Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 01-00046 - Greenbrier Association Apartments - 9 UnitsBUILDING INSPECTION SEQUENCE Tyke of Inspections-, For on-site construction, frim time to time the building official, upon notification from the permit holder or his agent, shad rake or cause to be made any necessary inspections and sham either approve that portion of the construction as comped or shall notify the permit holder or his agent' wherein the same fails to comply with phis cede. I . LAYOUT- Loi corners staked, staking ire place f og bun ding, prior to excavation: 2. FOOTING. Commonly made after poles or piers are sed or trenches or basement areas are excavated. Forms, and horizontal reinforcing tied in place, vertical reinforcing cut and on jib site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shadl included excavations for thickened slabs intended for the support of bearing walls, par#�tians, structural suppo�s, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc., shall be in place, 4. PLUMBING, MECHANICAL ASD ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures ars set, and prior to framing inspection. 5. TRUSS INSPECTIONS Inspections of Trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical sough inspections are approved. (Electrical inspection performed through Stade of Idaho electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly rade after all lathing and/or wallboard interior is in place, but before any plaster is, applied, or before wallboard joints and fasteners are taped and finished. S. FINAL PLUMBING AND NEATIh�G If��PE���C]N: Al! systemsin place, fixtures set, ready dor occupancy 9. SIDEWALK INSPECTIONS: After forms ars set, prier to p�ac�n� rancre�e_ 10. FINAL INSPECTION: Commonly made after the buildina competed eo�l��e� and ready for occupancy . 11. OCCUPANCY PERMIT: issued when, on final inspection, buvai ng is ready to occupy.. 12. OTHER INSPECTIONS: In addition to the caned inspections above, the building department may maks or require any other inspections to ascertain compliance with this cads and ether haws enforced by the building department- INSPECTION CARD The permit holder or his agent shall pos e inspection record on the job site in an accessible and conspicuous piece to allow the building official to mike the required entries. The record shall be maintained by the permit holder until the final inspectian his been made and arowed. I have read the above and will comply ire my requests for inspections by giving 24 HOURpp NOTICE prior for inspc' cl6t ic�n tobe made. Electrical.- 624-376.:t Plumbing.- 359 H2O e Sigiqature� or 313 or 359-3034 Building: 359-3020 ex 326 or 313 Date: