HomeMy WebLinkAboutINSPECTION SEQUENCE - 00-00009 - 36 E 1st N - Commercial Storage ShedCITY OF REXBURG
BUILDING INSPECTION SEQUENCE �
T
ype of Inspections: For on-site constmcdon, from time to time the bulIding
from the permit holder or hisagent,,shall make or cause to be made an necessa ������` Lpon notification
approve that prordon of the construction as completed flt� Shah nv�i thepelm"t � �nspe�dons and shall eider
same fails to comply with this code. �Y holder or his agent wherein the
1.
LAYOUT., Lot corners naked, staking in place for building, prior to excavation:
2. FOOTING: Co-mmanIy'made after ..poles or piers- are set or trenches or basement areas are
excavated. Forms and horizontal reinforcing in place. wertrcal reinforcing cut and on job
site or died in place.
316 FOUNDATION INSPECTION: -
The foundation inspecdon.shall included excavations dor ihi"ck'e4"ne�c� s�a�s intended for the
support of bearing wa1ls, partitions, structural supports, or equipment .and special
requirements dor wood foundations. AIS farms and reinfvrc
place,, ing steel,,etc.., shall be in
4. PLUMBING, MECHANICAL ANDELECTRICAL:
Dough inspection: Commonly made prior to covering yr concealment, before fixtures
are set, and prior to fram�ng inspection:� .�
5. TRUSS INSPECTION: , : �. ._ �� , � � : _ N � ,, :� � � �,••,
Inspecdons of trusses to see they meet shop drawing requirements and that they are
installed and braced adequately.
b. FRAME AND MASONRY INSPECTION:
Commonly made after the roof, masonry, all framing, flrestopping, draftStODDing and
bearing are in place and ager the plumbing, mechanical and elect *cal rnug� inspections
are approved.
7. ,LATH AND/QR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wat[board interior is in place, but before any
plaster is applied, or before wallboard jaunts and fasteners are taped and finished.,
86 FINAL PLUMBING AND HEATING INSPECTION:
ASI systems in place, fixtures set, ready for occupancy
9. FINAL ELECTRICAL:
Fixtures and wail covers in place. Directory completed in paned box.
I0. SIDEWALK INSPECTS:
After forms are set, prior to playing concrete.
H* FINAL INSPECTION:- .
Commonly made ager the bu'ldin
120 g �is completed and ready for occupanoccupancy,
accL�pA�icY PERMIT:
Issued when, on fins[ inspection, building. isread i3. OTHER INSPECTIONS* Y to occupy,
In addition to the called inspections above the bu
iiaing dey make or
. require any other inspections to ascertain compliance with this cods and other taws
enforced by the building department.
The permit balder or his agent shaI[vst theinspecypECTIONCARDtion record on the job site in an accessible and conspicuous
place to allow the building official to make the required entries. 'The record shall be maintained byhomer anal the f�nai inspec�ivn has been made and a the
permit
have read the above and III comply cvmply in my requests for inspections by Pp�°ved.
24 HOUR NOTICE friar far
I to be made.
Electrical: 624-3767 Building: 359-3-020 ex 32
Plumbing: 3.59-3020 ex 32b or 313 or 359-30,34 6 or 313
Signature:_..),�4.1--1 wvftft�
JWool'Date: .� �2� —OBJ