HomeMy WebLinkAboutDOCS - 01-00048 - 27 W Main St - Commercial RemodelBUILDING INSPECTION SEQUENCE
Type of Inspections. dor on-site construction, from time to time the building official, upon
notification from the permit harder or his agent, shah mase or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the Kermit holder or his agent wherein the same fails to comply with this cede.
I . LAYOUT: Lot earners staked, staking in place for, builrding, prior to excavation:
2, FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on fob site or tied in place.
3. FOUNDATION INSPECTION.-
The
foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All farms and
reinforcing steel, etc., shad be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough
inspection:
Commonly made prior to
covering or concealment,
before
fixtures are
set, and friar to
framing
inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all -framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
Stale of Idaho Electrical Bureau}
7. LATH AND/OR WALLBOA.RD INSPECTION.
Commonly made after all lathing and/or wallboard interior is in place, but
before anv piaster is aqD]ied.-, or before wallboard ioints and fasteners are
taped and finished.
8r. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, (fixtures set., ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the buildingis completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to. the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laves enforced b; the building department.
INSPECTION BARD
The permit holder or his agent shall post the inspection record an the jab site in an accessible
and canspieuous place to allow the building official to make the required entrees. The record
steall be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections, by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical.- 624-3767 Building: 359-302(3 ex 326 or 313
Plumbing: 359-3020 ex 326 or 313 or 359-3a34
Signature:
Date
:
r
7
loft
r # & I q + F
b1%44 1amp
,
r At
k
R
dot
ti
s�u a -zft c
*Ism
{
A 3l
ft
Ig 5
m
alnig
a
M -%Aga
i
T
ki -1� A L CONSTRUCTT.ON
U FA C -irp-U E 0 R U P
L
J: jil
Ca
i
4
IF
h
a
am
IP
L
d-
am