 100-00per ca��ndardad:.
il
A
MAY -03-00 WED 14'29
RICKS COLLEGE PHYS PLANT
FAX N0,
20 March 2000
Addondani Number 2
Ri�ks
120835624e1%�u
KWC/Craphie,Sprvice.5:R���idin9
Rexburg, Jdall.o
Ricks Projec
t No. 72.00- 12
Thi's Addendum applicablc to work a�i�alcci hurtiii shall bt uilders ooe� to be and15 all
Addniduni d�z� as � u��! slid�� bt pal -t of and llicluded ill t1le C011tract..
To aIl bidders far fLni�1�i�.g all labor and inateria�� ne��ss�.r�r for the previously mentirolied
Project,
Fa*lu-rc to a��l�nc����lcdge rccc7pt af�khi� Aadendum on thc did proposal fon-il �a�,• resu].t ix�.
reject�on of��OuT bidip
Drawincrs-
,!� ih
1. Sheet C i .3, S -i teplan bring rough grade'to utithin 12 11 of finish floor. Slope awav from
b-uildincrzt� at 501('),,
Bid Fora,
P 0 fo r re, m
-F - rl x:11 r " penn.,T
E'. 04